Cable Tie Construction Method For Platform Reinforcement
The present invention relates to a method for horizontal press-fitting boring and tie cable construction for reinforcing a platform, and more specifically, to a method for horizontal press-fitting boring and tie cable construction for reinforcing a platform, comprising: a preparation step of accurately grasping the positions of underground buried objects inside a platform and other designated facilities and preparing materials; a core drill boring step of determining and marking a reinforcement position of any one retaining wall constituting the platform and boring a hole using a core drill; a directive press-fitting boring step of installing a guide pipe to correspond to the boring position and boring a hole toward an opposite retaining wall with a drill head using a directive press-fitting boring device; a reached retaining wall core drill boring step of boring a reached retaining wall using a core drill when the drill head reaches the opposite retaining wall; a tie cable tensioning step of inserting and fixing a steel pipe to correspond to the penetrating boring length, arranging a tie cable inside, fixing the tie cable to one side using a nut, and tensioning the tie cable using a center hole jack on the other side; and a completion step of removing the center hole jack and fixing the tie cable using a nut for completion after tensioning is completed.
본 발명은 승강장 보강을 위한 수평 압입 천공 및 타이케이블 시공방법에 관한 것으로서 보다 상세하게는 승강장 내부의 지하매설물 기타 지정 시설의 위치를 정확하게 파악하고 자재를 준비하는 준비 단계; 승강장을 구성하는 어느 한쪽 옹벽의 보강위치를 결정하여 마킹하고 코어드릴을 사용하여 천공하는 코어드릴 천공 단계; 천공위치에 대응하여 가이드 파이프를 설치하고 지향성 압입 천공장치를 사용하여 드릴헤드로 반대편 옹벽을 향해 천공하는 지향성 압입 천공 단계; 드릴헤드가 반대편 옹벽 도달시 도달부 옹벽을 코어드릴을 사용하여 천공하는 도달부 옹벽 코어드릴 천공 단계; 관통 천공 길이에 맞춰 강관 삽입후 고정하고 내부에 타이케이블을 배치하되 한쪽에 너트로 고정하고 다른 한쪽에 센터홀잭으로 타이케이블을 인장하는 타이케이블 인장 단계; 및 인장 완료후 센터홀잭을 제거후 너트로 고정하여 완료하는 완료단계;로 구성되는 승강장 보강을 위한 수평 압입 천공 및 타이케이블 시공방법에 관한 것이다.
Cable Tie Construction Method For Platform Reinforcement
The present invention relates to a method for horizontal press-fitting boring and tie cable construction for reinforcing a platform, and more specifically, to a method for horizontal press-fitting boring and tie cable construction for reinforcing a platform, comprising: a preparation step of accurately grasping the positions of underground buried objects inside a platform and other designated facilities and preparing materials; a core drill boring step of determining and marking a reinforcement position of any one retaining wall constituting the platform and boring a hole using a core drill; a directive press-fitting boring step of installing a guide pipe to correspond to the boring position and boring a hole toward an opposite retaining wall with a drill head using a directive press-fitting boring device; a reached retaining wall core drill boring step of boring a reached retaining wall using a core drill when the drill head reaches the opposite retaining wall; a tie cable tensioning step of inserting and fixing a steel pipe to correspond to the penetrating boring length, arranging a tie cable inside, fixing the tie cable to one side using a nut, and tensioning the tie cable using a center hole jack on the other side; and a completion step of removing the center hole jack and fixing the tie cable using a nut for completion after tensioning is completed.
본 발명은 승강장 보강을 위한 수평 압입 천공 및 타이케이블 시공방법에 관한 것으로서 보다 상세하게는 승강장 내부의 지하매설물 기타 지정 시설의 위치를 정확하게 파악하고 자재를 준비하는 준비 단계; 승강장을 구성하는 어느 한쪽 옹벽의 보강위치를 결정하여 마킹하고 코어드릴을 사용하여 천공하는 코어드릴 천공 단계; 천공위치에 대응하여 가이드 파이프를 설치하고 지향성 압입 천공장치를 사용하여 드릴헤드로 반대편 옹벽을 향해 천공하는 지향성 압입 천공 단계; 드릴헤드가 반대편 옹벽 도달시 도달부 옹벽을 코어드릴을 사용하여 천공하는 도달부 옹벽 코어드릴 천공 단계; 관통 천공 길이에 맞춰 강관 삽입후 고정하고 내부에 타이케이블을 배치하되 한쪽에 너트로 고정하고 다른 한쪽에 센터홀잭으로 타이케이블을 인장하는 타이케이블 인장 단계; 및 인장 완료후 센터홀잭을 제거후 너트로 고정하여 완료하는 완료단계;로 구성되는 승강장 보강을 위한 수평 압입 천공 및 타이케이블 시공방법에 관한 것이다.
Cable Tie Construction Method For Platform Reinforcement
승강장 보강을 위한 수평 압입 천공 및 타이케이블 시공방법
GO JAE HYUNG (Autor:in)
14.12.2022
Patent
Elektronische Ressource
Koreanisch
IPC:
B61B
RAILWAY SYSTEMS
,
Eisenbahnanlagen
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
STRUCTURE REINFORCEMENT CABLE SYSTEM AND CONSTRUCTION METHOD THEREOF
Europäisches Patentamt | 2022
STRUCTURE REINFORCEMENT CABLE SYSTEM AND CONSTRUCTION METHOD THEREOF
Europäisches Patentamt | 2022
|Platform beam main reinforcement reinforcing construction method
Europäisches Patentamt | 2020
|