CONSTRUCTION METHOD OF TEMPORARY STRUCTURE WITHOUT CENTRAL FILE
The present invention relates to a method for constructing a temporary facility, which constructs the temporary facility on an underground upper portion excavated during bed excavation. The method for a constructing a temporary facility without a central pile includes the following steps of: constructing a first temporary facility and a first temporary foundation supporting one end portion of the first temporary facility at one side; constructing a second temporary facility and a second temporary foundation supporting one end portion of the second temporary facility at the other side; constructing a third temporary facility between the first temporary facility and the second temporary facility; installing an arch-shaped strut coupled to the first temporary facility, the second temporary facility, and the third temporary facility and formed on lower portions of the first temporary facility, the second temporary facility and the third temporary facility to support the same; and removing the first temporary foundation and the second temporary foundation. Therefore, the method for constructing a temporary facility can shorten a construction cost and a construction period.
본 발명은 터파기를 진행하면서 굴착된 지하 상부에 가시설을 시공하는 가시설 시공공법에 있어서, 일측에 제1차 가시설 및 상기 제1차 가시설의 일단부를 지지하는 제1 임시기초를 시공하는 단계; 타측에 제2차 가시설 및 상기 제2차 가시설의 일단부를 지지하는 제2 임시기초를 시공하는 단계; 상기 제1차 가시설 및 상기 제2차 가시설 사이에 제3차 가시설을 시공하는 단계; 상기 제1차 가시설, 상기 제2차 가시설, 및 상기 제3차 가시설과 결합되고, 이를 지지하기 위하여 상기 제1차 가시설, 상기 제2차 가시설, 및 상기 제3차 가시설 하부에 아치형 버팀보를 설치하는 단계; 및 상기 제1 임시기초 및 상기 제2 임시기초를 제거하는 단계를 포함하는, 중앙파일 없는 가시설 시공공법을 제공하는 것이다.
CONSTRUCTION METHOD OF TEMPORARY STRUCTURE WITHOUT CENTRAL FILE
The present invention relates to a method for constructing a temporary facility, which constructs the temporary facility on an underground upper portion excavated during bed excavation. The method for a constructing a temporary facility without a central pile includes the following steps of: constructing a first temporary facility and a first temporary foundation supporting one end portion of the first temporary facility at one side; constructing a second temporary facility and a second temporary foundation supporting one end portion of the second temporary facility at the other side; constructing a third temporary facility between the first temporary facility and the second temporary facility; installing an arch-shaped strut coupled to the first temporary facility, the second temporary facility, and the third temporary facility and formed on lower portions of the first temporary facility, the second temporary facility and the third temporary facility to support the same; and removing the first temporary foundation and the second temporary foundation. Therefore, the method for constructing a temporary facility can shorten a construction cost and a construction period.
본 발명은 터파기를 진행하면서 굴착된 지하 상부에 가시설을 시공하는 가시설 시공공법에 있어서, 일측에 제1차 가시설 및 상기 제1차 가시설의 일단부를 지지하는 제1 임시기초를 시공하는 단계; 타측에 제2차 가시설 및 상기 제2차 가시설의 일단부를 지지하는 제2 임시기초를 시공하는 단계; 상기 제1차 가시설 및 상기 제2차 가시설 사이에 제3차 가시설을 시공하는 단계; 상기 제1차 가시설, 상기 제2차 가시설, 및 상기 제3차 가시설과 결합되고, 이를 지지하기 위하여 상기 제1차 가시설, 상기 제2차 가시설, 및 상기 제3차 가시설 하부에 아치형 버팀보를 설치하는 단계; 및 상기 제1 임시기초 및 상기 제2 임시기초를 제거하는 단계를 포함하는, 중앙파일 없는 가시설 시공공법을 제공하는 것이다.
CONSTRUCTION METHOD OF TEMPORARY STRUCTURE WITHOUT CENTRAL FILE
중앙파일 없는 가시설 시공공법
LIM CHURL SOO (Autor:in)
06.08.2020
Patent
Elektronische Ressource
Koreanisch
CONSTRUCTION METHOD FOR UNDERGROUND STRUCTURE WITHOUT TEMPORARY STRUCTURE
Europäisches Patentamt | 2015
STADIUM SLOPE BEAM CONSTRUCTION STRUCTURE WITHOUT TEMPORARY SUPPORT
Europäisches Patentamt | 2024
|Temporary temporary bridge structure and construction method
Europäisches Patentamt | 2024
|CONSTRUCTION METHOD OF BRIDGE WITHOUT TEMPORARY BRIDGE
Europäisches Patentamt | 2018
|