Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Hump repair and reinforcement method of railway concrete sleepers
The present invention relates to a hump repair and reinforcement method for a railway concrete sleeper, which enables repair and reinforcement work to be carried out more quickly and easily when a hump of a railway concrete sleeper is damaged, thereby improving the maintenance efficiency of facilities. The hump repair and reinforcement method for a railway concrete sleeper comprises: a fastening device release step (ST 1) in which a fastening device (30) is separated to release a fastening force; a damaged part chipping step (ST 2) in which a damaged area of the hump (20) is removed using a cutting tool to form a cut part (21); a drilling step (ST 3) in which drilling holes (22) of a predetermined depth are formed in the cut part (21) in the vertical direction; an adhesive injection step (ST 4) in which adhesive (S1) is injected into the drilling holes (22); a spring anchor insertion step (ST 5) in which a spring anchor (50) is inserted into the drilling holes (22) into which the adhesive has been injected; a surface adhesive application step (ST 6) in which adhesive (S2) is applied to the surface of the cut part (21); a mold installation step (ST 7) in which a dedicated mold (60) is installed on the cut part (21) to restore the shape of the hump; a mortar injection step (ST 8) in which mortar (M) is injected into the mold (60); a mold removal step (ST 9) in which the mold (60) is removed after the curing of the injected mortar; a grinding step (ST 10) in which the surface of the cured hump (20) area is finished; and a fastening device installation step (ST 11) in which the fastening device (30) which was separated in the release step (ST 1) is reinstalled.
본 발명은 철도 콘크리트 침목의 험프 보수 보강공법에 관한 것으로서, 철도 콘크리트 침목의 험프 손상 발생 시 보수 보강작업이 보다 신속하고 용이하게 이루어질 수 있게 되어 시설물의 유지관리 효율을 향상시키는 효과를 나타낸다. 이를 실현하기 위한 본 발명은, 체결장치(30)를 분리시켜서 체결력을 해제하는 체결장치 해제단계와;(ST 1) 상기 험프(20)의 손상 발생 부위를 절삭공구를 이용하여 제거하여 절삭부(21)를 형성는 손상부 치핑단계와;(ST 2) 상기 절삭부(21)에 수직 방향으로 일정 깊이로 천공홀(22)을 형성시키는 천공단계와;(ST 3) 상기 천공홀(22)에 접착제(S1)를 주입하는 접착제 주입단계와;(ST 4) 상기 접착제(S1)가 주입된 천공홀(22)에 스프링 앵커(50)를 삽입하는 스프링 앵커 삽입단계와;(ST 5) 상기 절삭부(21) 표면에 접착제(S2)를 도포하는 표면 접착제 도포단계와;(ST 6) 상기 절삭부(21)에 험프의 형상 복원을 위한 전용 거푸집(60)을 설치하는 거푸집 설치단계와;(ST 7) 상기 거푸집(60) 내부에 모르타르(M)를 주입하는 모르타르 주입단계와;(ST 8) 상기 주입된 모르타르의 양생 후 거푸집(60)을 제거하는 거푸집 제거단계와;(ST 9) 상기 양생된 험프(20) 부위의 표면을 정리하는 그라인딩 단계와;(ST 10) 상기 해제단계(ST 1)에서 분리된 체결장치(30)를 다시 설치하는 체결장치 설치단계;(ST 11)를 포함하는 것을 특징으로 한다.
Hump repair and reinforcement method of railway concrete sleepers
The present invention relates to a hump repair and reinforcement method for a railway concrete sleeper, which enables repair and reinforcement work to be carried out more quickly and easily when a hump of a railway concrete sleeper is damaged, thereby improving the maintenance efficiency of facilities. The hump repair and reinforcement method for a railway concrete sleeper comprises: a fastening device release step (ST 1) in which a fastening device (30) is separated to release a fastening force; a damaged part chipping step (ST 2) in which a damaged area of the hump (20) is removed using a cutting tool to form a cut part (21); a drilling step (ST 3) in which drilling holes (22) of a predetermined depth are formed in the cut part (21) in the vertical direction; an adhesive injection step (ST 4) in which adhesive (S1) is injected into the drilling holes (22); a spring anchor insertion step (ST 5) in which a spring anchor (50) is inserted into the drilling holes (22) into which the adhesive has been injected; a surface adhesive application step (ST 6) in which adhesive (S2) is applied to the surface of the cut part (21); a mold installation step (ST 7) in which a dedicated mold (60) is installed on the cut part (21) to restore the shape of the hump; a mortar injection step (ST 8) in which mortar (M) is injected into the mold (60); a mold removal step (ST 9) in which the mold (60) is removed after the curing of the injected mortar; a grinding step (ST 10) in which the surface of the cured hump (20) area is finished; and a fastening device installation step (ST 11) in which the fastening device (30) which was separated in the release step (ST 1) is reinstalled.
본 발명은 철도 콘크리트 침목의 험프 보수 보강공법에 관한 것으로서, 철도 콘크리트 침목의 험프 손상 발생 시 보수 보강작업이 보다 신속하고 용이하게 이루어질 수 있게 되어 시설물의 유지관리 효율을 향상시키는 효과를 나타낸다. 이를 실현하기 위한 본 발명은, 체결장치(30)를 분리시켜서 체결력을 해제하는 체결장치 해제단계와;(ST 1) 상기 험프(20)의 손상 발생 부위를 절삭공구를 이용하여 제거하여 절삭부(21)를 형성는 손상부 치핑단계와;(ST 2) 상기 절삭부(21)에 수직 방향으로 일정 깊이로 천공홀(22)을 형성시키는 천공단계와;(ST 3) 상기 천공홀(22)에 접착제(S1)를 주입하는 접착제 주입단계와;(ST 4) 상기 접착제(S1)가 주입된 천공홀(22)에 스프링 앵커(50)를 삽입하는 스프링 앵커 삽입단계와;(ST 5) 상기 절삭부(21) 표면에 접착제(S2)를 도포하는 표면 접착제 도포단계와;(ST 6) 상기 절삭부(21)에 험프의 형상 복원을 위한 전용 거푸집(60)을 설치하는 거푸집 설치단계와;(ST 7) 상기 거푸집(60) 내부에 모르타르(M)를 주입하는 모르타르 주입단계와;(ST 8) 상기 주입된 모르타르의 양생 후 거푸집(60)을 제거하는 거푸집 제거단계와;(ST 9) 상기 양생된 험프(20) 부위의 표면을 정리하는 그라인딩 단계와;(ST 10) 상기 해제단계(ST 1)에서 분리된 체결장치(30)를 다시 설치하는 체결장치 설치단계;(ST 11)를 포함하는 것을 특징으로 한다.
Hump repair and reinforcement method of railway concrete sleepers
철도 콘크리트 침목의 험프 보수 보강공법
YOO MOON SIG (Autor:in) / LEE SOON GU (Autor:in)
10.02.2023
Patent
Elektronische Ressource
Koreanisch
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
/
C08K
Verwendung von anorganischen oder nichtmakromolekularen organischen Stoffen als Zusatzstoffe
,
USE OF INORGANIC OR NON-MACROMOLECULAR ORGANIC SUBSTANCES AS COMPOUNDING INGREDIENTS
/
C08L
COMPOSITIONS OF MACROMOLECULAR COMPOUNDS
,
Massen auf Basis makromolekularer Verbindungen
/
C09D
Überzugsmittel, z.B. Anstrichstoffe, Firnisse oder Lacke
,
COATING COMPOSITIONS, e.g. PAINTS, VARNISHES OR LACQUERS
Engineering Index Backfile | 1963
|SPRING FOR REINFORCEMENT OF RAILWAY CONCRETE SLEEPERS AND MANUFACTURE METHOD
Europäisches Patentamt | 2020
|Railway sleepers of reinforced concrete
Engineering Index Backfile | 1947
Concrete railway sleepers in India
Engineering Index Backfile | 1923
Engineering Index Backfile | 1963