Construction Method of Long Span Girder Bridge
The present invention relates to a construction method for a long span girder bridge and, specifically, to a construction method for a long span girder bridge, which is continued by connection assembly using a girder connection device to connect a point girder and a center girder, wherein a pier connection unit of the point girder and the girder connection device have features. The purpose of the present invention is to provide a method for efficiently constructing a long span girder by connecting and continuing the point girder and the center girder by using the girder connection device and a steel rod without using a temporary belt to improve the construction method applied with a temporary construction device including the temporary belt applied to an existing construction method for a long span girder and solving a disadvantage of the existing construction method such as disadvantageous economic feasibility and constructability. Specifically, according to the present invention, the construction method for a long span girder bridge builds the bridge of the long span by continuing a PSC girder comprising the point girder and the center girder and continues the PSC girder by connecting the girder by a method that the temporary belt is not installed at the connection unit of the girder. The construction method for a long span girder bridge minimizes delay of construction periods and generation of costs due to installation of the temporary belt. The construction method for a long span girder bridge can economically and efficiently construct the bridge with the span. The construction method for a long span girder bridge manufactures the point girder and center girder and easily continues the girder by connecting the point girder and center girder by the girder connection device. Moreover, non-shrink mortar containing polyurea used as a filler between the girders and between a precast concrete floor board and the girder during the construction minimizes joint cracks which can be generated in a structure connection unit by using effect of waterproof performance of the polyurea, improvement of adhesive power, impact resistance, and vibration resistance.
본 발명은 장경간 거더의 시공방법에 관한 것으로, 특히 지점부 거더와 중앙부 거더를 연결하기 위하여 거더연결장치를 활용하여 연결조립을 통해 연속화 하는 것으로 거더연결장치 및 지점부 거더의 교각 연결부에 특징이 있는 장경간 거더 시공 방법에 대한 것으로서 종래 장경간 거더 시공방법에 적용되는 가설벤트를 포함한 가설장비를 적용한 공법을 개선하기 위하여 가설벤트를 활용하지 않고 거더연결장치와 강봉을 활용하여 지점부 거더 및 중앙부 거더를 연결을 통해 연속화 시킴으로서 종래기술의 시공성 및 경제성이 불리한 단점을 극복하여 효율적으로 장경간 거더를 시공할 수 있게 하는 방법을 제공하는 것을 목적으로 한다. 구체적으로 본 발명의 장경간 거더의 시공방법은 지점부 거더 및 중앙부 거더로 구성되는 PSC거더를 연속화시켜서 장경간의 교량을 구축하되 거더의 연결부 위치에는 가설벤트를 설치하지 않는 방식으로 거더 연결을 통해 연속화시킴으로써, 가설벤트의 설치로 인한 비용 발생 및 공기 지연을 최소화시켜서, 경제적이고 효율적으로 경간의 교량을 시공할 수 있게 되는 효과가 있고, 지점부 거더와 중앙부 거더로 제작하여, 거더연결장치로 연결하여 시공하므로 거더의 연속화를 쉽게 구현할 수 있는 이점이 있다. 또한, 시공 중 거더간 및 프리캐스트 콘크리트 바닥판과 거더 사이에 충진재로 사용되는 폴리우레아가 포함된 무수축 몰탈은 폴리우레아의 방수성, 부착력 증대 및 내충격성, 내진동성의 효과를 활용하여 구조물 연결부에서 발생될 수 있는 이음균열등을 최소화하는 효과가 있다.
Construction Method of Long Span Girder Bridge
The present invention relates to a construction method for a long span girder bridge and, specifically, to a construction method for a long span girder bridge, which is continued by connection assembly using a girder connection device to connect a point girder and a center girder, wherein a pier connection unit of the point girder and the girder connection device have features. The purpose of the present invention is to provide a method for efficiently constructing a long span girder by connecting and continuing the point girder and the center girder by using the girder connection device and a steel rod without using a temporary belt to improve the construction method applied with a temporary construction device including the temporary belt applied to an existing construction method for a long span girder and solving a disadvantage of the existing construction method such as disadvantageous economic feasibility and constructability. Specifically, according to the present invention, the construction method for a long span girder bridge builds the bridge of the long span by continuing a PSC girder comprising the point girder and the center girder and continues the PSC girder by connecting the girder by a method that the temporary belt is not installed at the connection unit of the girder. The construction method for a long span girder bridge minimizes delay of construction periods and generation of costs due to installation of the temporary belt. The construction method for a long span girder bridge can economically and efficiently construct the bridge with the span. The construction method for a long span girder bridge manufactures the point girder and center girder and easily continues the girder by connecting the point girder and center girder by the girder connection device. Moreover, non-shrink mortar containing polyurea used as a filler between the girders and between a precast concrete floor board and the girder during the construction minimizes joint cracks which can be generated in a structure connection unit by using effect of waterproof performance of the polyurea, improvement of adhesive power, impact resistance, and vibration resistance.
본 발명은 장경간 거더의 시공방법에 관한 것으로, 특히 지점부 거더와 중앙부 거더를 연결하기 위하여 거더연결장치를 활용하여 연결조립을 통해 연속화 하는 것으로 거더연결장치 및 지점부 거더의 교각 연결부에 특징이 있는 장경간 거더 시공 방법에 대한 것으로서 종래 장경간 거더 시공방법에 적용되는 가설벤트를 포함한 가설장비를 적용한 공법을 개선하기 위하여 가설벤트를 활용하지 않고 거더연결장치와 강봉을 활용하여 지점부 거더 및 중앙부 거더를 연결을 통해 연속화 시킴으로서 종래기술의 시공성 및 경제성이 불리한 단점을 극복하여 효율적으로 장경간 거더를 시공할 수 있게 하는 방법을 제공하는 것을 목적으로 한다. 구체적으로 본 발명의 장경간 거더의 시공방법은 지점부 거더 및 중앙부 거더로 구성되는 PSC거더를 연속화시켜서 장경간의 교량을 구축하되 거더의 연결부 위치에는 가설벤트를 설치하지 않는 방식으로 거더 연결을 통해 연속화시킴으로써, 가설벤트의 설치로 인한 비용 발생 및 공기 지연을 최소화시켜서, 경제적이고 효율적으로 경간의 교량을 시공할 수 있게 되는 효과가 있고, 지점부 거더와 중앙부 거더로 제작하여, 거더연결장치로 연결하여 시공하므로 거더의 연속화를 쉽게 구현할 수 있는 이점이 있다. 또한, 시공 중 거더간 및 프리캐스트 콘크리트 바닥판과 거더 사이에 충진재로 사용되는 폴리우레아가 포함된 무수축 몰탈은 폴리우레아의 방수성, 부착력 증대 및 내충격성, 내진동성의 효과를 활용하여 구조물 연결부에서 발생될 수 있는 이음균열등을 최소화하는 효과가 있다.
Construction Method of Long Span Girder Bridge
장경간 거더교의 시공방법
KIM HEE JUNG (Autor:in)
08.08.2019
Patent
Elektronische Ressource
Koreanisch
IPC:
E01D
BRIDGES
,
Brücken
Engineering Index Backfile | 1899
PSC Construction Method of Long Span Bridge Using PSC Girder
Europäisches Patentamt | 2021
|Long girder span bridge collapses during erection
Engineering Index Backfile | 1942
Construction Monitoring of Long Span Continuous Rigid Frame Box Girder Bridge
British Library Conference Proceedings | 2011
|