Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
PC Precast concrete staircase frame construction method of core type
The present invention provides a construction method for a core type PC staircase frame, capable of obtaining structural earthquake-proof stability of a joint unit between PC members while performing rapid construction and the reduction of construction periods for a core type staircase frame. According to the appropriate embodiment of the present invention, the construction method for a core type PC staircase frame comprises: a PC column installed at a corner; one or more PC walls installed between the PC columns adjacent; a PC beam supported on the PC column and installed in the upper part of the PC wall; a PC stair landing installed at different heights on the PC wall facing the PC stair landing; and PC stairs connected to the upper and lower PC stair landings alternate when closely facing each other. An insert having a screw hole is installed at a predetermined position along one side of the PC column at a part in which the PC column and the PC wall are in contact with each other. An insert connection iron embedded in the same height as that of the insert is embedded in the PC wall. After the connection iron and the insert are coupled by a coupling bolt inserted through a coupling pocket formed in the part in which the insert connection iron is embedded, non-shrinkage mortar is constructed by being filled in the coupling pocket. The insert having the screw hole is installed at each predetermined position along one side in the part in which the neighboring PC walls are in contact with each other. The insert connection wire embedded in the same height as that of the insert is embedded along the other side. An insert coupling bolt is installed by the coupling pocket formed in the part in which the insert connection iron is embedded. So, after the connection iron and the insert are coupled, the non-shrinkage mortar is filled in the coupling pocket so that the core type PC staircase frame is constructed.
본 발명은 코어형 계단실 골조의 공기단축과 급속시공을 꾀하며 PC 부재간 접합부의 구조적 내진 안전성을 확보할 수 있도록 한 코어형 PC 계단실 골조의 시공방법을 제공한다. 본 발명의 적절한 실시 형태에 따른 코어형 PC 계단실 골조의 시공방법은, 모서리에 배치되는 PC 기둥, 이웃한 PC 기둥의 사이에 배치되는 하나 이상의 PC 벽, PC 기둥에 지지되어 PC 벽의 상부에 배치된 PC 보, 마주하는 PC 벽측에 서로 높낮이를 달리하여 배치되는 PC 계단참, 서로 가까이에서 마주보면 어긋난 상,하측 PC 계단참에 접하는 PC 계단으로 이루어지되; PC 기둥과 PC 벽이 접하는 부분에는, PC 기둥의 일측면을 따라 소정 위치마다에 나사구멍을 갖는 인서트가 설치되고, PC 벽에는 인서트와 동일 높이에 매설된 인서트 연결철물이 매설되고, 인서트 연결철물이 매설된 부분에 형성된 체결 포켓을 통해 삽입된 인서트 체결볼트로 연결철물과 인서트가 체결된 후, 체결 포켓에 무수축 몰탈이 채움되어져 시공되고; 이웃한 PC 벽이 접하는 부분에는, 어느쪽 일측면을 따라 소정 위치마다에 나사구멍을 갖는 인서트가 설치되고, 다른쪽 일측면을 따라 인서트와 동일 높이에 매설된 인서트 연결철물이 매설되고, 인서트 연결철물이 매설된 부분에 형성된 체결 포켓을 통해 인서트 체결볼트가 위치되어 연결철물과 인서트가 체결된 후, 체결 포켓에 무수축 몰탈이 채움되어져 시공된 것을 특징으로 한다.
PC Precast concrete staircase frame construction method of core type
The present invention provides a construction method for a core type PC staircase frame, capable of obtaining structural earthquake-proof stability of a joint unit between PC members while performing rapid construction and the reduction of construction periods for a core type staircase frame. According to the appropriate embodiment of the present invention, the construction method for a core type PC staircase frame comprises: a PC column installed at a corner; one or more PC walls installed between the PC columns adjacent; a PC beam supported on the PC column and installed in the upper part of the PC wall; a PC stair landing installed at different heights on the PC wall facing the PC stair landing; and PC stairs connected to the upper and lower PC stair landings alternate when closely facing each other. An insert having a screw hole is installed at a predetermined position along one side of the PC column at a part in which the PC column and the PC wall are in contact with each other. An insert connection iron embedded in the same height as that of the insert is embedded in the PC wall. After the connection iron and the insert are coupled by a coupling bolt inserted through a coupling pocket formed in the part in which the insert connection iron is embedded, non-shrinkage mortar is constructed by being filled in the coupling pocket. The insert having the screw hole is installed at each predetermined position along one side in the part in which the neighboring PC walls are in contact with each other. The insert connection wire embedded in the same height as that of the insert is embedded along the other side. An insert coupling bolt is installed by the coupling pocket formed in the part in which the insert connection iron is embedded. So, after the connection iron and the insert are coupled, the non-shrinkage mortar is filled in the coupling pocket so that the core type PC staircase frame is constructed.
본 발명은 코어형 계단실 골조의 공기단축과 급속시공을 꾀하며 PC 부재간 접합부의 구조적 내진 안전성을 확보할 수 있도록 한 코어형 PC 계단실 골조의 시공방법을 제공한다. 본 발명의 적절한 실시 형태에 따른 코어형 PC 계단실 골조의 시공방법은, 모서리에 배치되는 PC 기둥, 이웃한 PC 기둥의 사이에 배치되는 하나 이상의 PC 벽, PC 기둥에 지지되어 PC 벽의 상부에 배치된 PC 보, 마주하는 PC 벽측에 서로 높낮이를 달리하여 배치되는 PC 계단참, 서로 가까이에서 마주보면 어긋난 상,하측 PC 계단참에 접하는 PC 계단으로 이루어지되; PC 기둥과 PC 벽이 접하는 부분에는, PC 기둥의 일측면을 따라 소정 위치마다에 나사구멍을 갖는 인서트가 설치되고, PC 벽에는 인서트와 동일 높이에 매설된 인서트 연결철물이 매설되고, 인서트 연결철물이 매설된 부분에 형성된 체결 포켓을 통해 삽입된 인서트 체결볼트로 연결철물과 인서트가 체결된 후, 체결 포켓에 무수축 몰탈이 채움되어져 시공되고; 이웃한 PC 벽이 접하는 부분에는, 어느쪽 일측면을 따라 소정 위치마다에 나사구멍을 갖는 인서트가 설치되고, 다른쪽 일측면을 따라 인서트와 동일 높이에 매설된 인서트 연결철물이 매설되고, 인서트 연결철물이 매설된 부분에 형성된 체결 포켓을 통해 인서트 체결볼트가 위치되어 연결철물과 인서트가 체결된 후, 체결 포켓에 무수축 몰탈이 채움되어져 시공된 것을 특징으로 한다.
PC Precast concrete staircase frame construction method of core type
코어형 PC 계단실 골조의 시공방법
KIM SANG GEUN (Autor:in) / LEE GWANG OK (Autor:in) / LEE TAE HO (Autor:in) / KIM BO EUN (Autor:in) / OH SUNG MIN (Autor:in) / HAN SOO MIN (Autor:in) / MUN CHUN SU (Autor:in) / JUNG SUNG EUN (Autor:in) / SEO SANG YOUNG (Autor:in) / PARK HYUN SEUNG (Autor:in)
30.01.2020
Patent
Elektronische Ressource
Koreanisch
STAIRCASE PRECAST CONCRETE STRUCTURE AND CONSTRUCTION METHOD THEREOF
Europäisches Patentamt | 2025
|British Library Online Contents | 2000