Seismic Isolation Method for Seismic Performance Improvement of Structures with Seismic Isolators Base on Cutting Columns
The present invention relates to a seismic isolation method for a structure using a seismic isolation support installed in a cut column, which confirms a deformation rate and load generated in a column in each process step to promptly cope with a problem through a lifting jack and a flat jack when the problem occurs. According to the present invention, the seismic isolation method for a structure using a seismic isolation support installed in a cut column comprises: a deformation rate measurement gauge installation step (S1); a support reinforcement part installation step (S2); a lifting jack installation step (S4) of installing the lifting jack for lift between a support part and a reinforcement member; a column cutting step (S4) of cutting a part of a column between the support part and the reinforcement member; a flat jack installation step (S5) of installing the flat jack on the center of the upper surface of the cut column; a casing installation step (S6); a seismic installation support installation step (S7); a flat jack pressing step (S8) of pressing the flat jack (600) to correct a position; a filler injection step (S9) of injecting a filler into a casing; and a lifting jack disconnection step (S10) of disconnecting the lifting jack installed on the column after the filler (900) is cured. Accordingly, the lifting jack is disconnected, thereby completing the installation.
본 발명은 절단된 기둥에 지진격리받침을 이용한 구조물 지진격리화 공법에 관한 것으로, 본 발명은 기둥(100)에 변형율 측정 게이지(200)를 설치하는 변형율 측정 게이지 설치단계(S1)와, 상기 기둥(100)에 지지부(300) 및 보강부재(400)를 설치하는 지지 보강부 설치단계(S2)와, 상기 지지부(300)와 보강부재(400) 사이에 인상을 위한 인상잭(500)을 설치하는 인상잭 설치단계(S3)와, 상기 지지부(300)와 보강부재(400) 사이의 기둥(100)을 일부 절단하는 기둥 절단단계(S4)와, 절단된 상기 기둥(100)의 상면 중심에 플랫잭(600)을 설치하는 플랫잭 설치단계(S5)와, 상기 플랫잭(600)을 중심으로 한 기둥(100)의 상면에 케이싱(700)을 설치하는 케이싱 설치단계(S6)와, 케이싱(700) 상면에 지진격리받침(800)을 설치하는 지진격리받침 설치단계(S7)와, 상기 플랫잭(600)을 가압시켜 위치를 보정하는 플랫잭 가압단계(S8)와, 상기 케이싱(700)에 충진재(900)를 주입하는 충진재 주입단계(S9)와, 충진재(900) 양생후 상기 기둥(100)에 설치된 인상잭(500)을 해체시키는 인상잭 해체단계(S10)와, 상기 인상잭(500)을 해체함에 따라 설치가 완료된다. 본 발명은 구조물의 수직하중을 기초로 전달하는 각각의 기둥에 변형율 측정 게이지를 설치함에 따라 매 공정단계에서 기둥에 발생되는 변형율과 하중을 확인하여 문제 발생시 인상잭과 플랫잭을 통해 바로 대처가 가능하도록 한 장점이 있다.
Seismic Isolation Method for Seismic Performance Improvement of Structures with Seismic Isolators Base on Cutting Columns
The present invention relates to a seismic isolation method for a structure using a seismic isolation support installed in a cut column, which confirms a deformation rate and load generated in a column in each process step to promptly cope with a problem through a lifting jack and a flat jack when the problem occurs. According to the present invention, the seismic isolation method for a structure using a seismic isolation support installed in a cut column comprises: a deformation rate measurement gauge installation step (S1); a support reinforcement part installation step (S2); a lifting jack installation step (S4) of installing the lifting jack for lift between a support part and a reinforcement member; a column cutting step (S4) of cutting a part of a column between the support part and the reinforcement member; a flat jack installation step (S5) of installing the flat jack on the center of the upper surface of the cut column; a casing installation step (S6); a seismic installation support installation step (S7); a flat jack pressing step (S8) of pressing the flat jack (600) to correct a position; a filler injection step (S9) of injecting a filler into a casing; and a lifting jack disconnection step (S10) of disconnecting the lifting jack installed on the column after the filler (900) is cured. Accordingly, the lifting jack is disconnected, thereby completing the installation.
본 발명은 절단된 기둥에 지진격리받침을 이용한 구조물 지진격리화 공법에 관한 것으로, 본 발명은 기둥(100)에 변형율 측정 게이지(200)를 설치하는 변형율 측정 게이지 설치단계(S1)와, 상기 기둥(100)에 지지부(300) 및 보강부재(400)를 설치하는 지지 보강부 설치단계(S2)와, 상기 지지부(300)와 보강부재(400) 사이에 인상을 위한 인상잭(500)을 설치하는 인상잭 설치단계(S3)와, 상기 지지부(300)와 보강부재(400) 사이의 기둥(100)을 일부 절단하는 기둥 절단단계(S4)와, 절단된 상기 기둥(100)의 상면 중심에 플랫잭(600)을 설치하는 플랫잭 설치단계(S5)와, 상기 플랫잭(600)을 중심으로 한 기둥(100)의 상면에 케이싱(700)을 설치하는 케이싱 설치단계(S6)와, 케이싱(700) 상면에 지진격리받침(800)을 설치하는 지진격리받침 설치단계(S7)와, 상기 플랫잭(600)을 가압시켜 위치를 보정하는 플랫잭 가압단계(S8)와, 상기 케이싱(700)에 충진재(900)를 주입하는 충진재 주입단계(S9)와, 충진재(900) 양생후 상기 기둥(100)에 설치된 인상잭(500)을 해체시키는 인상잭 해체단계(S10)와, 상기 인상잭(500)을 해체함에 따라 설치가 완료된다. 본 발명은 구조물의 수직하중을 기초로 전달하는 각각의 기둥에 변형율 측정 게이지를 설치함에 따라 매 공정단계에서 기둥에 발생되는 변형율과 하중을 확인하여 문제 발생시 인상잭과 플랫잭을 통해 바로 대처가 가능하도록 한 장점이 있다.
Seismic Isolation Method for Seismic Performance Improvement of Structures with Seismic Isolators Base on Cutting Columns
절단된 기둥에 지진격리받침을 이용한 구조물 지진격리화 공법
LEE CHAE SUNG (Autor:in)
01.08.2018
Patent
Elektronische Ressource
Koreanisch
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
British Library Online Contents | 1994
|Europäisches Patentamt | 2017
|STABLE UNBONDED FIBER-REINFORCED ELASTOMERIC SEISMIC ISOLATORS FOR BASE ISOLATION SYSTEM
Europäisches Patentamt | 2015
|Mathematical modeling of seismic isolators
British Library Conference Proceedings | 1991
|Seismic Base Isolation of Structures
Springer Verlag | 2019
|