STEEL COMPOSITE GIRDER FOR BRIDGE AND METHOD THEREOF
The present invention relates to a steel composite girder for a bridge and a manufacturing method thereof. The method includes: a steel girder manufacturing step of manufacturing a steel girder including a first tendon including an upper flange, a lower flange, and a web extended from the lower flange to be connected with the upper flange, and placed on an upper rafter of a neutral axis in a longitudinal direction; a preparatory tensile force applying step of applying compressed stress to the upper rafter of the steel girder by tensely fixing the rafter to the first tendon with the application of first tensile force; a sheath tube installation step of placing reinforcement bars on a lower rafter of the girder and then installing a sheath tube; and a concrete synthesizing step of forming a steel composite girder by synthesizing casing concrete with the lower rafter of the girder by placing unstiffened concrete in a mold installed on the lower rafter of the girder. As such, the present invention is capable of guaranteeing a safer manufacturing process by suppressing the bucking of the steel girder during the concrete placement procedure, thereby reducing or removing transverse supports installed densely in a vertical direction to suppress the buckling of the girder during the casing concrete synthesizing procedure. Thus, the present invention is capable of being simply manufactured in an open storage space only with a floor support, and preventing damage caused by a wind load during a pileup period.
본 발명은 교량용 강합성 거더 및 그 제작 방법에 관한 것으로, 상부 플랜지와, 하부 플랜지와, 상기 하부 플랜지로부터 연장되어 상기 상부 플랜지와 연결되는 복부를 구비하고, 중립축 상연에 길이 방향을 따라 배치된 제1긴장재를 구비한 강재 거더를 제작하는 강재거더 제작단계와; 상기 제1긴장재에 제1긴장력을 도입한 상태로 긴장 정착하여, 상기 강재 거더의 중립축 상연에 압축 응력을 도입하는 예비긴장력 도입단계와; 상기 강재 거더의 하연에 철근을 배근하고 쉬스관을 설치하는 쉬스관 설치단계와; 상기 강재 거더의 하연에 설치된 거푸집에 굳지 않은 콘크리트를 타설하여 상기 강재 거더의 하연에 케이싱 콘크리트를 합성하여 강합성 거더를 형성하는 콘크리트 합성단계를; 포함하여 구성되어, 콘크리트 타설 과정에서 강재 거더의 좌굴이 발생되는 것을 억제하여 보다 안전한 제작 공정을 보장할 수 있으며, 이에 따라 케이싱 콘크리트의 합성 공정에서 강재 거더의 좌굴을 억제하기 위하여 종방향을 따라 조밀한 간격으로 설치되는 횡지지대를 줄이거나 없앨 수 있게 되어 야적지에서 바닥 받침대만 놓고 간단하게 제작할 수 있으며, 적치기간 중에 풍하중 등에 의하여 손상되지 아니하는 교량용 강합성 거더 및 그 제작 방법을 제공한다.
STEEL COMPOSITE GIRDER FOR BRIDGE AND METHOD THEREOF
The present invention relates to a steel composite girder for a bridge and a manufacturing method thereof. The method includes: a steel girder manufacturing step of manufacturing a steel girder including a first tendon including an upper flange, a lower flange, and a web extended from the lower flange to be connected with the upper flange, and placed on an upper rafter of a neutral axis in a longitudinal direction; a preparatory tensile force applying step of applying compressed stress to the upper rafter of the steel girder by tensely fixing the rafter to the first tendon with the application of first tensile force; a sheath tube installation step of placing reinforcement bars on a lower rafter of the girder and then installing a sheath tube; and a concrete synthesizing step of forming a steel composite girder by synthesizing casing concrete with the lower rafter of the girder by placing unstiffened concrete in a mold installed on the lower rafter of the girder. As such, the present invention is capable of guaranteeing a safer manufacturing process by suppressing the bucking of the steel girder during the concrete placement procedure, thereby reducing or removing transverse supports installed densely in a vertical direction to suppress the buckling of the girder during the casing concrete synthesizing procedure. Thus, the present invention is capable of being simply manufactured in an open storage space only with a floor support, and preventing damage caused by a wind load during a pileup period.
본 발명은 교량용 강합성 거더 및 그 제작 방법에 관한 것으로, 상부 플랜지와, 하부 플랜지와, 상기 하부 플랜지로부터 연장되어 상기 상부 플랜지와 연결되는 복부를 구비하고, 중립축 상연에 길이 방향을 따라 배치된 제1긴장재를 구비한 강재 거더를 제작하는 강재거더 제작단계와; 상기 제1긴장재에 제1긴장력을 도입한 상태로 긴장 정착하여, 상기 강재 거더의 중립축 상연에 압축 응력을 도입하는 예비긴장력 도입단계와; 상기 강재 거더의 하연에 철근을 배근하고 쉬스관을 설치하는 쉬스관 설치단계와; 상기 강재 거더의 하연에 설치된 거푸집에 굳지 않은 콘크리트를 타설하여 상기 강재 거더의 하연에 케이싱 콘크리트를 합성하여 강합성 거더를 형성하는 콘크리트 합성단계를; 포함하여 구성되어, 콘크리트 타설 과정에서 강재 거더의 좌굴이 발생되는 것을 억제하여 보다 안전한 제작 공정을 보장할 수 있으며, 이에 따라 케이싱 콘크리트의 합성 공정에서 강재 거더의 좌굴을 억제하기 위하여 종방향을 따라 조밀한 간격으로 설치되는 횡지지대를 줄이거나 없앨 수 있게 되어 야적지에서 바닥 받침대만 놓고 간단하게 제작할 수 있으며, 적치기간 중에 풍하중 등에 의하여 손상되지 아니하는 교량용 강합성 거더 및 그 제작 방법을 제공한다.
STEEL COMPOSITE GIRDER FOR BRIDGE AND METHOD THEREOF
교량용 강합성 거더 및 그 제작 방법
PARK SANG JIN (Autor:in) / LIM CHUL WON (Autor:in)
22.02.2017
Patent
Elektronische Ressource
Koreanisch
IPC:
E01D
BRIDGES
,
Brücken
PRESTRESSED STEEL COMPOSITE GIRDER BRIDGE AND CONSTRCTION METHOD THEREOF
Europäisches Patentamt | 2022
|Composite rahmen bridge construction method thereof and steel girder for composite rahmen bridge
Europäisches Patentamt | 2021
|Composite rahmen bridge construction method thereof and steel girder for composite rahmen bridge
Europäisches Patentamt | 2021