Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prestressed steel pipe pile and self-supporting type pile construction
An objective of the present invention is to provide a prestressed steel pipe pile and an independent temporary earth-retaining construction method using the same which insert a tension member into a hollow pipe, and introduce prestress to the tension member to introduce a prestressed steel pipe pile supporting a soil pressure to greatly reduce the number of installed struts to secure a wide work space to shorten construction time and reduce an amount of steel used by an increase in efficiency of work equipment to promote construction cost reduction and constructability improvement. To achieve the objective, the prestressed steel pipe pile comprises: a hollow pipe formed in a prescribed shape; a settling cap to block an upper and a lower portion of the hollow pipe from the outside; a tension member installed cross the interior of the hollow pipe, and fixed and installed on the exterior of the settling cap; and a filling material filled in the hollow pipe. Also, to achieve the objective, the independent temporary earth-retaining construction method using a prestressed steel pipe pile comprises: a step (S I) of assembling prestressed steel pipe piles; a step (S II) of drilling target ground where the prestressed steel pipe piles are to be installed at regular intervals in a prescribed diameter and depth to form drilled holes; a step (S III) of inserting the prestressed steel pipe piles into the drilled holes; a step (S IV) of additionally tensioning the prestressed steel pipe piles inserted into the drilled holes; and a step (S V) of excavating a front portion of the prestressed steel pipe piles and installing a soil retaining plate.
본 발명은 중공관 내에 인장재를 삽입하고, 상기 인장재에 프리스트레스를 도입하여 토압을 지지하는 프리스트레스 강관말뚝을 도입하여 버팀보 설치 개수를 대폭 줄임으로써, 넓은 작업공간을 확보하여 장비작업의 효율성 증가로 인한 공사기간의 단축 및 강재의 사용량이 감소되어 공사비 절감 및 시공성 향상을 도모하도록 한 프리스트레스 강관말뚝 및 이를 이용한 자립식 가설 흙막이 시공방법을 제공하는데 그 목적이 있다. 상기한 목적을 달성하기 위한 본 발명에 따른 프리스트레스 강관말뚝은 소정의 형상으로 이루어진 중공관과; 상기 중공관의 상부와 하부를 외부와 각각 차단시키는 정착캡과; 상기 중공관의 내부를 가로질러 설치됨과 동시에 정착캡의 외부에 고정 설치되는 인장재과; 상기 중공관의 내부에 충전되는 충전재로 구성됨을 특징으로 한다. 또한, 상기한 목적을 달성하기 위한 본 발명에 따른 프리스트레스 강관말뚝을 이용한 자립식 가설 흙막이 시공방법은 프리스트레스 강관말뚝을 조립하는 단계(S Ⅰ); 상기 프리스트레스 강관말뚝을 설치할 대상 지반에 일정한 간격을 두고, 소정의 직경 및 깊이로 천공하여 천공홀을 형성하는 단계(S Ⅱ); 상기 천공홀에 프리스트레스 강관말뚝을 근입시키는 단계(S Ⅲ); 상기 천공홀에 근입된 프리스트레스 강관말뚝을 추가 긴장하는 단계(S Ⅳ); 상기 프리스트레스 강관말뚝의 전면부를 굴착함과 동시에 토류판을 설치하는 단계(S Ⅴ)로 이루어짐을 특징으로 한다.
Prestressed steel pipe pile and self-supporting type pile construction
An objective of the present invention is to provide a prestressed steel pipe pile and an independent temporary earth-retaining construction method using the same which insert a tension member into a hollow pipe, and introduce prestress to the tension member to introduce a prestressed steel pipe pile supporting a soil pressure to greatly reduce the number of installed struts to secure a wide work space to shorten construction time and reduce an amount of steel used by an increase in efficiency of work equipment to promote construction cost reduction and constructability improvement. To achieve the objective, the prestressed steel pipe pile comprises: a hollow pipe formed in a prescribed shape; a settling cap to block an upper and a lower portion of the hollow pipe from the outside; a tension member installed cross the interior of the hollow pipe, and fixed and installed on the exterior of the settling cap; and a filling material filled in the hollow pipe. Also, to achieve the objective, the independent temporary earth-retaining construction method using a prestressed steel pipe pile comprises: a step (S I) of assembling prestressed steel pipe piles; a step (S II) of drilling target ground where the prestressed steel pipe piles are to be installed at regular intervals in a prescribed diameter and depth to form drilled holes; a step (S III) of inserting the prestressed steel pipe piles into the drilled holes; a step (S IV) of additionally tensioning the prestressed steel pipe piles inserted into the drilled holes; and a step (S V) of excavating a front portion of the prestressed steel pipe piles and installing a soil retaining plate.
본 발명은 중공관 내에 인장재를 삽입하고, 상기 인장재에 프리스트레스를 도입하여 토압을 지지하는 프리스트레스 강관말뚝을 도입하여 버팀보 설치 개수를 대폭 줄임으로써, 넓은 작업공간을 확보하여 장비작업의 효율성 증가로 인한 공사기간의 단축 및 강재의 사용량이 감소되어 공사비 절감 및 시공성 향상을 도모하도록 한 프리스트레스 강관말뚝 및 이를 이용한 자립식 가설 흙막이 시공방법을 제공하는데 그 목적이 있다. 상기한 목적을 달성하기 위한 본 발명에 따른 프리스트레스 강관말뚝은 소정의 형상으로 이루어진 중공관과; 상기 중공관의 상부와 하부를 외부와 각각 차단시키는 정착캡과; 상기 중공관의 내부를 가로질러 설치됨과 동시에 정착캡의 외부에 고정 설치되는 인장재과; 상기 중공관의 내부에 충전되는 충전재로 구성됨을 특징으로 한다. 또한, 상기한 목적을 달성하기 위한 본 발명에 따른 프리스트레스 강관말뚝을 이용한 자립식 가설 흙막이 시공방법은 프리스트레스 강관말뚝을 조립하는 단계(S Ⅰ); 상기 프리스트레스 강관말뚝을 설치할 대상 지반에 일정한 간격을 두고, 소정의 직경 및 깊이로 천공하여 천공홀을 형성하는 단계(S Ⅱ); 상기 천공홀에 프리스트레스 강관말뚝을 근입시키는 단계(S Ⅲ); 상기 천공홀에 근입된 프리스트레스 강관말뚝을 추가 긴장하는 단계(S Ⅳ); 상기 프리스트레스 강관말뚝의 전면부를 굴착함과 동시에 토류판을 설치하는 단계(S Ⅴ)로 이루어짐을 특징으로 한다.
Prestressed steel pipe pile and self-supporting type pile construction
프리스트레스 강관말뚝 및 이를 이용한 자립식 가설 흙막이 시공방법
OH YONG HWAN (Autor:in)
16.05.2019
Patent
Elektronische Ressource
Koreanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Supporting construction method based on prestressed pipe pile
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|Pile planting construction method for prestressed pipe pile
Europäisches Patentamt | 2023
|