Thrust pile with prestress and self-supporting type pile construction using it
The present invention is to provide an H-pile introduced with a prestress, which introduces a prestress beam self-supporting constructing method for installing a hanging type bracket on a retaining wall H-pile, installing a tension material to the hanging type bracket, and applying a tensible force to the tension material to support an earth pressure such that the number of installation of struts is remarkably reduced to secure a wide working space so as to reduce a construction period due to an increase in equipment work efficiency and reduce construction costs and improve constructability due to reduction in the usage of a steel material; and to a method for constructing a self-supporting type temporary retaining wall using the same. To this end, the H-pile introduced with a prestress comprises: an H-pile including an H-beam having a predetermined length; hanging type brackets coupled at a predetermined position of the H-pile to face each other; and a tension material fixed vertically between the hanging type brackets. In addition, the method of the present invention comprises: a step (S1) of manufacturing an H-pile introduced with a prestress; a step (S2) of forming a perforated hole by perforating the ground at regular intervals to have a predetermined diameter by a predetermined depth; a step (S3) of driving the H-pile introduced with the prestress to be embedded in the perforated hole; a step (S4) of tensioning a tension material installed in the H-pile introduced with the prestress; and a step (S5) of installing an earth plate while a front surface part of the H-pile introduced with the prestress is excavated.
본 발명은 흙막이 엄지말뚝에 걸이형 브라켓을 설치하고, 상기 걸이형 브라켓에 인장재를 설치하여, 상기 인장재에 긴장력을 가하여 토압을 지지하는 프리스트레스 빔 자립공법을 도입함으로써, 버팀보 설치 개수를 대폭 줄임으로써 넓은 작업공간을 확보하여 장비작업의 효율성 증가로 인한 공사기간의 단축 및 강재의 사용량이 감소되어 공사비 절감 및 시공성 향상을 도모하도록 한 프리스트레스가 도입된 엄지말뚝과 이를 이용한 자립식 가설 흙막이 시공방법을 제공하는데 그 목적이 있다. 상기한 목적을 달성하기 위한 프리스트레스가 도입된 엄지말뚝은 일정한 길이를 갖는 H빔으로 이루어진 엄지말뚝과; 상기 엄지말뚝의 소정의 위치에 상호 대향되게 결합되는 걸이형 브라켓과; 상기 걸이형 브라켓 간에 수직으로 고정 설치되는 인장재로 구성됨을 특징으로 한다. 또한, 상기한 목적을 달성하기 위한 프리스트레스가 도입된 엄지말뚝을 이용한 자립식 가설 흙막이 시공방법은 프리스트레스가 도입된 엄지말뚝을 제작하는 단계(S 1); 지반에 일정한 간격을 두고, 소정의 직경 및 깊이로 천공하여 천공홀을 형성하는 단계(S 2); 상기 천공홀에 프리스트레스가 도입된 엄지말뚝을 항타 근입하는 단계(S 3); 상기 프리스트레스가 도입된 엄지말뚝에 설치된 인장재를 인장하는 단계(S 4); 상기 프리스트레스가 도입된 엄지말뚝의 전면부를 굴착 진행함과 동시에 토류판을 설치하는 단계(S 5)로 이루어짐을 특징으로 한다.
Thrust pile with prestress and self-supporting type pile construction using it
The present invention is to provide an H-pile introduced with a prestress, which introduces a prestress beam self-supporting constructing method for installing a hanging type bracket on a retaining wall H-pile, installing a tension material to the hanging type bracket, and applying a tensible force to the tension material to support an earth pressure such that the number of installation of struts is remarkably reduced to secure a wide working space so as to reduce a construction period due to an increase in equipment work efficiency and reduce construction costs and improve constructability due to reduction in the usage of a steel material; and to a method for constructing a self-supporting type temporary retaining wall using the same. To this end, the H-pile introduced with a prestress comprises: an H-pile including an H-beam having a predetermined length; hanging type brackets coupled at a predetermined position of the H-pile to face each other; and a tension material fixed vertically between the hanging type brackets. In addition, the method of the present invention comprises: a step (S1) of manufacturing an H-pile introduced with a prestress; a step (S2) of forming a perforated hole by perforating the ground at regular intervals to have a predetermined diameter by a predetermined depth; a step (S3) of driving the H-pile introduced with the prestress to be embedded in the perforated hole; a step (S4) of tensioning a tension material installed in the H-pile introduced with the prestress; and a step (S5) of installing an earth plate while a front surface part of the H-pile introduced with the prestress is excavated.
본 발명은 흙막이 엄지말뚝에 걸이형 브라켓을 설치하고, 상기 걸이형 브라켓에 인장재를 설치하여, 상기 인장재에 긴장력을 가하여 토압을 지지하는 프리스트레스 빔 자립공법을 도입함으로써, 버팀보 설치 개수를 대폭 줄임으로써 넓은 작업공간을 확보하여 장비작업의 효율성 증가로 인한 공사기간의 단축 및 강재의 사용량이 감소되어 공사비 절감 및 시공성 향상을 도모하도록 한 프리스트레스가 도입된 엄지말뚝과 이를 이용한 자립식 가설 흙막이 시공방법을 제공하는데 그 목적이 있다. 상기한 목적을 달성하기 위한 프리스트레스가 도입된 엄지말뚝은 일정한 길이를 갖는 H빔으로 이루어진 엄지말뚝과; 상기 엄지말뚝의 소정의 위치에 상호 대향되게 결합되는 걸이형 브라켓과; 상기 걸이형 브라켓 간에 수직으로 고정 설치되는 인장재로 구성됨을 특징으로 한다. 또한, 상기한 목적을 달성하기 위한 프리스트레스가 도입된 엄지말뚝을 이용한 자립식 가설 흙막이 시공방법은 프리스트레스가 도입된 엄지말뚝을 제작하는 단계(S 1); 지반에 일정한 간격을 두고, 소정의 직경 및 깊이로 천공하여 천공홀을 형성하는 단계(S 2); 상기 천공홀에 프리스트레스가 도입된 엄지말뚝을 항타 근입하는 단계(S 3); 상기 프리스트레스가 도입된 엄지말뚝에 설치된 인장재를 인장하는 단계(S 4); 상기 프리스트레스가 도입된 엄지말뚝의 전면부를 굴착 진행함과 동시에 토류판을 설치하는 단계(S 5)로 이루어짐을 특징으로 한다.
Thrust pile with prestress and self-supporting type pile construction using it
프리스트레스가 도입된 엄지말뚝과 이를 이용한 자립식 가설 흙막이 시공방법
KIM GYE SIK (Autor:in) / OH YONG HWAN (Autor:in)
06.10.2020
Patent
Elektronische Ressource
Koreanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Thrust pile with prestress and self-supporting type pile construction using it
Europäisches Patentamt | 2019
|Thrust pile with prestress and self-supporting type pile construction using it
Europäisches Patentamt | 2022
Thrust pile with prestress and self-supporting type pile construction using it
Europäisches Patentamt | 2022
Thrust pile with prestress and self-supporting type pile construction using it
Europäisches Patentamt | 2021
|Thrust pile with prestress and self-supporting type pile construction using it
Europäisches Patentamt | 2022
|