Seawall install method using waves offset block and sand loss prevention device
The present invention relates to a seawall installation method using a coastal wave dissipation block and a sand loss prevention device. More specifically, the seawall installation method comprises: a sea shielding step of shielding the sea in front of shore protection where a seawall is to be installed by using shielding; a seawater drainage step of draining seawater trapped by the shielding; a foundation riprap installation step of installing a foundation riprap on the seafloor where the seawater has been drained; a foundation concrete installation step of installing foundation concrete on the installed foundation riprap; a wave dissipation block installation step of installing a plurality of wave dissipation blocks on an upper side of the installed foundation concrete, wherein the plurality of wave dissipation blocks are stacked along an inclined surface of the foundation riprap; an upper base installation step of installing an upper base on an upper end of the foundation riprap to cover upper ends of the plurality of stacked wave dissipation blocks; a seawater filling step of refilling, with seawater, the space partitioned by the shielding; and a shielding removal step of removing the shielding from the sea. According to the present invention, the seawall installation method can easily stack and install the plurality of wave dissipation blocks to shorten working hours, thereby increasing work efficiency, and can offset the waves by stages by the waves colliding with the dissipation blocks by stages, thereby preventing the waves from crashing over and damaging the shore.
본 발명은 해안용 소파블럭과 모래유실 방지장치를 이용한 방파제 설치방법에 관한 것으로, 더욱 상세하게는 차폐물을 이용하여 방파제를 설치할 호안의 전측 바다를 차폐시키는 바다 차폐단계, 상기 차폐물에 의해 갇힌 바닷물을 배수시키는 바닷물 배수단계, 바닷물이 배수된 바다 바닥에 기초사석부를 설치하는 기초사석부 설치단계, 설치된 기초사석부에 기초콘크리트를 설치하는 기초콘크리트 설치단계, 설치된 기초콘크리트의 상측으로 쇼파블럭을 설치하되, 기초사석부의 경사면을 따라 복수 개 적층되는 소파블럭 설치단계, 적층된 복수의 소파블럭의 상단부를 덮도록 상기 기초사석부의 상단부에 상부베이스를 설치하는 상부베이스 설치단계, 상기 차폐물에 의해 구획된 공간에 바닷물을 다시 충진시키는 바닷물 충진단계, 및 상기 차폐물을 바다에서 제거하는 차폐물 제거단계,를 포함한다.상기와 같은 본 발명에 의하면, 복수의 소파블럭을 용이하게 적층시켜 설치할 수 있어 작업시간을 단축시켜 작업효율을 향상시킬 수 있으며, 복수의 소파블럭에 의해 파도와 단계별로 충돌하여 파랑을 단계별로 상쇄시킴에 따라, 파도가 넘어 해안이 파손되는 것을 방지할 수 있다.
Seawall install method using waves offset block and sand loss prevention device
The present invention relates to a seawall installation method using a coastal wave dissipation block and a sand loss prevention device. More specifically, the seawall installation method comprises: a sea shielding step of shielding the sea in front of shore protection where a seawall is to be installed by using shielding; a seawater drainage step of draining seawater trapped by the shielding; a foundation riprap installation step of installing a foundation riprap on the seafloor where the seawater has been drained; a foundation concrete installation step of installing foundation concrete on the installed foundation riprap; a wave dissipation block installation step of installing a plurality of wave dissipation blocks on an upper side of the installed foundation concrete, wherein the plurality of wave dissipation blocks are stacked along an inclined surface of the foundation riprap; an upper base installation step of installing an upper base on an upper end of the foundation riprap to cover upper ends of the plurality of stacked wave dissipation blocks; a seawater filling step of refilling, with seawater, the space partitioned by the shielding; and a shielding removal step of removing the shielding from the sea. According to the present invention, the seawall installation method can easily stack and install the plurality of wave dissipation blocks to shorten working hours, thereby increasing work efficiency, and can offset the waves by stages by the waves colliding with the dissipation blocks by stages, thereby preventing the waves from crashing over and damaging the shore.
본 발명은 해안용 소파블럭과 모래유실 방지장치를 이용한 방파제 설치방법에 관한 것으로, 더욱 상세하게는 차폐물을 이용하여 방파제를 설치할 호안의 전측 바다를 차폐시키는 바다 차폐단계, 상기 차폐물에 의해 갇힌 바닷물을 배수시키는 바닷물 배수단계, 바닷물이 배수된 바다 바닥에 기초사석부를 설치하는 기초사석부 설치단계, 설치된 기초사석부에 기초콘크리트를 설치하는 기초콘크리트 설치단계, 설치된 기초콘크리트의 상측으로 쇼파블럭을 설치하되, 기초사석부의 경사면을 따라 복수 개 적층되는 소파블럭 설치단계, 적층된 복수의 소파블럭의 상단부를 덮도록 상기 기초사석부의 상단부에 상부베이스를 설치하는 상부베이스 설치단계, 상기 차폐물에 의해 구획된 공간에 바닷물을 다시 충진시키는 바닷물 충진단계, 및 상기 차폐물을 바다에서 제거하는 차폐물 제거단계,를 포함한다.상기와 같은 본 발명에 의하면, 복수의 소파블럭을 용이하게 적층시켜 설치할 수 있어 작업시간을 단축시켜 작업효율을 향상시킬 수 있으며, 복수의 소파블럭에 의해 파도와 단계별로 충돌하여 파랑을 단계별로 상쇄시킴에 따라, 파도가 넘어 해안이 파손되는 것을 방지할 수 있다.
Seawall install method using waves offset block and sand loss prevention device
해안용 소파블럭과 모래유실 방지장치를 이용한 방파제 설치방법
SHIN HEE JEONG (Autor:in) / CHUN DONG EUN (Autor:in) / SON SENG WOO (Autor:in) / KIM SANG SEON (Autor:in)
25.02.2021
Patent
Elektronische Ressource
Koreanisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Seawall using waves offset block and sand loss prevention device
Europäisches Patentamt | 2021
|Breakwater system using waves offset block and sand loss prevention device
Europäisches Patentamt | 2021
|SEAWALL, WATER OR SEAWATER INTRUSION PREVENTION DEVICE, AND RAISING METHOD OF SEAWALL
Europäisches Patentamt | 2023
|