Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Preflex beam for preventing buckling and its manufacturing method
The present invention relates to a preflex beam for preventing buckling and a method for manufacturing the same. The preflex beam for preventing buckling comprises: a girder (beam, 10) including flanges (11) respectively provided at upper and lower stages with a web (12) in the center, and multiple fastening holes (13) formed in the web (12) at constant intervals; and one pair of temporary vertical reinforcements (100) respectively assembled to both ends of the web (12) of the girder (beam, 10), being temporarily detachable, and capable of preventing buckling of the girder (beam) without increasing the number of additional steels when a preflection (P.F) load is applied. According to the present invention, it is possible to remove residual stress and secure safety through the step-by-step application of P.F load, and to move a support at points of a production table when P.F load is applied. Thus, lateral deformation of the girder (beam) is prevented, not causing buckling of the girder (beam). In addition, by using the temporary vertical reinforcements that can be temporarily detached, buckling of the girder (beam) can be prevented without an additional increase in the amount of steel during the application of P.F load. Accordingly, the quality and reliability of the preflex beam can be significantly improved.
본 발명은 좌굴 방지용 프리플렉스빔 및 그 제작방법에 관한 것이다. 본 발명은 이를 위해 복부판(12)을 중심으로 상하단에 각각 플랜지(11)가 구비되고, 복부판(12)에는 일정 간격으로 복수개의 체결공(13)이 형성된 거더(빔)(10); 및 거더(빔)(10)의 복부판(12) 양단에 각각 조립 설치되며, 임시로 탈부착이 가능하고, 프리플렉션(P.F:Preflextion) 재하(하중을 누름)시 추가적인 강재량 증가 없이 거더(빔)의 좌굴을 방지할 수 있도록 한 한 쌍의 임시수직보강부(100);가 포함된다. 상기와 같이 구성된 본 발명은 단계별 프리플렉션(P.F:Preflextion) 재하(하중을 누름)를 통한 잔류 응력 제거 및 안전성 확보와, P.F 재하시 제작대 지점부에서 받침이동이 가능하여 거더(빔)의 횡방향으로의 변형을 방지하여 거더(빔)의 좌굴이 발생하지 않도록 하고, 임시로 탈부착이 가능한 임시 수직 보강재를 사용하여 P.F 재하시 추가적인 강재량 증가 없이 거더(빔)의 좌굴을 방지할 수 있도록 하고, 이로 인해 프리플렉스빔의 품질과 신뢰성을 대폭 향상시킬 수 있도록 한 것이다.
Preflex beam for preventing buckling and its manufacturing method
The present invention relates to a preflex beam for preventing buckling and a method for manufacturing the same. The preflex beam for preventing buckling comprises: a girder (beam, 10) including flanges (11) respectively provided at upper and lower stages with a web (12) in the center, and multiple fastening holes (13) formed in the web (12) at constant intervals; and one pair of temporary vertical reinforcements (100) respectively assembled to both ends of the web (12) of the girder (beam, 10), being temporarily detachable, and capable of preventing buckling of the girder (beam) without increasing the number of additional steels when a preflection (P.F) load is applied. According to the present invention, it is possible to remove residual stress and secure safety through the step-by-step application of P.F load, and to move a support at points of a production table when P.F load is applied. Thus, lateral deformation of the girder (beam) is prevented, not causing buckling of the girder (beam). In addition, by using the temporary vertical reinforcements that can be temporarily detached, buckling of the girder (beam) can be prevented without an additional increase in the amount of steel during the application of P.F load. Accordingly, the quality and reliability of the preflex beam can be significantly improved.
본 발명은 좌굴 방지용 프리플렉스빔 및 그 제작방법에 관한 것이다. 본 발명은 이를 위해 복부판(12)을 중심으로 상하단에 각각 플랜지(11)가 구비되고, 복부판(12)에는 일정 간격으로 복수개의 체결공(13)이 형성된 거더(빔)(10); 및 거더(빔)(10)의 복부판(12) 양단에 각각 조립 설치되며, 임시로 탈부착이 가능하고, 프리플렉션(P.F:Preflextion) 재하(하중을 누름)시 추가적인 강재량 증가 없이 거더(빔)의 좌굴을 방지할 수 있도록 한 한 쌍의 임시수직보강부(100);가 포함된다. 상기와 같이 구성된 본 발명은 단계별 프리플렉션(P.F:Preflextion) 재하(하중을 누름)를 통한 잔류 응력 제거 및 안전성 확보와, P.F 재하시 제작대 지점부에서 받침이동이 가능하여 거더(빔)의 횡방향으로의 변형을 방지하여 거더(빔)의 좌굴이 발생하지 않도록 하고, 임시로 탈부착이 가능한 임시 수직 보강재를 사용하여 P.F 재하시 추가적인 강재량 증가 없이 거더(빔)의 좌굴을 방지할 수 있도록 하고, 이로 인해 프리플렉스빔의 품질과 신뢰성을 대폭 향상시킬 수 있도록 한 것이다.
Preflex beam for preventing buckling and its manufacturing method
좌굴 방지용 프리플렉스빔 및 그 제작방법
03.11.2021
Patent
Elektronische Ressource
Koreanisch
preflex steel girder manufacturing apparatus and preflex steel girder manufacturing method
Europäisches Patentamt | 2017
|Europäisches Patentamt | 2019
|Online Contents | 1998
|Behavior of preflex beam in manufacturing process
Springer Verlag | 2004
|