CONSTRUCTION METHOD FOR TUBULAR POLE USING EXISTING STEEL TOWER
The present invention provides an installation method for a tubular support using an existing steel tower which reduces construction costs. The installation method for a tubular support using an existing steel tower comprises: a first step of constructing a support foundation in a steel tower foundation arranged on an existing steel tower; a second step of inserting a plurality of upper main tubes arranged on an upper area into an internal space formed between a plurality of steel tower legs arranged on the existing steel tower, and then sequentially lifting the upper main tubes to an upper side of the existing steel tower to temporarily fix the upper main tubes on the existing steel tower; a third step of sequentially stacking a plurality of lower main tubes arranged on a lower area on an upper end of the support foundation to install the lower main tubes; a fourth step of stacking the plurality of upper main tubes lifted in the second step on upper ends of the lower main tubes to fix and install the upper main tubes; a fifth step of connecting an arm member to the upper main tubes; and a sixth step of removing the existing steel tower.
본 발명은 기설철탑을 이용한 관형지지물 설치공법을 제공한다. 상기 기설철탑을 이용한 관형지지물 설치공법은, 기설철탑에 구비된 철탑기초의 내측에 지지물기초를 공사하는 제1 단계와, 상기 기설철탑에 구비된 다수의 철탑주주재 사이에 형성된 내부공간으로 상부영역에 배치되는 복수의 상부메인튜브를 삽입한 후, 상기 기설철탑의 상측으로 상기 상부메인튜브를 순차적으로 인양하여 상기 기설철탑에 임시로 고정하는 제2 단계와, 상기 지지물기초의 상단에, 하부영역에 배치되는 복수의 하부메인튜브를 순차적으로 적층하여 설치하는 제3 단계와, 상기 하부메인튜브의 상단에 상기 제2 단계에서 인양된 복수의 상기 상부메인튜브를 적층하여 고정 설치하는 제4 단계와, 상기 상부메인튜브에 아암부재를 연결하는 제5 단계와, 상기 기설철탑을 철거하는 제6 단계를 포함한다.
CONSTRUCTION METHOD FOR TUBULAR POLE USING EXISTING STEEL TOWER
The present invention provides an installation method for a tubular support using an existing steel tower which reduces construction costs. The installation method for a tubular support using an existing steel tower comprises: a first step of constructing a support foundation in a steel tower foundation arranged on an existing steel tower; a second step of inserting a plurality of upper main tubes arranged on an upper area into an internal space formed between a plurality of steel tower legs arranged on the existing steel tower, and then sequentially lifting the upper main tubes to an upper side of the existing steel tower to temporarily fix the upper main tubes on the existing steel tower; a third step of sequentially stacking a plurality of lower main tubes arranged on a lower area on an upper end of the support foundation to install the lower main tubes; a fourth step of stacking the plurality of upper main tubes lifted in the second step on upper ends of the lower main tubes to fix and install the upper main tubes; a fifth step of connecting an arm member to the upper main tubes; and a sixth step of removing the existing steel tower.
본 발명은 기설철탑을 이용한 관형지지물 설치공법을 제공한다. 상기 기설철탑을 이용한 관형지지물 설치공법은, 기설철탑에 구비된 철탑기초의 내측에 지지물기초를 공사하는 제1 단계와, 상기 기설철탑에 구비된 다수의 철탑주주재 사이에 형성된 내부공간으로 상부영역에 배치되는 복수의 상부메인튜브를 삽입한 후, 상기 기설철탑의 상측으로 상기 상부메인튜브를 순차적으로 인양하여 상기 기설철탑에 임시로 고정하는 제2 단계와, 상기 지지물기초의 상단에, 하부영역에 배치되는 복수의 하부메인튜브를 순차적으로 적층하여 설치하는 제3 단계와, 상기 하부메인튜브의 상단에 상기 제2 단계에서 인양된 복수의 상기 상부메인튜브를 적층하여 고정 설치하는 제4 단계와, 상기 상부메인튜브에 아암부재를 연결하는 제5 단계와, 상기 기설철탑을 철거하는 제6 단계를 포함한다.
CONSTRUCTION METHOD FOR TUBULAR POLE USING EXISTING STEEL TOWER
기설철탑을 이용한 관형지지물 설치공법
OH BYUNG JIN (Autor:in) / KWON HYEOK JOONG (Autor:in) / CHOI BONG SIK (Autor:in) / SUNG TAE HYUN (Autor:in)
04.04.2019
Patent
Elektronische Ressource
Koreanisch
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Construction method of new steel tower using the site of existing steel tower