Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
TEMPORARY BRIDGE AND CONSTRUCTION METHOD THERE OF
The present invention discloses a temporary bridge and a construction method thereof, which easily perform installation and disassembly between a steel girder and a PC lining board and are possible to improve reuse efficiency of the PC lining board and the steel girder. The temporary bridge, which includes: a plurality of girders spaced apart from each other; and a plurality of lining boards vertically arranged on an upper portion of the girder with respect to a longitudinal direction of the girder and installed by crossing over the plurality of girders, comprises: a first long hole vertically penetrated into the girder; a second long hole vertically penetrated into the lining board; and a steel bar passing through the second long hole and the first long hole and directly fastening the girder and the lining board.
강재거더와 PC복공판 간의 설치 및 해체를 용이하게 하고 PC복공판과 강재거더의 재사용 효율을 높일 수 있는 가설교량 및 이의 공법이 개시된다. 가설교량은 복수개가 이격 배치되는 거더와; 상기 거더의 상부에 거더의 길이방향에 대해 수직으로 배치되어 복수개의 거더를 가로질러 설치되는 복수개의 복공판을 포함하여 이루어진 가설교량에 있어서, 상기 거더에 상하 방향으로 관통 형성되는 제1 장공; 상기 복공판에 상하 방향으로 관통 형성되는 제2 장공; 및 상기 제2 장공과 제1 장공을 통과하여 거더와 복공판을 직접 체결하는 강봉을 구비한다.
TEMPORARY BRIDGE AND CONSTRUCTION METHOD THERE OF
The present invention discloses a temporary bridge and a construction method thereof, which easily perform installation and disassembly between a steel girder and a PC lining board and are possible to improve reuse efficiency of the PC lining board and the steel girder. The temporary bridge, which includes: a plurality of girders spaced apart from each other; and a plurality of lining boards vertically arranged on an upper portion of the girder with respect to a longitudinal direction of the girder and installed by crossing over the plurality of girders, comprises: a first long hole vertically penetrated into the girder; a second long hole vertically penetrated into the lining board; and a steel bar passing through the second long hole and the first long hole and directly fastening the girder and the lining board.
강재거더와 PC복공판 간의 설치 및 해체를 용이하게 하고 PC복공판과 강재거더의 재사용 효율을 높일 수 있는 가설교량 및 이의 공법이 개시된다. 가설교량은 복수개가 이격 배치되는 거더와; 상기 거더의 상부에 거더의 길이방향에 대해 수직으로 배치되어 복수개의 거더를 가로질러 설치되는 복수개의 복공판을 포함하여 이루어진 가설교량에 있어서, 상기 거더에 상하 방향으로 관통 형성되는 제1 장공; 상기 복공판에 상하 방향으로 관통 형성되는 제2 장공; 및 상기 제2 장공과 제1 장공을 통과하여 거더와 복공판을 직접 체결하는 강봉을 구비한다.
TEMPORARY BRIDGE AND CONSTRUCTION METHOD THERE OF
가설교량 및 이의 공법
KIM SUN GON (Autor:in)
01.10.2019
Patent
Elektronische Ressource
Koreanisch
IPC:
E01D
BRIDGES
,
Brücken
TEMPORARY BRIDGE AND CONSTRUCTION AND DISMANTLE METHOD THERE OF
Europäisches Patentamt | 2018
|TEMPORARY BRIDGE AND CONSTRUCTION METHOD OF TEMPORARY BRIDGE
Europäisches Patentamt | 2023
|TEMPORARY BRIDGE AND CONSTRUCTION METHOD FOR TEMPORARY BRIDGE
Europäisches Patentamt | 2020
|