RAHMEN BRIDGE CONSTRUCTION METHOD USING HINGE AND PROTECTION FOR UPSET JOINT
The present invention relates to a Rahmen bridge construction method using a girder with a lateral synthesis block to prevent a rollover, which is able to simply accommodate a connecting rebar protruding from a top surface of an abutment and to fixate the girder on the top surface of the abutment, thereby being more efficient. The lateral synthesis block comprises: a horizontal end unit penetrating material which horizontally penetrates both end units of the girder to allow an end unit to protrude to the outside the girder; a hollow bending unit distanced from a side surface of both end units of the girder to secure a vertical open space (S) and both fixing units formed on both side ends of the hollow bending unit to come in contact with a side surface of the girder; and a filling material filling the inside the vertical open space (S) to bury and integrate a strong connection material extended from the top surface of the abutment towards the inside of the vertical open space (S).The lateral synthesis block is formed on a side surface of both end units as one body.
라멘교 시공에 있어 교대 상면에 돌출 연장된 연결철근을 간단하게 수용하면서 거더를 교대상면에 고정 설치할 수 있어 보다 효율적인 라멘교 시공이 가능한 전도방지용 측면합성블록이 형성된 거더를 이용한 라멘교 시공방법에 관한 것이다. 상기 거더는 거더의 양 단부를 수평으로 관통하여 단부가 거더의 외부로 돌출 형성된 단부수평관통재; 거더의 양 단부 측면으로부터 이격되어 상하개방공간(S) 확보 가능하도록 형성된 중공절곡부와 상기 중공절곡부 양 측단에 거더의 측면에 접하도록 형성된 양 고정부; 및 교대 상면으로부터 상하개방공간(S) 내부로 연장 형성된 강결연결재가 매립되어 일체화되도록 상기 상하개방공간(S) 내부로 충진된 충진재;를 포함하는 측면합성블록이, 양 단부 측면에 일체로 형성된다.
RAHMEN BRIDGE CONSTRUCTION METHOD USING HINGE AND PROTECTION FOR UPSET JOINT
The present invention relates to a Rahmen bridge construction method using a girder with a lateral synthesis block to prevent a rollover, which is able to simply accommodate a connecting rebar protruding from a top surface of an abutment and to fixate the girder on the top surface of the abutment, thereby being more efficient. The lateral synthesis block comprises: a horizontal end unit penetrating material which horizontally penetrates both end units of the girder to allow an end unit to protrude to the outside the girder; a hollow bending unit distanced from a side surface of both end units of the girder to secure a vertical open space (S) and both fixing units formed on both side ends of the hollow bending unit to come in contact with a side surface of the girder; and a filling material filling the inside the vertical open space (S) to bury and integrate a strong connection material extended from the top surface of the abutment towards the inside of the vertical open space (S).The lateral synthesis block is formed on a side surface of both end units as one body.
라멘교 시공에 있어 교대 상면에 돌출 연장된 연결철근을 간단하게 수용하면서 거더를 교대상면에 고정 설치할 수 있어 보다 효율적인 라멘교 시공이 가능한 전도방지용 측면합성블록이 형성된 거더를 이용한 라멘교 시공방법에 관한 것이다. 상기 거더는 거더의 양 단부를 수평으로 관통하여 단부가 거더의 외부로 돌출 형성된 단부수평관통재; 거더의 양 단부 측면으로부터 이격되어 상하개방공간(S) 확보 가능하도록 형성된 중공절곡부와 상기 중공절곡부 양 측단에 거더의 측면에 접하도록 형성된 양 고정부; 및 교대 상면으로부터 상하개방공간(S) 내부로 연장 형성된 강결연결재가 매립되어 일체화되도록 상기 상하개방공간(S) 내부로 충진된 충진재;를 포함하는 측면합성블록이, 양 단부 측면에 일체로 형성된다.
RAHMEN BRIDGE CONSTRUCTION METHOD USING HINGE AND PROTECTION FOR UPSET JOINT
전도방지용 측면합성블록이 형성된 거더를 이용한 라멘교 시공방법
CHEON MIN SEUNG (Autor:in)
08.01.2018
Patent
Elektronische Ressource
Koreanisch
IPC:
E01D
BRIDGES
,
Brücken
RAHMEN BRIDGE CONSTRUCTION METHOD USING HINGE JOINT WITH HEIGHT CONTROL AND PROTECTION FOR UPSET
Europäisches Patentamt | 2016
|RAHMEN BRIDGE WITH HORSESHOE SHAPE HINGE AND METHOD CONSTRUCTING RAHMEN BRIDGE THEREOF