Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
STEEL TUBE FOR UNDERGROUND STRUCTURE AND CONSTRUCTION METHOD THEREOF
Disclosed are a steel pipe press-fitting body for an underground structure with an improved connection performance and a construction method thereof. The present invention relates to the steel pipe press-fitting body for constructing the underground structure crossing a road lower part and so on, in a non-cutting method. According to the present invention, as bending rigidity of a steel pipe loop structure is sufficiently secured, a steel pipe can be press-fitted more quickly and stably. The steel pipe press-fitting body for the underground structure with the improved connection performance of the present invention comprises: a standard steel pipe press-fitting body (A); and an adjacent steel pipe press-fitting body (B).
도로 하부 등을 횡단하는 지중구조물을 비개착 방식으로 시공하기 위한 강관압입체에 대한 것으로서 강관루프구조체의 휨 강성을 충분히 확보하면서 보다 신속하게 안정적으로 강관을 압입 시공할 수 있는 연결성능이 개선된 지중구조물용 강관압입체 및 그 시공방법이 개시된다.
STEEL TUBE FOR UNDERGROUND STRUCTURE AND CONSTRUCTION METHOD THEREOF
Disclosed are a steel pipe press-fitting body for an underground structure with an improved connection performance and a construction method thereof. The present invention relates to the steel pipe press-fitting body for constructing the underground structure crossing a road lower part and so on, in a non-cutting method. According to the present invention, as bending rigidity of a steel pipe loop structure is sufficiently secured, a steel pipe can be press-fitted more quickly and stably. The steel pipe press-fitting body for the underground structure with the improved connection performance of the present invention comprises: a standard steel pipe press-fitting body (A); and an adjacent steel pipe press-fitting body (B).
도로 하부 등을 횡단하는 지중구조물을 비개착 방식으로 시공하기 위한 강관압입체에 대한 것으로서 강관루프구조체의 휨 강성을 충분히 확보하면서 보다 신속하게 안정적으로 강관을 압입 시공할 수 있는 연결성능이 개선된 지중구조물용 강관압입체 및 그 시공방법이 개시된다.
STEEL TUBE FOR UNDERGROUND STRUCTURE AND CONSTRUCTION METHOD THEREOF
연결성능이 개선된 지중구조물용 강관압입체 및 그 시공방법
KIM JIN SOO (Autor:in)
06.02.2023
Patent
Elektronische Ressource
Koreanisch
Hollow steel tube concrete energy underground diaphragm wall and construction process thereof
Europäisches Patentamt | 2024
|Fabricated underground passage steel structure system and construction method thereof
Europäisches Patentamt | 2022
|Steel box underground diaphragm wall structure and construction method thereof
Europäisches Patentamt | 2022
|Construction method used for underground tube construction method
Europäisches Patentamt | 2020
Europäisches Patentamt | 2021
|