PREFABRICATED PRECAST BRIDGE AND CONSTRUCTION METHOD THEREOF
The present invention provides a prefabricated precast bridge comprising: a pile (100) installed upward from the ground; a coping bracket (200) including a cap (210) having a hollow first insertion hole (212) with an open lower part, and a support plate (220) formed at a lower end of the cap (210) to protrude radially outward along the outer circumference of the cap (210); and a coping (300) having a hollow second insertion hole (310) with an open lower part. An upper end of the pile (100) is inserted into the first insertion hole (212), the cap (210) is inserted into the second insertion hole (310), a lower surface of the coping (300) is seated on the support plate 220, and the upper end of the pile (100) is inserted and positioned in the second insertion hole (310). Accordingly, since the coping (300) is stably supported with the minimal and simple components, the costs of manufacturing and constructing each component can be reduced, and the construction period can be shortened.
본 발명은 지면으로부터 상방으로 설치되는 파일(100); 하부가 개방된 중공의 제1삽입홀(212)이 형성되는 캡(210) 및 상기 캡(210)의 하단에 캡(210)의 외주를 따라 반경방향 외측으로 돌출형성되는 지지판(220)을 포함하여 구성되는 코핑브라켓(200); 및 하부가 개방된 중공의 제2삽입홀(310)이 형성되는 코핑(300)을 포함하는, 조립식 프리캐스트 교량을 제공한다. 상기 제1삽입홀(212)에는 상기 파일(100)의 상단부가 삽입되며 상기 제2삽입홀(310)에는 상기 캡(210)이 삽입되고, 상기 코핑(300)의 하면은 상기 지지판(220)에 안착되고, 상기 파일(100)의 상단부는 상기 제2삽입홀(310)의 내측에 삽입되어 위치한다. 이에, 최소한의 단순한 구성으로 코핑(300)이 안정적으로 지지되므로 각 구성의 제조비용 및 공사비용을 절감할 수 있고 공사기간을 단축할 수 있다.
PREFABRICATED PRECAST BRIDGE AND CONSTRUCTION METHOD THEREOF
The present invention provides a prefabricated precast bridge comprising: a pile (100) installed upward from the ground; a coping bracket (200) including a cap (210) having a hollow first insertion hole (212) with an open lower part, and a support plate (220) formed at a lower end of the cap (210) to protrude radially outward along the outer circumference of the cap (210); and a coping (300) having a hollow second insertion hole (310) with an open lower part. An upper end of the pile (100) is inserted into the first insertion hole (212), the cap (210) is inserted into the second insertion hole (310), a lower surface of the coping (300) is seated on the support plate 220, and the upper end of the pile (100) is inserted and positioned in the second insertion hole (310). Accordingly, since the coping (300) is stably supported with the minimal and simple components, the costs of manufacturing and constructing each component can be reduced, and the construction period can be shortened.
본 발명은 지면으로부터 상방으로 설치되는 파일(100); 하부가 개방된 중공의 제1삽입홀(212)이 형성되는 캡(210) 및 상기 캡(210)의 하단에 캡(210)의 외주를 따라 반경방향 외측으로 돌출형성되는 지지판(220)을 포함하여 구성되는 코핑브라켓(200); 및 하부가 개방된 중공의 제2삽입홀(310)이 형성되는 코핑(300)을 포함하는, 조립식 프리캐스트 교량을 제공한다. 상기 제1삽입홀(212)에는 상기 파일(100)의 상단부가 삽입되며 상기 제2삽입홀(310)에는 상기 캡(210)이 삽입되고, 상기 코핑(300)의 하면은 상기 지지판(220)에 안착되고, 상기 파일(100)의 상단부는 상기 제2삽입홀(310)의 내측에 삽입되어 위치한다. 이에, 최소한의 단순한 구성으로 코핑(300)이 안정적으로 지지되므로 각 구성의 제조비용 및 공사비용을 절감할 수 있고 공사기간을 단축할 수 있다.
PREFABRICATED PRECAST BRIDGE AND CONSTRUCTION METHOD THEREOF
조립식 프리캐스트 교량 및 그 시공방법
JUN HO LEE (Autor:in) / DONG HYUCK LEE (Autor:in)
28.09.2020
Patent
Elektronische Ressource
Koreanisch
IPC:
E01D
BRIDGES
,
Brücken
PREFABRICATED PRECAST BRIDGE AND CONSTRUCTION METHOD THEREOF
Europäisches Patentamt | 2020
|Prefabricated Precast Structure and Construction Method Thereof
Europäisches Patentamt | 2019
|Precast Prefabricated Bridge and Construction Method of Bridge Using by This
Europäisches Patentamt | 2019
|PREFABRICATED PRECAST PIER AND CONSTRUCTION METHOD THEREOF
Europäisches Patentamt | 2020
|