Pre-loading method for fundamental pile
The present invention relates to a pre-loading method for a foundation pile which improves a fixing force and a bearing force to maintain a pre-loading state in proportion to a reaction produced when pre-loading by a hydraulic jack and a reaction produced after pre-loading. A pile and a loading plate are installed after drilling and coring works, and a body unit including a second fixing body and a spring to hold a hydraulic jack is arranged on the pile and the loading plate. Then the second fixing body and a pre-loading fixing body are inserted to allow the pre-loading fixing body to be moved by a fixing force of a wedge and a latch gear only in one direction to perform work without performing a separate work for installing the hydraulic jack for pre-loading. When pre-loading by the hydraulic jack, components for supporting can maintain a pre-loading state even if a worker does not take any measures by a reaction even if the reaction is produced after pre-loading.
유압잭을 통한 선행하중 재하시 발생하는 반력과 선행하중 재하 후 발생하는 반력과 비례하여 선행하중 재하 상태를 유지하기 위한 고정력 및 지지력이 더욱 향상되는 기초파일의 선행하중 재하공법에 관한 것으로, 천공 및 코어링 작업 후 파일 및 재하판을 설치하고, 그 위에 제2 고정체 및 스프링을 포함하고 있으며 유압잭을 거치하기 위한 몸체부를 배치한 후 제2 고정체 및 선행하중 고정체를 삽입하여 쐐기에 의한 고정력 및 래치기어에 의한 선행하중 고정체가 한방향으로만 거동이 이루어질 수 있도록 함으로써, 선행하중 재하를 위한 유압잭 설치를 위한 별도 작업을 실시하지 않더라도 작업이 이루어질 수 있고, 유압잭을 통한 선행하중 재하시 이를 지지하기 위한 구성요소들이 선행하중 재하 후 발생하는 반력이 발생하더라도 그 반력에 의해 작업자가 아무런 조치를 취하지 않더라도 선행하중 재하 상태를 유지할 수 있도록 하는데 있다.
Pre-loading method for fundamental pile
The present invention relates to a pre-loading method for a foundation pile which improves a fixing force and a bearing force to maintain a pre-loading state in proportion to a reaction produced when pre-loading by a hydraulic jack and a reaction produced after pre-loading. A pile and a loading plate are installed after drilling and coring works, and a body unit including a second fixing body and a spring to hold a hydraulic jack is arranged on the pile and the loading plate. Then the second fixing body and a pre-loading fixing body are inserted to allow the pre-loading fixing body to be moved by a fixing force of a wedge and a latch gear only in one direction to perform work without performing a separate work for installing the hydraulic jack for pre-loading. When pre-loading by the hydraulic jack, components for supporting can maintain a pre-loading state even if a worker does not take any measures by a reaction even if the reaction is produced after pre-loading.
유압잭을 통한 선행하중 재하시 발생하는 반력과 선행하중 재하 후 발생하는 반력과 비례하여 선행하중 재하 상태를 유지하기 위한 고정력 및 지지력이 더욱 향상되는 기초파일의 선행하중 재하공법에 관한 것으로, 천공 및 코어링 작업 후 파일 및 재하판을 설치하고, 그 위에 제2 고정체 및 스프링을 포함하고 있으며 유압잭을 거치하기 위한 몸체부를 배치한 후 제2 고정체 및 선행하중 고정체를 삽입하여 쐐기에 의한 고정력 및 래치기어에 의한 선행하중 고정체가 한방향으로만 거동이 이루어질 수 있도록 함으로써, 선행하중 재하를 위한 유압잭 설치를 위한 별도 작업을 실시하지 않더라도 작업이 이루어질 수 있고, 유압잭을 통한 선행하중 재하시 이를 지지하기 위한 구성요소들이 선행하중 재하 후 발생하는 반력이 발생하더라도 그 반력에 의해 작업자가 아무런 조치를 취하지 않더라도 선행하중 재하 상태를 유지할 수 있도록 하는데 있다.
Pre-loading method for fundamental pile
기초파일의 선행하중 재하공법
LEE JONG BEOM (Autor:in)
31.01.2018
Patent
Elektronische Ressource
Koreanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
PILE LOADING TEST METHOD AND PILE LOADING TEST DEVICE
Europäisches Patentamt | 2021
|