According to the present invention, a method for constructing a water sampling pipe well in rock comprises: a core excavation member preparation step of fixing a lower end of a foundation well, having the same inner diameter as an underground collecting well for construction and having an outer diameter smaller than that of a ring-shaped core excavation member having a diameter greater than that of the underground collecting well for construction and having a tapered portion tapering to the outside of the inner circumferential surface thereof, to the upper surface of the core excavation member; a surface layer excavation step of excavating a surface layer to a predetermined diameter to form the underground collection well; a core excavation member installation step of vertically installing the core excavation member in a portion excavated in the surface layer excavation step; a core excavation member lowering step of moving the core excavation member in a vertical underground direction by excavating the lower surface of the core excavation member in a state in which the core excavation member is installed; a core excavation member grouting step of blocking the inflow of water between the upper surface of an underground rock layer and the core excavation member by grouting the contact area between the upper surface of the underground rock layer and the core excavation member by using the core excavation member and forms while the core excavation member contacts the upper surface of the underground bedrock layer by repeating a well connection step of connecting a well to an upper portion of the foundation well in a state in which the foundation well is inserted into the excavated portion from the ground; a rock layer excavation step of excavating the underground rock layer in the interior partitioned by the core excavation member; and a water sampling well drilling step of radially forming a water sampling well for sampling bedrock water by using an excavator for a water sampling well. Therefore, the quality of bedrock water can be increased.
본 발명의 암반 채수관정 시공공법은 시공을 위한 지하집수정의 직경보다 큰 직경을 가지며 내주면의 외측으로 테이퍼진 테이퍼부를 가진 링형의 코어굴착부재의 상면에 시공을 위한 지하집수정의 내경과 동일하며 외경이 상기 코어굴착부재의 외경보다 작은 기초우물통의 하단부를 고정한 코어굴착부재 준비단계와, 지하집수정을 형성하기 위해 표층을 소정의 직경으로 굴삭하는 지표층굴착단계와, 상기 지표층굴착단계에 의해 굴착된 굴착부위에 상기 코어굴착부재를 수직으로 설치하는 코어굴착부재설치단계와, 상기 코어굴착부재가 설치된 상태에서 상기 코어굴착부재의 하면을 굴착하여 코어굴착부재를 지하 수직방향으로 이동시키는 코어굴착부재 하강단계와, 상기 기초우물통이 지면으로부터 굴착부의 내부로 삽입된 상태에서 상기 기초우물통의 상부에 우물통을 연결하는 우물통연결단계의 반복으로 상기 코어굴착부재가 지하암반층의 상면에 접촉된 상태에서 상기 코어굴착부재와 거푸집을 이용하여 지하암반층의 상면과 코어굴착부재의 접촉부위를 그라우팅하여 지하암반층의 상면과 코어굴착부재의 사이로 건수의 유입을 차단하는 코어굴착부재그라우팅단계와, 상기 코어굴착부재에 의해 구획된 내부를 지하 암반층을 굴착하는 암반층굴착단계와, 채수관정용 굴착기를 이용하여 암반수의 채수를 위한 채수관정을 방사상으로 형성하는 채수관정 천공단계를 포함한다.
Rock collection pipe well construction method
According to the present invention, a method for constructing a water sampling pipe well in rock comprises: a core excavation member preparation step of fixing a lower end of a foundation well, having the same inner diameter as an underground collecting well for construction and having an outer diameter smaller than that of a ring-shaped core excavation member having a diameter greater than that of the underground collecting well for construction and having a tapered portion tapering to the outside of the inner circumferential surface thereof, to the upper surface of the core excavation member; a surface layer excavation step of excavating a surface layer to a predetermined diameter to form the underground collection well; a core excavation member installation step of vertically installing the core excavation member in a portion excavated in the surface layer excavation step; a core excavation member lowering step of moving the core excavation member in a vertical underground direction by excavating the lower surface of the core excavation member in a state in which the core excavation member is installed; a core excavation member grouting step of blocking the inflow of water between the upper surface of an underground rock layer and the core excavation member by grouting the contact area between the upper surface of the underground rock layer and the core excavation member by using the core excavation member and forms while the core excavation member contacts the upper surface of the underground bedrock layer by repeating a well connection step of connecting a well to an upper portion of the foundation well in a state in which the foundation well is inserted into the excavated portion from the ground; a rock layer excavation step of excavating the underground rock layer in the interior partitioned by the core excavation member; and a water sampling well drilling step of radially forming a water sampling well for sampling bedrock water by using an excavator for a water sampling well. Therefore, the quality of bedrock water can be increased.
본 발명의 암반 채수관정 시공공법은 시공을 위한 지하집수정의 직경보다 큰 직경을 가지며 내주면의 외측으로 테이퍼진 테이퍼부를 가진 링형의 코어굴착부재의 상면에 시공을 위한 지하집수정의 내경과 동일하며 외경이 상기 코어굴착부재의 외경보다 작은 기초우물통의 하단부를 고정한 코어굴착부재 준비단계와, 지하집수정을 형성하기 위해 표층을 소정의 직경으로 굴삭하는 지표층굴착단계와, 상기 지표층굴착단계에 의해 굴착된 굴착부위에 상기 코어굴착부재를 수직으로 설치하는 코어굴착부재설치단계와, 상기 코어굴착부재가 설치된 상태에서 상기 코어굴착부재의 하면을 굴착하여 코어굴착부재를 지하 수직방향으로 이동시키는 코어굴착부재 하강단계와, 상기 기초우물통이 지면으로부터 굴착부의 내부로 삽입된 상태에서 상기 기초우물통의 상부에 우물통을 연결하는 우물통연결단계의 반복으로 상기 코어굴착부재가 지하암반층의 상면에 접촉된 상태에서 상기 코어굴착부재와 거푸집을 이용하여 지하암반층의 상면과 코어굴착부재의 접촉부위를 그라우팅하여 지하암반층의 상면과 코어굴착부재의 사이로 건수의 유입을 차단하는 코어굴착부재그라우팅단계와, 상기 코어굴착부재에 의해 구획된 내부를 지하 암반층을 굴착하는 암반층굴착단계와, 채수관정용 굴착기를 이용하여 암반수의 채수를 위한 채수관정을 방사상으로 형성하는 채수관정 천공단계를 포함한다.
Rock collection pipe well construction method
암반 채수관정 시공공법
IM JEONG KEUN (Autor:in)
26.08.2021
Patent
Elektronische Ressource
Koreanisch
Europäisches Patentamt | 2023
|Steel pipe pile rock-entering construction method in fluctuating bare rock environment
Europäisches Patentamt | 2024
|Bare rock riverbed steel pipe pile construction equipment and construction method
Europäisches Patentamt | 2022
|Pipe-jacking tunneling construction method for hard rock stratum
Europäisches Patentamt | 2023
|