I Bridge pier steel I beam compound double girder construction method
The present invention relates to a bridge pier steel I beam compound double girder construction method, in which an upper steel I beam and a lower steel I beam smaller in beam height and higher in strength than the upper steel I beam are configured to abut against the lower side of the upper steel I beam and prestress is introduced by application of a pre-flexion load in the direction opposite to the use load. A reinforcing plate is complete welding-coupled on both sides of the lower surface of the upper flange of the upper steel I beam, a reinforcing plate is complete welding-coupled on both sides of the upper surface of the lower flange of the lower steel I beam or a reinforcing plate is complete welding-coupled to the lower surface, the lower flange of the upper steel I beam and the upper flange of the lower steel I beam are temporarily fastened with a high-tension bolt, a polytetrafluoroethylene (PTFE) friction prevention plate is installed on the upper side of the upper steel I beam, an auxiliary steel material is added to the upper side of the friction prevention plate, the temporarily fastened high-tension bolt is completely fastened after application of a pre-flexion load in the direction opposite to the use load, and prestress is introduced by the pre-flexion load being removed. Since the pre-flexion load is applied in the direction opposite to the use load, the rigidity of the steel I beam compound double girder can be further improved without an increase in girder height, and thus long inter-ground effects can be achieved. The PTFE friction prevention plate, the reinforcing plate, and the auxiliary steel material are additionally configured, and thus manufacturing is simple. Prestress can be uniformly and efficiently introduced to the upper or lower steel I beam, and thus the rigidity of the steel I beam compound double girder can be further improved and long inter-ground effects can be achieved.
본 발명은 상부 강재 I빔과, 상기 상부 강재 I빔보다 형고가 적고 고강도인 하부 강재 I빔을 상기 상부 강재 I빔의 하측에 덧대어 구성하고, 사용하중과 반대방향으로 프리플렉션 하중을 가하여 프리스트레스를 도입하는 교각 지점부 강재 I빔 겹보 제작방법에 있어서, 상기 상부 강재 I빔의 상부플랜지 하면의 양측에 보강판을 완전용접 결합하고, 상기 하부 강재 I빔의 하부플랜지 상면의 양측에 보강판을 완전용접 결합하거나 또는 하면에 보강판을 완전용접 결합하고, 상기 상부 강재 I빔의 하부플랜지와 상기 하부 강재 I빔의 상부플랜지를 고장력 볼트로 가체결하고, 상기 상부 강재 I빔의 상측에 PTFE(Polytetrafluoroethylene, 폴리테트라플루오로에틸렌) 마찰방지판을 설치하고, 상기 마찰방지판의 상측에는 보조강재를 덧대어 설치하고, 사용하중과 반대되는 방향으로 프리플렉션 하중을 가한 후 상기 가체결된 고장력 볼트를 완전체결하고, 상기 프리플렉션 하중을 제거하여 프리스트레스를 도입하는 교각 지점부 강재 I빔 겹보 제작방법에 관한 것으로서, 사용하중의 반대방향으로 프리플렉션 하중을 미리 가함으로써 거더의 형고를 높이지 않고 강재 I빔 겹보의 강성을 추가로 증대할 수 있게되므로 장지간화를 구현할 수 있고, PTFE 마찰방지판 및 보강판, 보조강재를 부가하여 구성함으로써, 제작이 간단하고, 상부 또는 하부 강재 I빔에 균등하고 효율적으로 프리스트레스를 도입할 수 있어 강재 I빔 겹보의 강성을 더욱 증대하여 장지간화를 구현할 수 있는 효과를 제공할 수 있다.
I Bridge pier steel I beam compound double girder construction method
The present invention relates to a bridge pier steel I beam compound double girder construction method, in which an upper steel I beam and a lower steel I beam smaller in beam height and higher in strength than the upper steel I beam are configured to abut against the lower side of the upper steel I beam and prestress is introduced by application of a pre-flexion load in the direction opposite to the use load. A reinforcing plate is complete welding-coupled on both sides of the lower surface of the upper flange of the upper steel I beam, a reinforcing plate is complete welding-coupled on both sides of the upper surface of the lower flange of the lower steel I beam or a reinforcing plate is complete welding-coupled to the lower surface, the lower flange of the upper steel I beam and the upper flange of the lower steel I beam are temporarily fastened with a high-tension bolt, a polytetrafluoroethylene (PTFE) friction prevention plate is installed on the upper side of the upper steel I beam, an auxiliary steel material is added to the upper side of the friction prevention plate, the temporarily fastened high-tension bolt is completely fastened after application of a pre-flexion load in the direction opposite to the use load, and prestress is introduced by the pre-flexion load being removed. Since the pre-flexion load is applied in the direction opposite to the use load, the rigidity of the steel I beam compound double girder can be further improved without an increase in girder height, and thus long inter-ground effects can be achieved. The PTFE friction prevention plate, the reinforcing plate, and the auxiliary steel material are additionally configured, and thus manufacturing is simple. Prestress can be uniformly and efficiently introduced to the upper or lower steel I beam, and thus the rigidity of the steel I beam compound double girder can be further improved and long inter-ground effects can be achieved.
본 발명은 상부 강재 I빔과, 상기 상부 강재 I빔보다 형고가 적고 고강도인 하부 강재 I빔을 상기 상부 강재 I빔의 하측에 덧대어 구성하고, 사용하중과 반대방향으로 프리플렉션 하중을 가하여 프리스트레스를 도입하는 교각 지점부 강재 I빔 겹보 제작방법에 있어서, 상기 상부 강재 I빔의 상부플랜지 하면의 양측에 보강판을 완전용접 결합하고, 상기 하부 강재 I빔의 하부플랜지 상면의 양측에 보강판을 완전용접 결합하거나 또는 하면에 보강판을 완전용접 결합하고, 상기 상부 강재 I빔의 하부플랜지와 상기 하부 강재 I빔의 상부플랜지를 고장력 볼트로 가체결하고, 상기 상부 강재 I빔의 상측에 PTFE(Polytetrafluoroethylene, 폴리테트라플루오로에틸렌) 마찰방지판을 설치하고, 상기 마찰방지판의 상측에는 보조강재를 덧대어 설치하고, 사용하중과 반대되는 방향으로 프리플렉션 하중을 가한 후 상기 가체결된 고장력 볼트를 완전체결하고, 상기 프리플렉션 하중을 제거하여 프리스트레스를 도입하는 교각 지점부 강재 I빔 겹보 제작방법에 관한 것으로서, 사용하중의 반대방향으로 프리플렉션 하중을 미리 가함으로써 거더의 형고를 높이지 않고 강재 I빔 겹보의 강성을 추가로 증대할 수 있게되므로 장지간화를 구현할 수 있고, PTFE 마찰방지판 및 보강판, 보조강재를 부가하여 구성함으로써, 제작이 간단하고, 상부 또는 하부 강재 I빔에 균등하고 효율적으로 프리스트레스를 도입할 수 있어 강재 I빔 겹보의 강성을 더욱 증대하여 장지간화를 구현할 수 있는 효과를 제공할 수 있다.
I Bridge pier steel I beam compound double girder construction method
교각 지점부 강재 I빔 겹보 제작방법
ROH KYUNG BEOM (Autor:in) / ROH U HYEON (Autor:in) / NO YOK GEUN (Autor:in) / NO SIL GEUN (Autor:in) / PARK CHI WOONG (Autor:in)
04.01.2019
Patent
Elektronische Ressource
Koreanisch
IPC:
E01D
BRIDGES
,
Brücken
Erecting method of pier-beam integrated construction bridge girder erection machine
Europäisches Patentamt | 2022
|Bridge Girder And Pier Steel Wire Reinforcement Method
Europäisches Patentamt | 2021
|CONTINUOUS BRIDGE CONSTRUCTION METHOD USING SUPPORT PIER GIRDER AND CONTINUOUS TENDON OF PIER
Europäisches Patentamt | 2016
|Pier and beam integrated bridge girder erection machine and hole passing construction method
Europäisches Patentamt | 2021
|