Construction method for drainage trench and the drainage trench constructed by the same
The present invention relates to a drainage trench structure construction method and a drainage trench structure constructed thereby. The drainage trench structure construction method comprises: (S1) a step of repeatedly forming a first punching hole and a second punching hole (H, H') in a row to form a certain width (D) on a concrete slab (B); (S2) a step of pressing and fixing a first anchor nut and a second anchor nut (10, 10') into the first and second punching holes (H, H'); (S3) a step of fastening a first full threaded bolt and a second full threaded bolt (20, 20') in a certain lengths with the first and second anchor nuts (10)(10'); (S4) a step of fixing a bridge (30) on the first and second full threaded bolts (20, 20') facing each other to cross the first and second full threaded bolts (20, 20') at a first height (L1) from the concrete slab (B); (S5) a step of respectively fixing a first holding flat iron (40) and a second holding flat iron (40') on the first and second full threaded bolts (20, 20') at a second height (L2) from the concrete slab (B); (S6) a step of arranging an inner trench (50) opened upward on an upper side of the bridge (30); (S7) a step of holding a first side trench and a second side trench (60, 60') on the first and second holding flat irons (40, 40') to come in close contact with both side surfaces of the inner trench (50); and (S10) a step of pouring cement mortar (M) up to a height where the upper ends of the first and second side trenches (60, 60') are exposed while having the first and second full threaded bolts (20, 20') inside. Therefore, wastewater can be completely drained.
본 발명은 배수 트랜치 구조물 시공방법 및 그에 의하여 시공되는 배수 트랜치 구조물에 관한 것으로서, 이중 시공방법은, 콘크리트 슬래브(B)에 일정한 폭(D)을 이루는 제1,2천공홀(H)(H')을 일렬로 반복 형성하는 단계(S1)와; 제1,2천공홀(H)(H')에 제1,2앙카너트(10)(10')를 압입 고정하는 단계(S2)와; 제1,2앙카너트(10)(10')에 소정 길이의 제1,2전산볼트(20)(20')를 체결하는 단계(S3)와; 마주보는 제1,2전산볼트(20)(20')에 콘크리트 슬래브(B)로부터 제1높이(L1)로 제1,2전산볼트(20)(20')를 가로지르게 브릿지(30)를 고정하는 단계(S4)와; 콘크리트 슬래브(B)로부터 제2높이(L2)의 제1,2전산볼트(20)(20')에 제1거치평철(40)과 제2거치평철(40')을 각각 고정하는 단계(S5)와; 브릿지(30)의 상부에 상부측으로 개구된 인너트랜치(50)를 배치하는 단계(S6)와; 제1,2거치평철(40)(40')에 인너트랜치(50)의 양측면에 밀착되는 제1,2사이드트랜치(60)(60')을 거치하는 단계(S7)와; 제1,2전산볼트(20)(20')을 내장하면서 제1,2사이드트랜치(60)(60') 상단이 노출되는 높이까지 시멘트 몰탈(M)을 타설하는 단계(S10);를 포함하는 것을 특징으로 한다.
Construction method for drainage trench and the drainage trench constructed by the same
The present invention relates to a drainage trench structure construction method and a drainage trench structure constructed thereby. The drainage trench structure construction method comprises: (S1) a step of repeatedly forming a first punching hole and a second punching hole (H, H') in a row to form a certain width (D) on a concrete slab (B); (S2) a step of pressing and fixing a first anchor nut and a second anchor nut (10, 10') into the first and second punching holes (H, H'); (S3) a step of fastening a first full threaded bolt and a second full threaded bolt (20, 20') in a certain lengths with the first and second anchor nuts (10)(10'); (S4) a step of fixing a bridge (30) on the first and second full threaded bolts (20, 20') facing each other to cross the first and second full threaded bolts (20, 20') at a first height (L1) from the concrete slab (B); (S5) a step of respectively fixing a first holding flat iron (40) and a second holding flat iron (40') on the first and second full threaded bolts (20, 20') at a second height (L2) from the concrete slab (B); (S6) a step of arranging an inner trench (50) opened upward on an upper side of the bridge (30); (S7) a step of holding a first side trench and a second side trench (60, 60') on the first and second holding flat irons (40, 40') to come in close contact with both side surfaces of the inner trench (50); and (S10) a step of pouring cement mortar (M) up to a height where the upper ends of the first and second side trenches (60, 60') are exposed while having the first and second full threaded bolts (20, 20') inside. Therefore, wastewater can be completely drained.
본 발명은 배수 트랜치 구조물 시공방법 및 그에 의하여 시공되는 배수 트랜치 구조물에 관한 것으로서, 이중 시공방법은, 콘크리트 슬래브(B)에 일정한 폭(D)을 이루는 제1,2천공홀(H)(H')을 일렬로 반복 형성하는 단계(S1)와; 제1,2천공홀(H)(H')에 제1,2앙카너트(10)(10')를 압입 고정하는 단계(S2)와; 제1,2앙카너트(10)(10')에 소정 길이의 제1,2전산볼트(20)(20')를 체결하는 단계(S3)와; 마주보는 제1,2전산볼트(20)(20')에 콘크리트 슬래브(B)로부터 제1높이(L1)로 제1,2전산볼트(20)(20')를 가로지르게 브릿지(30)를 고정하는 단계(S4)와; 콘크리트 슬래브(B)로부터 제2높이(L2)의 제1,2전산볼트(20)(20')에 제1거치평철(40)과 제2거치평철(40')을 각각 고정하는 단계(S5)와; 브릿지(30)의 상부에 상부측으로 개구된 인너트랜치(50)를 배치하는 단계(S6)와; 제1,2거치평철(40)(40')에 인너트랜치(50)의 양측면에 밀착되는 제1,2사이드트랜치(60)(60')을 거치하는 단계(S7)와; 제1,2전산볼트(20)(20')을 내장하면서 제1,2사이드트랜치(60)(60') 상단이 노출되는 높이까지 시멘트 몰탈(M)을 타설하는 단계(S10);를 포함하는 것을 특징으로 한다.
Construction method for drainage trench and the drainage trench constructed by the same
배수 트렌치 구조물 시공방법 및 그에 의하여 시공되는 배수 트렌치 구조물