Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of undercurrent system
The purpose of the present invention is to provide a construction method of an undercurrent system that facilitates the removal of foreign substances from non-point pollutants, and can shorten a construction period by reducing the weight thereof and improving assemblability. For the purpose, the present invention comprises: a digging step of forming a digging floor by performing excavation with constant depth and width; a floor sheet forming step of installing a floor sheet on the digging floor formed through the digging step; a base floor forming step of forming a base floor having constant thickness on the floor sheet when the formation of the floor sheet is completed through the floor sheet forming step; a U-shaped hole forming step of forming a U-shaped hole block on the base floor when the formation of the base floor is completed through the base floor forming step; a water collection part forming step of forming a water collection part on one side of the base floor when the formation of the U-shaped hole block is completed through the U-shaped hole forming step; a drainage part forming step of forming a drainage part on the other side of the base floor when the formation of the water collection part is completed through the water collecting part forming step; an undercurrent forming step of forming an undercurrent part between the water collection part and the drainage part when the formation of the drainage part is completed through the drainage part forming step; an undercurrent part side surface finishing step of sealing the inner side of the undercurrent part by fixing a finishing panel to the outer edge of the undercurrent part when the formation of the undercurrent part is completed through the undercurrent part forming step; and a backfilling step of performing backfilling when the sealing of the undercurrent part is completed through the undercurrent part side surface finishing step.
본 발명은 비점오염원의 이물질 제거가 용이하고, 경량이면서 조립성을 향상시켜 공사기간을 단축할 수 있도록 하는 저류시스템의 시공방법을 제공하는 데 있다. 이를 위해, 본 발명은, 굴착시켜 일정깊이와 폭을 가지도록 하여 터파기 바닥을 형성하는 터파기 단계와; 상기 터파기 단계를 통해 형성된 터파기 바닥에 바닥시트를 포설하는 바닥시트 형성단계와; 상기 바닥시트 형성단계를 통해 바닥시트의 형성이 완료되면, 상기 바닥시트상에 일정두께를 가지는 기초바닥을 형성하는 기초바닥 형성단계와; 상기 기초바닥 형성단계를 통해 기초바닥의 형성이 완료되면, 상기 기초바닥에 U형구 블록을 형성하는 U형구 형성단계와; 상기 U형구 형성단계를 통해 U형구 블록의 형성이 완료되면, 기초바닥의 일측에 집수부를 형성하는 집수부 형성단계와; 상기 집수부 형성단계를 통해 집수부의 형성이 완료되면, 기초바닥의 타측에 배수부를 형성하는 배수부 형성단계와; 상기 배수부 형성단계를 통해 배수부의 형성이 완료되면, 집수부와 배수부 사이에 저류부를 형성하는 저류부 형성단계와; 상기 저류부 형성단계를 통해 저류부의 형성이 완료되면, 상기 저류부의 외곽 테두리에 마감패널을 고정시켜 상기 저류부의 내측을 밀폐시키도록 하는 저류부 측면 마감단계; 및 상기 저류부 측면 마감단계를 통해 저류부의 밀폐가 완료되면, 되메우기를 수행하는 되메우기 단계;로 이루어지는 것을 특징으로 한다.
Construction method of undercurrent system
The purpose of the present invention is to provide a construction method of an undercurrent system that facilitates the removal of foreign substances from non-point pollutants, and can shorten a construction period by reducing the weight thereof and improving assemblability. For the purpose, the present invention comprises: a digging step of forming a digging floor by performing excavation with constant depth and width; a floor sheet forming step of installing a floor sheet on the digging floor formed through the digging step; a base floor forming step of forming a base floor having constant thickness on the floor sheet when the formation of the floor sheet is completed through the floor sheet forming step; a U-shaped hole forming step of forming a U-shaped hole block on the base floor when the formation of the base floor is completed through the base floor forming step; a water collection part forming step of forming a water collection part on one side of the base floor when the formation of the U-shaped hole block is completed through the U-shaped hole forming step; a drainage part forming step of forming a drainage part on the other side of the base floor when the formation of the water collection part is completed through the water collecting part forming step; an undercurrent forming step of forming an undercurrent part between the water collection part and the drainage part when the formation of the drainage part is completed through the drainage part forming step; an undercurrent part side surface finishing step of sealing the inner side of the undercurrent part by fixing a finishing panel to the outer edge of the undercurrent part when the formation of the undercurrent part is completed through the undercurrent part forming step; and a backfilling step of performing backfilling when the sealing of the undercurrent part is completed through the undercurrent part side surface finishing step.
본 발명은 비점오염원의 이물질 제거가 용이하고, 경량이면서 조립성을 향상시켜 공사기간을 단축할 수 있도록 하는 저류시스템의 시공방법을 제공하는 데 있다. 이를 위해, 본 발명은, 굴착시켜 일정깊이와 폭을 가지도록 하여 터파기 바닥을 형성하는 터파기 단계와; 상기 터파기 단계를 통해 형성된 터파기 바닥에 바닥시트를 포설하는 바닥시트 형성단계와; 상기 바닥시트 형성단계를 통해 바닥시트의 형성이 완료되면, 상기 바닥시트상에 일정두께를 가지는 기초바닥을 형성하는 기초바닥 형성단계와; 상기 기초바닥 형성단계를 통해 기초바닥의 형성이 완료되면, 상기 기초바닥에 U형구 블록을 형성하는 U형구 형성단계와; 상기 U형구 형성단계를 통해 U형구 블록의 형성이 완료되면, 기초바닥의 일측에 집수부를 형성하는 집수부 형성단계와; 상기 집수부 형성단계를 통해 집수부의 형성이 완료되면, 기초바닥의 타측에 배수부를 형성하는 배수부 형성단계와; 상기 배수부 형성단계를 통해 배수부의 형성이 완료되면, 집수부와 배수부 사이에 저류부를 형성하는 저류부 형성단계와; 상기 저류부 형성단계를 통해 저류부의 형성이 완료되면, 상기 저류부의 외곽 테두리에 마감패널을 고정시켜 상기 저류부의 내측을 밀폐시키도록 하는 저류부 측면 마감단계; 및 상기 저류부 측면 마감단계를 통해 저류부의 밀폐가 완료되면, 되메우기를 수행하는 되메우기 단계;로 이루어지는 것을 특징으로 한다.
Construction method of undercurrent system
저류시스템의 시공방법
HWANG MOON KI (Autor:in) / LEE JUNG IN (Autor:in) / CHO KYU HONG (Autor:in) / PARK JOON HA (Autor:in) / KIM KI CHAN (Autor:in)
08.09.2023
Patent
Elektronische Ressource
Koreanisch
IPC:
E03F
SEWERS
,
Abwasserkanäle