Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Half excavation cross roadway construction method
The present invention relates to a method of constructing a cross roadway on a lower portion of a railroad. More specifically, the method of constructing a cross roadway on a lower portion of a railroad facilitates an operation of a train and is capable of securing roadbed stability and a support force. Square pipes for a gallery and a slab are used in a structure of the present invention, thereby reducing construction costs, shortening the construction period and constructing the height of a roadway higher. The method of constructing a half excavated cross roadway comprises the following steps of: installing a rail reinforcing beam; installing a guide rail for the gallery; installing the square pipe for a gallery; excavating a wall trench; constructing the wall trench; installing the square pipe for a slab; placing concrete in the square pipe for a slab; placing concrete in the square pipe for a gallery; and excavating a tunnel and installing a structure.
본 발명은 철도의 운행을 원활하게 하고, 노반안정성과 지지력을 확보할 수 있고, 갤러리용 및 슬래브 각관이 본구조물로 사용되어 공사비가 절감되며 공기를 단축할 수 있고, 차도의 높이를 더 높게 시공할 수 있도록 한 반개착 횡단차도 시공 방법을 제공한다. 본 발명의 적절한 실시 형태에 따른 반개착 횡단차도 시공 방법은, (a) 선로에 작업장 위치를 측량한 후 작업구간에 선로의 처짐을 방지하기 위한 철도선로 레일보강빔을 침목과 연결하여 설치하고, 작업구간의 선로 하부에 설정된 개착 위치에 일정 깊이로 터파기를 실시하고, 터파기된 골의 바닥에 갤러리용 가이드레일을 설치하는 단계와; (b) 갤러리용 각관을 갤러리용 가이드레일에 지지시켜서 선로의 하부측에 위치시킨 후 갤러리용 각관의 주변에 되메우기 및 다짐을 실시하는 단계와; (c) 갤러리용 각관의 하부를 절단한 후 그 절단부 하부로 굴착을 실시하여 형성된 벽체 트렌치에 철근을 배근하고, 이후 콘크리트를 타설하여 트렌치 벽체를 시공하는 단계와; (d) 이웃한 갤러리용 각관의 사이에 개착을 실시한 후 슬래브용 각관을 설치하고, 갤러리용 각관에서 절단 작업을 하여 슬래브용 각관과 연통시키는 단계와; (e) 슬래브용 각관내에 철근을 배근하고 그 내부로 콘크리트를 타설하는 단계와; (f) 갤러리용 각관내에 철근을 배근함과 동시에 슬래브용 각관 내부로부터 갤러리용 각관측으로 노출시킨 철근과의 연결작업을 수행한 후 갤러리용 각관의 내부에 콘크리트를 타설하는 단계와; (g) 트렌치 벽체와 슬래브용 각관으로 에워싸진 단면을 굴착하여 내부 터널을 형성한 후 구조물을 설치하고 마감작업을 실시하는 단계;를 포함하여 시공되는 것을 특징으로 한다.
Half excavation cross roadway construction method
The present invention relates to a method of constructing a cross roadway on a lower portion of a railroad. More specifically, the method of constructing a cross roadway on a lower portion of a railroad facilitates an operation of a train and is capable of securing roadbed stability and a support force. Square pipes for a gallery and a slab are used in a structure of the present invention, thereby reducing construction costs, shortening the construction period and constructing the height of a roadway higher. The method of constructing a half excavated cross roadway comprises the following steps of: installing a rail reinforcing beam; installing a guide rail for the gallery; installing the square pipe for a gallery; excavating a wall trench; constructing the wall trench; installing the square pipe for a slab; placing concrete in the square pipe for a slab; placing concrete in the square pipe for a gallery; and excavating a tunnel and installing a structure.
본 발명은 철도의 운행을 원활하게 하고, 노반안정성과 지지력을 확보할 수 있고, 갤러리용 및 슬래브 각관이 본구조물로 사용되어 공사비가 절감되며 공기를 단축할 수 있고, 차도의 높이를 더 높게 시공할 수 있도록 한 반개착 횡단차도 시공 방법을 제공한다. 본 발명의 적절한 실시 형태에 따른 반개착 횡단차도 시공 방법은, (a) 선로에 작업장 위치를 측량한 후 작업구간에 선로의 처짐을 방지하기 위한 철도선로 레일보강빔을 침목과 연결하여 설치하고, 작업구간의 선로 하부에 설정된 개착 위치에 일정 깊이로 터파기를 실시하고, 터파기된 골의 바닥에 갤러리용 가이드레일을 설치하는 단계와; (b) 갤러리용 각관을 갤러리용 가이드레일에 지지시켜서 선로의 하부측에 위치시킨 후 갤러리용 각관의 주변에 되메우기 및 다짐을 실시하는 단계와; (c) 갤러리용 각관의 하부를 절단한 후 그 절단부 하부로 굴착을 실시하여 형성된 벽체 트렌치에 철근을 배근하고, 이후 콘크리트를 타설하여 트렌치 벽체를 시공하는 단계와; (d) 이웃한 갤러리용 각관의 사이에 개착을 실시한 후 슬래브용 각관을 설치하고, 갤러리용 각관에서 절단 작업을 하여 슬래브용 각관과 연통시키는 단계와; (e) 슬래브용 각관내에 철근을 배근하고 그 내부로 콘크리트를 타설하는 단계와; (f) 갤러리용 각관내에 철근을 배근함과 동시에 슬래브용 각관 내부로부터 갤러리용 각관측으로 노출시킨 철근과의 연결작업을 수행한 후 갤러리용 각관의 내부에 콘크리트를 타설하는 단계와; (g) 트렌치 벽체와 슬래브용 각관으로 에워싸진 단면을 굴착하여 내부 터널을 형성한 후 구조물을 설치하고 마감작업을 실시하는 단계;를 포함하여 시공되는 것을 특징으로 한다.
Half excavation cross roadway construction method
반개착 횡단차도 시공 방법
YUN KI CHUL (Autor:in)
09.04.2018
Patent
Elektronische Ressource
Koreanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Roadway Deformation Test for Machine Excavation Disturbance
Trans Tech Publications | 2012
|Roadway base angle pressure relief groove excavation mechanism
Europäisches Patentamt | 2024
|700,000 C.Y. roadway excavation belted across busy arterial
Engineering Index Backfile | 1947
Half-excavation and half-filling ecological form-removal-free light roadbed construction method
Europäisches Patentamt | 2023
|Small excavation crusher for underground roadway of coal mine
Europäisches Patentamt | 2020
|