Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
BRIDGE DISMANTLING METHOD
Disclosed is a bridge dismantling method. The bridge dismantling method can comprise: (a) a step of respectively installing a first lug and a second lug on both sides in a longitudinal direction of a girder to be dismantled corresponding to the n^th section between a first pier and a second pier neighboring the first pier in a longitudinal direction, and installing a first bent and a second bent corresponding to each of the first lug and the second lug on the girder to be dismantled at a location on the upper side of the first pier and a location on the upper side of the second pier; (b) a step of settling a first strand jack unit on the first bent while being connected to the first lug, and settling a second strand jack unit on the second bent while being connected to the second lug, and introducing a weight corresponding to the weight of the girder to be dismantled into the first strand jack unit and the second strand jack unit; (c) a step of cutting a part of the girder corresponding to a longitudinal outer side of the first lug and a longitudinal outer side of the second lug, and disassembling the girder to be dismantled; (d) a step of driving the first strand jack unit and the second strand jack unit, and lowering the girder to be dismantled to a preset height from the ground surface; and (e) a step of introducing a vehicle for transporting the girder into the space between the ground surface and the preset height, and settling the girder to be dismantled on the vehicle for transporting the girder, and moving the girder to be dismantled to the outside. Therefore, construction cost and construction period can be reduced.
교량 해체 공법이 개시되며, 상기 교량 해체 공법은, (a) 제1 교각 및 상기 제1 교각과 종 방향으로 이웃하는 제2 교각 사이의 n번째 구간에 대응하는 해체 대상 거더의 종 방향 양측 상에 제1 러그 및 제2 러그를 각각 설치하고, 제1 교각의 상측의 위치 및 상기 제2 교각의 상측의 위치의 상기 해체 대상 거더 상에 상기 제1 러그 및 상기 제2 러그 각각에 대응하여 제1 벤트 및 제2 벤트를 설치하는 단계; (b) 제1 스트랜드 잭 유닛을 상기 제1 러그와 연결된 상태로 상기 제1 벤트 상에 안착되도록 하고, 제2 스트랜드 잭 유닛을 상기 제2 러그와 연결된 상태로 상기 제2 벤트 상에 안착되도록 하고, 상기 해체 대상 거더의 중량에 대응하는 중량을 상기 제1 스트랜드 잭 유닛과 상기 제2 스트랜드 잭 유닛에 도입하는 단계; (c) 상기 제1 러그의 종 방향 외측 및 상기 제2 러그의 종 방향 외측에 대응하는 거더 부분을 절단하여 상기 해체 대상 거더를 분리하는 단계; (d) 상기 제1 스트랜드 잭 유닛과 상기 제2 스트랜드 잭 유닛을 구동하여 상기 해체 대상 거더를 지상으로부터 미리 설정된 높이에 도달할 때까지 하강시키는 단계; 및 (e) 지상과 상기 미리 설정된 높이 사이의 공간으로 거더 운반용 차량을 진입시키고 상기 해체 대상 거더를 상기 거더 운반용 차량 상에 안착시키고 외부로 이동시키는 단계를 포함할 수 있다.
BRIDGE DISMANTLING METHOD
Disclosed is a bridge dismantling method. The bridge dismantling method can comprise: (a) a step of respectively installing a first lug and a second lug on both sides in a longitudinal direction of a girder to be dismantled corresponding to the n^th section between a first pier and a second pier neighboring the first pier in a longitudinal direction, and installing a first bent and a second bent corresponding to each of the first lug and the second lug on the girder to be dismantled at a location on the upper side of the first pier and a location on the upper side of the second pier; (b) a step of settling a first strand jack unit on the first bent while being connected to the first lug, and settling a second strand jack unit on the second bent while being connected to the second lug, and introducing a weight corresponding to the weight of the girder to be dismantled into the first strand jack unit and the second strand jack unit; (c) a step of cutting a part of the girder corresponding to a longitudinal outer side of the first lug and a longitudinal outer side of the second lug, and disassembling the girder to be dismantled; (d) a step of driving the first strand jack unit and the second strand jack unit, and lowering the girder to be dismantled to a preset height from the ground surface; and (e) a step of introducing a vehicle for transporting the girder into the space between the ground surface and the preset height, and settling the girder to be dismantled on the vehicle for transporting the girder, and moving the girder to be dismantled to the outside. Therefore, construction cost and construction period can be reduced.
교량 해체 공법이 개시되며, 상기 교량 해체 공법은, (a) 제1 교각 및 상기 제1 교각과 종 방향으로 이웃하는 제2 교각 사이의 n번째 구간에 대응하는 해체 대상 거더의 종 방향 양측 상에 제1 러그 및 제2 러그를 각각 설치하고, 제1 교각의 상측의 위치 및 상기 제2 교각의 상측의 위치의 상기 해체 대상 거더 상에 상기 제1 러그 및 상기 제2 러그 각각에 대응하여 제1 벤트 및 제2 벤트를 설치하는 단계; (b) 제1 스트랜드 잭 유닛을 상기 제1 러그와 연결된 상태로 상기 제1 벤트 상에 안착되도록 하고, 제2 스트랜드 잭 유닛을 상기 제2 러그와 연결된 상태로 상기 제2 벤트 상에 안착되도록 하고, 상기 해체 대상 거더의 중량에 대응하는 중량을 상기 제1 스트랜드 잭 유닛과 상기 제2 스트랜드 잭 유닛에 도입하는 단계; (c) 상기 제1 러그의 종 방향 외측 및 상기 제2 러그의 종 방향 외측에 대응하는 거더 부분을 절단하여 상기 해체 대상 거더를 분리하는 단계; (d) 상기 제1 스트랜드 잭 유닛과 상기 제2 스트랜드 잭 유닛을 구동하여 상기 해체 대상 거더를 지상으로부터 미리 설정된 높이에 도달할 때까지 하강시키는 단계; 및 (e) 지상과 상기 미리 설정된 높이 사이의 공간으로 거더 운반용 차량을 진입시키고 상기 해체 대상 거더를 상기 거더 운반용 차량 상에 안착시키고 외부로 이동시키는 단계를 포함할 수 있다.
BRIDGE DISMANTLING METHOD
교량 해체 공법
CHO SEONG CHAN (Autor:in) / KO SUNG HO (Autor:in)
14.09.2023
Patent
Elektronische Ressource
Koreanisch
Integrated prefabricated bridge dismantling machine and prefabricated bridge dismantling method
Europäisches Patentamt | 2021
|Cofferdam-based tied-arch bridge dismantling structure and bridge dismantling method
Europäisches Patentamt | 2021
|