Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CONSTRUCTING METHOD OF VERTICAL DRAINER AND HORIZONTAL DRAINER FOR IMPROVING SOFT GROUND AND NON-WOVEN OF HORIZONTAL DRAINER FOR USING THE SAME MOTHOD
The present invention relates to a method to install vertical and horizontal draining materials to improve a flimsy ground and a non-woven fabric of the horizontal draining material and, more specifically, relates to a method to install vertical and horizontal draining materials to improve the flimsy ground capable of increasing an efficiency of drainage and water collection without a loss of power-water by inserting the vertical draining material into the horizontal draining material. The method to install the vertical and horizontal draining materials to improve the flimsy ground comprises: an initial construction step of forming a landfill layer by pouring soil on the flimsy ground surface; a burying step of burying the vertical draining material covered by a non-woven fabric, and having both open lateral surfaces and a draining groove unit into the landfill layer to be perpendicular to the ground surface in order to partly expose the vertical draining material to the ground; a seating step of perpendicularly installing the horizontal draining material covered by the a non-woven fabric, and having both open lateral surfaces and a draining groove unit on the ground surface to be perpendicular to one lateral surface of the vertical draining material; a bending step of bending the vertical draining material to seat the horizontal draining material seated through the seating step on a top of the vertical draining material; a cutting step of cutting the vertical draining material bent in the bending step in accordance with a power-water drain area of the horizontal draining material, and forming an insertion hole by cutting one side of the top of the non-woven fabric of the horizontal draining material to embed the vertical draining material inside the non-woven fabric of the horizontal draining material; a connecting step of connecting the horizontal and vertical draining materials by embedding the vertical draining material into the insertion hole formed on the non-woven fabric of the horizontal draining material through the cutting step; and a finishing step of banking up a banking material on the top of the vertical and horizontal draining materials connected through the connecting step.
본 발명은 연약지반 개량을 위한 수직과 수평 배수재 시공방법 및 그 배수재의 부직포에 관한 것으로, 보다 상세하게는 수직배수재를 수평배수재에 삽입시켜 시공하므로 간극수가 유실되지 않고 배수 및 집수 효율을 증대시킬 수 있는 연약지반 개량을 위한 수직과 수평 배수재를 시공함에 있어 연약지반의 지표면에 토사를 부설하여 복토층을 형성하는 초기시공단계와 상기 초기시공단계의 복토층에는 외주가 부직포로 감싸져 있고 양측면이 개방되며 배수홈부가 형성된 수직 배수재를 지면과 직교시켜 일부분이 지상에 노출되도록 매설하는 매설단계와 상기 매설단계에 외주가 부직포로 감싸지며 양측면이 개방된 배수홈부가 형성된 수평 배수재를 지면의 상부에 상기 수직배수재의 일측면에 직교 설치하는 안착단계와 상기 안착단계에서 안착된 수평배수재의 상부면에 상기 수직배수재가 안착되도록 절곡시키는 절곡단계와 상기 절곡단계에서 절곡된 상기 수직 배수재를 수평배수재의 간극수 배수면적에 맞게 재단하고, 상기 수평 배수재의 부직포 상부 일측면에 상기 수직 배수재가 수평 배수재의 부직포 내측으로 내설될 수 있도록 절개하여 삽입공을 형성시키는 절개단계와 상기 절개단계에서 수평배수재의 부직포에 형성된 삽입공으로 상기 수직 배수재를 내설시켜 연결결합시키는 연결단계와 상기 연결단계에 연결된 수직과 수평 배수재 상부에 성토재를 성토시킨 마감시공단계로 이루어진다.
CONSTRUCTING METHOD OF VERTICAL DRAINER AND HORIZONTAL DRAINER FOR IMPROVING SOFT GROUND AND NON-WOVEN OF HORIZONTAL DRAINER FOR USING THE SAME MOTHOD
The present invention relates to a method to install vertical and horizontal draining materials to improve a flimsy ground and a non-woven fabric of the horizontal draining material and, more specifically, relates to a method to install vertical and horizontal draining materials to improve the flimsy ground capable of increasing an efficiency of drainage and water collection without a loss of power-water by inserting the vertical draining material into the horizontal draining material. The method to install the vertical and horizontal draining materials to improve the flimsy ground comprises: an initial construction step of forming a landfill layer by pouring soil on the flimsy ground surface; a burying step of burying the vertical draining material covered by a non-woven fabric, and having both open lateral surfaces and a draining groove unit into the landfill layer to be perpendicular to the ground surface in order to partly expose the vertical draining material to the ground; a seating step of perpendicularly installing the horizontal draining material covered by the a non-woven fabric, and having both open lateral surfaces and a draining groove unit on the ground surface to be perpendicular to one lateral surface of the vertical draining material; a bending step of bending the vertical draining material to seat the horizontal draining material seated through the seating step on a top of the vertical draining material; a cutting step of cutting the vertical draining material bent in the bending step in accordance with a power-water drain area of the horizontal draining material, and forming an insertion hole by cutting one side of the top of the non-woven fabric of the horizontal draining material to embed the vertical draining material inside the non-woven fabric of the horizontal draining material; a connecting step of connecting the horizontal and vertical draining materials by embedding the vertical draining material into the insertion hole formed on the non-woven fabric of the horizontal draining material through the cutting step; and a finishing step of banking up a banking material on the top of the vertical and horizontal draining materials connected through the connecting step.
본 발명은 연약지반 개량을 위한 수직과 수평 배수재 시공방법 및 그 배수재의 부직포에 관한 것으로, 보다 상세하게는 수직배수재를 수평배수재에 삽입시켜 시공하므로 간극수가 유실되지 않고 배수 및 집수 효율을 증대시킬 수 있는 연약지반 개량을 위한 수직과 수평 배수재를 시공함에 있어 연약지반의 지표면에 토사를 부설하여 복토층을 형성하는 초기시공단계와 상기 초기시공단계의 복토층에는 외주가 부직포로 감싸져 있고 양측면이 개방되며 배수홈부가 형성된 수직 배수재를 지면과 직교시켜 일부분이 지상에 노출되도록 매설하는 매설단계와 상기 매설단계에 외주가 부직포로 감싸지며 양측면이 개방된 배수홈부가 형성된 수평 배수재를 지면의 상부에 상기 수직배수재의 일측면에 직교 설치하는 안착단계와 상기 안착단계에서 안착된 수평배수재의 상부면에 상기 수직배수재가 안착되도록 절곡시키는 절곡단계와 상기 절곡단계에서 절곡된 상기 수직 배수재를 수평배수재의 간극수 배수면적에 맞게 재단하고, 상기 수평 배수재의 부직포 상부 일측면에 상기 수직 배수재가 수평 배수재의 부직포 내측으로 내설될 수 있도록 절개하여 삽입공을 형성시키는 절개단계와 상기 절개단계에서 수평배수재의 부직포에 형성된 삽입공으로 상기 수직 배수재를 내설시켜 연결결합시키는 연결단계와 상기 연결단계에 연결된 수직과 수평 배수재 상부에 성토재를 성토시킨 마감시공단계로 이루어진다.
CONSTRUCTING METHOD OF VERTICAL DRAINER AND HORIZONTAL DRAINER FOR IMPROVING SOFT GROUND AND NON-WOVEN OF HORIZONTAL DRAINER FOR USING THE SAME MOTHOD
연약지반 개량을 위한 수직과 수평 배수재 시공방법 및 그 수평배수재의 부직포
LEE IM RAK (Autor:in) / OH UK (Autor:in)
06.01.2016
Patent
Elektronische Ressource
Koreanisch
Constructing method of vertical drainer and horizontal drainer for improving soft ground
Europäisches Patentamt | 2019
Constructing method of vertical drainer and horizontal drainer for improving soft ground
Europäisches Patentamt | 2017
|HORIZONTAL DRAINER AND CONNECTION METHOD BETWEEN HORIZONTAL DRAINER AND VERTICAL DRAINER
Europäisches Patentamt | 2015
|