Elevating workbench for cable installation of cable-stayed bridge main tower and cable construction method for cable-stayed bridge main towerusing the same
The present invention relates to an ascending scaffold apparatus for installing a cable of a main tower unit of a cable-stayed bridge and a cable construction method of a main tower unit of a cable-stayed bridge using the same, which can carry out temporary installation and tension work of a cable on a main tower through an ascending work base to be lifted by using an anchor structure for a system form pre-constructed for main tower construction without using a tower crane and a fixed temporary scaffold at a construction site of a cable-stayed bridge. More specifically, the work base providing a space for constructing a cable on a main tower of a cable-stayed bridge constructed by a system form comprises: an anchor fixture detachably coupled to an anchor structure selected among anchor structures pre-constructed at regular intervals in a longitudinal direction in a construction process of the main tower; a main body provided with at least two individual spaces in multiple levels and a work footplate coupled to both sides, and coupled to the anchor fixture to be temporarily fixed; and a lifting driving unit installed on the main body and fastened to the anchor fixture positioned in a lifting target section of the main body to lift the main body.
본 발명은 사장교의 시공 현장에서 타워크레인 및 고정식 가설비계를 사용하지 않고서도 주탑 시공을 위해 기시공된 시스템폼용 앵커구조물을 활용하여 주탑에 승강 가능한 승강식 작업대를 통해 케이블의 가설과 인장 작업이 실시될 수 있도록 하는 사장교 주탑부 케이블 설치를 위한 승강 비계장치 및 이를 이용한 사장교 주탑부의 케이블 시공방법에 관한 것으로, 보다 상세하게는 시스템폼에 의해 시공되는 사장교의 주탑에 케이블을 시공하기 위한 공간을 제공하는 작업대에 있어서, 상기 주탑의 시공과정에서 길이방향을 따라 일정 간격으로 기시공되는 앵커구조물 중 선택된 앵커구조물에 착탈 가능하도록 결합되는 앵커고정구; 다단식으로 적어도 둘 이상의 개별 공간이 마련되고 양측면으로 작업발판이 결합되며 상기 앵커고정구에 결합되어 임시 고정되는 본체; 및 상기 본체에 설치되며 상기 본체의 승강 대상 구간에 위치하는 앵커고정구에 체결되어 본체를 승강시키는 승강구동부;를 포함하는 것이 특징이다.
Elevating workbench for cable installation of cable-stayed bridge main tower and cable construction method for cable-stayed bridge main towerusing the same
The present invention relates to an ascending scaffold apparatus for installing a cable of a main tower unit of a cable-stayed bridge and a cable construction method of a main tower unit of a cable-stayed bridge using the same, which can carry out temporary installation and tension work of a cable on a main tower through an ascending work base to be lifted by using an anchor structure for a system form pre-constructed for main tower construction without using a tower crane and a fixed temporary scaffold at a construction site of a cable-stayed bridge. More specifically, the work base providing a space for constructing a cable on a main tower of a cable-stayed bridge constructed by a system form comprises: an anchor fixture detachably coupled to an anchor structure selected among anchor structures pre-constructed at regular intervals in a longitudinal direction in a construction process of the main tower; a main body provided with at least two individual spaces in multiple levels and a work footplate coupled to both sides, and coupled to the anchor fixture to be temporarily fixed; and a lifting driving unit installed on the main body and fastened to the anchor fixture positioned in a lifting target section of the main body to lift the main body.
본 발명은 사장교의 시공 현장에서 타워크레인 및 고정식 가설비계를 사용하지 않고서도 주탑 시공을 위해 기시공된 시스템폼용 앵커구조물을 활용하여 주탑에 승강 가능한 승강식 작업대를 통해 케이블의 가설과 인장 작업이 실시될 수 있도록 하는 사장교 주탑부 케이블 설치를 위한 승강 비계장치 및 이를 이용한 사장교 주탑부의 케이블 시공방법에 관한 것으로, 보다 상세하게는 시스템폼에 의해 시공되는 사장교의 주탑에 케이블을 시공하기 위한 공간을 제공하는 작업대에 있어서, 상기 주탑의 시공과정에서 길이방향을 따라 일정 간격으로 기시공되는 앵커구조물 중 선택된 앵커구조물에 착탈 가능하도록 결합되는 앵커고정구; 다단식으로 적어도 둘 이상의 개별 공간이 마련되고 양측면으로 작업발판이 결합되며 상기 앵커고정구에 결합되어 임시 고정되는 본체; 및 상기 본체에 설치되며 상기 본체의 승강 대상 구간에 위치하는 앵커고정구에 체결되어 본체를 승강시키는 승강구동부;를 포함하는 것이 특징이다.
Elevating workbench for cable installation of cable-stayed bridge main tower and cable construction method for cable-stayed bridge main towerusing the same
사장교 주탑부 케이블 설치를 위한 승강 작업대 및 이를 이용한 사장교 주탑부의 케이블 시공방법
HYUN GYU HWAN (Autor:in) / LEE EUN CHUL (Autor:in) / KWON O DEOK (Autor:in) / PARK HAE SEOK (Autor:in) / KIM JIN DUK (Autor:in) / LEE IK SEON (Autor:in)
24.02.2021
Patent
Elektronische Ressource
Koreanisch
IPC:
E01D
BRIDGES
,
Brücken
/
B66F
HOISTING, LIFTING, HAULING, OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
,
Hub-, Verhol- oder Schubvorrichtungen, soweit nicht anderweitig vorgesehen, z.B. Vorrichtungen mit unmittelbarer Krafteinwirkung auf die Last
Erecting method of cable-stayed bridge main beam and cable-stayed bridge main beam
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2024
|CABLE-STAYED BRIDGE AND CABLE-STAYED BRIDGE CONSTRUCTION METHOD
Europäisches Patentamt | 2020
|Construction method for main tower of cable-stayed bridge
Europäisches Patentamt | 2022
|