Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
DIRECT TENSION BEAM AND METHOD FOR CONSTRUCTING TEMPORARY FACILITY USING THIS SAME
The present invention relates to a direct tension beam and a method for constructing a temporary facility using the same. The purpose of the present invention is to construct a temporary facility without boring a large pile hole by applying large resistance by direct tension of a flange and a web. According to the present invention, the direct tension beam includes: a beam body (10) having first and second flanges (12, 13); and two or more tendons (20) arranged to be horizontally symmetric based on the web between the first and second flanges and maintaining a tensioned state of the beam body as both sides in the longitudinal direction are individually fixed to both sides of the beam body while the tendon (20) is wired in the longitudinal direction of the beam body. One end of the tendons penetrates a first flange from the outside to the inside based on the outside of the first flange. So, after the tendon penetrates a second flange from the inside to the outside, the tendon is wired along the outside of the second flange. Also, the tendon penetrates the second flange from the outside to the inside. The other end of the tendon tensions the beam body by being fixed after the other end of the tension penetrates the first flange from the inner side to the outside.
본 발명은 다이렉트 긴장 빔 및 이를 이용한 가시설 시공 방법에 관한 것으로, 플랜지와 웨브의 직접적인 긴장을 통해 큰 저항력을 도입하고 큰 파일홀을 천공하지 않고 시공하는 것을 목적으로 한다. 본 발명에 의한 다이렉트 긴장 빔은, 제1,2플랜지(12,13)를 갖는 빔 본체(10)와; 상기 제1,2플랜지 사이의 웨브를 중심으로 하여 좌우 대칭으로 배치되는 한편, 상기 빔 본체의 길이방향을 따라 배선되면서 길이방향의 양측이 상기 빔 본체의 양측에 각각 고정되어 상기 빔 본체가 긴장된 상태를 유지하도록 하는 2개 이상의 긴장재(20)를 포함하며, 상기 긴장재는 일측 단부가 상기 제1플랜지의 외측을 기점으로 하여 상기 제1플랜지를 외측에서 내측으로 관통하여 상기 제2플랜지를 내측에서 외측으로 관통한 후 상기 제2플랜지의 외부를 따라 배선되다가 외측에서 내측을 향해 관통한 후 타측 단부가 상기 제1플랜지를 내측에서 외측으로 관통한 후 고정되어 상기 빔 본체를 긴장시킨다.
DIRECT TENSION BEAM AND METHOD FOR CONSTRUCTING TEMPORARY FACILITY USING THIS SAME
The present invention relates to a direct tension beam and a method for constructing a temporary facility using the same. The purpose of the present invention is to construct a temporary facility without boring a large pile hole by applying large resistance by direct tension of a flange and a web. According to the present invention, the direct tension beam includes: a beam body (10) having first and second flanges (12, 13); and two or more tendons (20) arranged to be horizontally symmetric based on the web between the first and second flanges and maintaining a tensioned state of the beam body as both sides in the longitudinal direction are individually fixed to both sides of the beam body while the tendon (20) is wired in the longitudinal direction of the beam body. One end of the tendons penetrates a first flange from the outside to the inside based on the outside of the first flange. So, after the tendon penetrates a second flange from the inside to the outside, the tendon is wired along the outside of the second flange. Also, the tendon penetrates the second flange from the outside to the inside. The other end of the tendon tensions the beam body by being fixed after the other end of the tension penetrates the first flange from the inner side to the outside.
본 발명은 다이렉트 긴장 빔 및 이를 이용한 가시설 시공 방법에 관한 것으로, 플랜지와 웨브의 직접적인 긴장을 통해 큰 저항력을 도입하고 큰 파일홀을 천공하지 않고 시공하는 것을 목적으로 한다. 본 발명에 의한 다이렉트 긴장 빔은, 제1,2플랜지(12,13)를 갖는 빔 본체(10)와; 상기 제1,2플랜지 사이의 웨브를 중심으로 하여 좌우 대칭으로 배치되는 한편, 상기 빔 본체의 길이방향을 따라 배선되면서 길이방향의 양측이 상기 빔 본체의 양측에 각각 고정되어 상기 빔 본체가 긴장된 상태를 유지하도록 하는 2개 이상의 긴장재(20)를 포함하며, 상기 긴장재는 일측 단부가 상기 제1플랜지의 외측을 기점으로 하여 상기 제1플랜지를 외측에서 내측으로 관통하여 상기 제2플랜지를 내측에서 외측으로 관통한 후 상기 제2플랜지의 외부를 따라 배선되다가 외측에서 내측을 향해 관통한 후 타측 단부가 상기 제1플랜지를 내측에서 외측으로 관통한 후 고정되어 상기 빔 본체를 긴장시킨다.
DIRECT TENSION BEAM AND METHOD FOR CONSTRUCTING TEMPORARY FACILITY USING THIS SAME
다이렉트 긴장 빔 및 이를 이용한 가시설 시공 방법
PARK KYUNG WON (Autor:in) / PARK SANG EUN (Autor:in) / YOON JUN HO (Autor:in)
30.09.2019
Patent
Elektronische Ressource
Koreanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
TEMPORARY FACILITY CONSTRUCTING METHOD AND HOSPITAL SHIP
Europäisches Patentamt | 2023
|STRUT BEAM USING STEEL-CONCRETE AND TENSION STEEL WIRE AND METHOD FOR CONSTRUCTING THIS SAME
Europäisches Patentamt | 2016
|TEMPORARY FRAME COLUMN AND METHOD FOR CONSTRUCTING TEMPORARY SCAFFOLD USING THE SAME
Europäisches Patentamt | 2019
|WATER BARRIER-TYPE EARTH BLOCKING STRUCTURE FOR TEMPORARY FACILITY AND METHOD OF CONSTRUCTING SAME
Europäisches Patentamt | 2017
|