Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
STEEL PIPE REINFORCING GROUTING METHOD IN TUNNEL
The present invention relates to a grouting method for reinforcing a steel pipe in a tunnel, wherein the end of a steel pipe is fixed at a position spaced apart by a certain distance from a tunnel face, thereby preventing the steel pipe from interfering with the installation of supporting materials during the excavation of the tunnel face, and preventing an air pocket phenomenon during the injection of a grouting material. The grouting method of a steel pipe in a tunnel using a pre-drilling method comprises the steps of: (a) (S10) forming a plurality of drilling holes (20) in an inclined direction upward from the tunnel face (B) of a tunnel using drilling equipment; (b) (S20) after step S10, inserting a grouting steel pipe (30), which has a plurality of spray holes formed on an outer circumference surface, into the drilling holes (20); and (c) (S30) after step S20, grouting an area around the drilling holes (20) by spraying a grouting material through a hose (40) inserted into the grouting steel pipe (30) using a high-pressure pump. In step S10, the drilling holes (20) are formed at angles of 10-15 degrees from the horizon to prevent interference with supporting materials (10). In step S20, the grouting steel pipe (30) has a left end located at a position forward by one to one and a half times the gap (S) between the supporting materials (10). The grouting steel pipe (30) does not exist in a drilling hole section (ℓ) to be removed by the excavation of the tunnel face (B) afterward.
본 발명은 강관의 단부가 막장면으로부터 일정 거리 이격된 위치에 고정되도록 함으로써, 막장면의 굴착시 강관이 지보재 설치에 지장을 주지 않도록 하고, 그라우트재 주입시 에어 포켓 현상이 발생하는 것을 방지할 수 있는 터널 내 강관 보강 그라우팅 공법에 관한 것으로서, (a) 천공장비를 사용하여 터널의 막장면(B)으로부터 상부를 향해 경사진 방향으로 다수의 천공홀(20)을 형성하는 단계(S10), (b) 상기 S10 단계 이후, 외주면에 복수의 분사구(30a)가 형성된 그라우팅 강관(30)을 상기 천공홀(20)의 내부에 삽입하는 단계(S20), (c) 상기 S20 단계 이후, 고압펌프를 이용하여 상기 그라우팅 강관(30)의 내부에 삽입된 호스(40)를 통해 그라우트재를 분사하여 천공홀(20)의 주변영역을 그라우팅하는 단계(S30)를 포함하는 선천공 방식의 터널 갱내 강관 그라우팅 공법에 있어서, 상기 S10 단계에서, 상기 천공홀(20)은, 지보재(10)와의 간섭을 피해 수평선으로부터 10 ~ 15도 각도로 형성하고, 상기 S20 단계에서, 상기 그라우팅 강관(30)은, 좌측 단부가 지보재(10)간 간격(S)의 1 ~ 1.5배의 전진방향에 위치되도록 하고, 추후 막장면(B)의 굴착에 의해 제거될 천공홀 구간(ℓ)에는 상기 그라우팅 강관(30)이 존재하지 않도록 하는 것을 특징으로 한다.
STEEL PIPE REINFORCING GROUTING METHOD IN TUNNEL
The present invention relates to a grouting method for reinforcing a steel pipe in a tunnel, wherein the end of a steel pipe is fixed at a position spaced apart by a certain distance from a tunnel face, thereby preventing the steel pipe from interfering with the installation of supporting materials during the excavation of the tunnel face, and preventing an air pocket phenomenon during the injection of a grouting material. The grouting method of a steel pipe in a tunnel using a pre-drilling method comprises the steps of: (a) (S10) forming a plurality of drilling holes (20) in an inclined direction upward from the tunnel face (B) of a tunnel using drilling equipment; (b) (S20) after step S10, inserting a grouting steel pipe (30), which has a plurality of spray holes formed on an outer circumference surface, into the drilling holes (20); and (c) (S30) after step S20, grouting an area around the drilling holes (20) by spraying a grouting material through a hose (40) inserted into the grouting steel pipe (30) using a high-pressure pump. In step S10, the drilling holes (20) are formed at angles of 10-15 degrees from the horizon to prevent interference with supporting materials (10). In step S20, the grouting steel pipe (30) has a left end located at a position forward by one to one and a half times the gap (S) between the supporting materials (10). The grouting steel pipe (30) does not exist in a drilling hole section (ℓ) to be removed by the excavation of the tunnel face (B) afterward.
본 발명은 강관의 단부가 막장면으로부터 일정 거리 이격된 위치에 고정되도록 함으로써, 막장면의 굴착시 강관이 지보재 설치에 지장을 주지 않도록 하고, 그라우트재 주입시 에어 포켓 현상이 발생하는 것을 방지할 수 있는 터널 내 강관 보강 그라우팅 공법에 관한 것으로서, (a) 천공장비를 사용하여 터널의 막장면(B)으로부터 상부를 향해 경사진 방향으로 다수의 천공홀(20)을 형성하는 단계(S10), (b) 상기 S10 단계 이후, 외주면에 복수의 분사구(30a)가 형성된 그라우팅 강관(30)을 상기 천공홀(20)의 내부에 삽입하는 단계(S20), (c) 상기 S20 단계 이후, 고압펌프를 이용하여 상기 그라우팅 강관(30)의 내부에 삽입된 호스(40)를 통해 그라우트재를 분사하여 천공홀(20)의 주변영역을 그라우팅하는 단계(S30)를 포함하는 선천공 방식의 터널 갱내 강관 그라우팅 공법에 있어서, 상기 S10 단계에서, 상기 천공홀(20)은, 지보재(10)와의 간섭을 피해 수평선으로부터 10 ~ 15도 각도로 형성하고, 상기 S20 단계에서, 상기 그라우팅 강관(30)은, 좌측 단부가 지보재(10)간 간격(S)의 1 ~ 1.5배의 전진방향에 위치되도록 하고, 추후 막장면(B)의 굴착에 의해 제거될 천공홀 구간(ℓ)에는 상기 그라우팅 강관(30)이 존재하지 않도록 하는 것을 특징으로 한다.
STEEL PIPE REINFORCING GROUTING METHOD IN TUNNEL
터널 내 강관 보강 그라우팅 공법
CHO KYUNG OCK (Autor:in) / CHOI JUNG OK (Autor:in)
02.01.2024
Patent
Elektronische Ressource
Koreanisch
Steel pipe connection joint local grouting reinforcing structure and grouting method
Europäisches Patentamt | 2024
|STEEL PIPE REINFORCING GROUTING METHOD USING SIMULTANEOUS INJECTION STEEL PIPE AND GROUT
Europäisches Patentamt | 2023
|Direct injection grouting method for reinforcing buried steel pipe
Europäisches Patentamt | 2017
|MULTISTEP STEEL PIPE TUNNEL GROUTING REINFORCEMENT METHOD
Europäisches Patentamt | 2023
|GROUTING APPARATUS FOR REINFORCING TUNNEL AND THE GROUTING METHOD THEREOF
Europäisches Patentamt | 2019
|