The present invention relates to a burying method for a duct in terrace land on a river, and more specifically, to a burying method for a duct in terrace land on a river, which is to bury water supply pipes, sewer pipes, or power supply pipes with inserted cables around the river or under the terrace land by using an underwater construction method. According to the present invention, the burying method for a duct in terrace land on a river comprises: a first step of excavating a duct burying unit for burying a duct in terrace land on a river into planned depth and length; a second step of manufacturing a working unit in a working enclosure, in which an upper side higher than the height of water introduced into the duct burying unit up to a water surface height of the river is opened, wherein the working unit includes a propulsion rod of a cylinder, in which a reaction force wall and a pressure wheel installed on the same are attached to a front end, and a propulsion pipe which is propelled to a takeout hole penetrating the front end of the working enclosure by being connected to the pressure wheel; a third step of sinking and installing the working unit manufactured in the second step on a front end of the duct burying unit sunk in the water; a fourth step of taking out the propulsion rod of the cylinder installed in the working unit by a reaction force of the reaction force wall to push the propulsion pipe installed on the pressure wheel of the front end out of the takeout hole of the working unit; and a fifth step of introducing the propulsion rod into the cylinder, inputting another propulsion pipe from an upper side of the working unit into the portion between the pressure wheel and the propulsion pipe, welding the other propulsion pipe to be watertight with the propulsion pipe on the front end, propelling the same as the propulsion rod, repeating the above procedures to continuously form a duct for the planned length, and refilling with the excavated soil for preventing the propulsion pipe connected in the process from being elevated by a water pressure to bury the duct. According to the burying method for a duct in terrace land on a river, construction costs are saved and working time is reduced.
본 발명은 하천 고수부지의 관로 매설공법에 관한 것으로, 더욱 상세하게는 하천의 주위나 고수부지의 지중에 상하수도관이나 케이블을 인입하는 전력관 등을 수중공법으로 매설하는 하천 고수부지의 관로 매설공법에 관한 것이다. 본 발명의 하천 고수부지의 관로 매설공법은 하천의 고수부지에 관로를 매설할 관로 매설부를 계획심도와 길이로 굴착하는 제1단계; 관로매설부에 하천의 수위 높이로 유입된 물의 높이보다 높은 상부가 개방된 작업함체의 내부에 반력벽과 이에 설치된 및 압륜을 선단에 부착한 실린더의 추진로드와, 압륜에 연결되어 작업함체의 선단에 관통한 인출공으로 추진되는 추진관으로 구성된 작업구를 제작하는 제2단계; 상기 제2단계에서 제작된 작업구를 물에 잠긴 관로매설부의 선단에 가라앉혀 설치하는 제3단계; 상기 작업구의 내부에 설치된 실린더의 추진로드를 반력벽의 반력으로 인출시켜 선단의 압에 설치한 추진관을 작업구의 인출공 밖으로 밀어내는 제4단계; 상기 추진로드를 실린더의 내부로 인입시켜 압륜과 상기 추진관과의 사이에 또 다른 추진관을 작업구의 상부로 부터 투입시키고 선단의 추진관과 수밀되게 용접하여 추진로드로서 추진시키는 단계를 반복하여 계획된 길이 만큼 관로를 연속 형성하고 이 과정에서 연결된 추진관이 물의 수압으로 부상하지 않도록 굴착한 흙을 되메우기하여 관로를 매설하는 제5단계; 로 구성됨을 특징으로 한다.
laying method for a drain pipe in a high-level stream area
The present invention relates to a burying method for a duct in terrace land on a river, and more specifically, to a burying method for a duct in terrace land on a river, which is to bury water supply pipes, sewer pipes, or power supply pipes with inserted cables around the river or under the terrace land by using an underwater construction method. According to the present invention, the burying method for a duct in terrace land on a river comprises: a first step of excavating a duct burying unit for burying a duct in terrace land on a river into planned depth and length; a second step of manufacturing a working unit in a working enclosure, in which an upper side higher than the height of water introduced into the duct burying unit up to a water surface height of the river is opened, wherein the working unit includes a propulsion rod of a cylinder, in which a reaction force wall and a pressure wheel installed on the same are attached to a front end, and a propulsion pipe which is propelled to a takeout hole penetrating the front end of the working enclosure by being connected to the pressure wheel; a third step of sinking and installing the working unit manufactured in the second step on a front end of the duct burying unit sunk in the water; a fourth step of taking out the propulsion rod of the cylinder installed in the working unit by a reaction force of the reaction force wall to push the propulsion pipe installed on the pressure wheel of the front end out of the takeout hole of the working unit; and a fifth step of introducing the propulsion rod into the cylinder, inputting another propulsion pipe from an upper side of the working unit into the portion between the pressure wheel and the propulsion pipe, welding the other propulsion pipe to be watertight with the propulsion pipe on the front end, propelling the same as the propulsion rod, repeating the above procedures to continuously form a duct for the planned length, and refilling with the excavated soil for preventing the propulsion pipe connected in the process from being elevated by a water pressure to bury the duct. According to the burying method for a duct in terrace land on a river, construction costs are saved and working time is reduced.
본 발명은 하천 고수부지의 관로 매설공법에 관한 것으로, 더욱 상세하게는 하천의 주위나 고수부지의 지중에 상하수도관이나 케이블을 인입하는 전력관 등을 수중공법으로 매설하는 하천 고수부지의 관로 매설공법에 관한 것이다. 본 발명의 하천 고수부지의 관로 매설공법은 하천의 고수부지에 관로를 매설할 관로 매설부를 계획심도와 길이로 굴착하는 제1단계; 관로매설부에 하천의 수위 높이로 유입된 물의 높이보다 높은 상부가 개방된 작업함체의 내부에 반력벽과 이에 설치된 및 압륜을 선단에 부착한 실린더의 추진로드와, 압륜에 연결되어 작업함체의 선단에 관통한 인출공으로 추진되는 추진관으로 구성된 작업구를 제작하는 제2단계; 상기 제2단계에서 제작된 작업구를 물에 잠긴 관로매설부의 선단에 가라앉혀 설치하는 제3단계; 상기 작업구의 내부에 설치된 실린더의 추진로드를 반력벽의 반력으로 인출시켜 선단의 압에 설치한 추진관을 작업구의 인출공 밖으로 밀어내는 제4단계; 상기 추진로드를 실린더의 내부로 인입시켜 압륜과 상기 추진관과의 사이에 또 다른 추진관을 작업구의 상부로 부터 투입시키고 선단의 추진관과 수밀되게 용접하여 추진로드로서 추진시키는 단계를 반복하여 계획된 길이 만큼 관로를 연속 형성하고 이 과정에서 연결된 추진관이 물의 수압으로 부상하지 않도록 굴착한 흙을 되메우기하여 관로를 매설하는 제5단계; 로 구성됨을 특징으로 한다.
laying method for a drain pipe in a high-level stream area
하천 고수부지의 관로 매설공법