The present invention relates to an exposed rock bolt construction method and, more specifically, to an exposed rock bolt construction method which enables a supervisor to identify the number of rock bolts with the unaided eyes without time constraint by making the rock bolts identifiable with rock bolt caps. To this end, the exposed rock bolt construction method to construct a tunnel following the formation of a foundation tunnel comprises: (a) a first shotcrete placing step of placing first shotcrete on a surface of a rock of the foundation tunnel; (b) a drilling step of making rock holes, into which rock bolts are inserted, in the rock as many as a designed number with a drilling apparatus; (c) a rock bolt inserting step of inserting a rock bolt into each of the rock holes by making a front tip of the rock bolt enter the rock hole drilled in the rock and guiding the same to an end point of the rock hole, with a back end portion of the rock bolt left exposed; (d) a rock bolt fixing step of installing a bearing plate at the entrance of the rock hole with the rock bolt inserted and fixing the rock bolt by fastening a nut to the rock bolt; (e) a second shotcrete placing step of forming an application layer by placing second shotcrete, and making an end tip of the back end portion of the rock bolt exposed out of the application layer; and (f) a rock bolt cap fastening step of fastening a rock bolt cap to the tip end of the back end portion of the rock bolt.
본 발명은 노출식 락볼트 시공방법에 관한 것으로, 더욱 상세하게는 락볼트캡을 사용하여 락볼트를 용이하게 식별할 수 있도록 하여 감리시 시간적 제약 없이 육안으로 수량을 파악하고 확인할 수 있는 노출식 락볼트 시공방법에 관한 것이다. 상기한 기술적 과제를 해결하기 위해 본 발명은 기초터널 형성에 따른 터널을 구축하기 위한 노출식 락볼트 시공방법에 있어서, (a) 기초터널의 암반 표면에 제 1 숏크리트(shotcrete)를 타설하는 제 1 숏크리트 형성단계; (b) 천공장치를 이용하여 암반에 설계된 수만큼 락볼트가 삽입될 암반공을 천공하는 천공단계; (c) 천공된 암반공에 락볼트의 선단측을 진입시켜 암반공의 끝지점까지 안내하여 락볼트를 삽입하되 락볼트의 후단측이 돌출되게 하는 락볼트삽입단계; (d) 락볼트가 삽입된 상태에서 암반공의 초입에 지압플레이트를 설치하고 너트를 체결하여 고정하는 락볼트고정단계; (e) 제 2 숏크리트(shotcrete) 타설로 도포층을 형성하고 상기 도포층 상부로 락볼트 후단측의 종단부가 노출되게 하는 제 2 숏크리트 형성단계; 및 (f) 락볼트의 후단측 종단부에 락볼트캡을 체결하는 락볼트캡체결단계;를 포함하여 구비되는 것을 특징으로 하는 노출식 락볼트 시공방법을 제공한다.
The present invention relates to an exposed rock bolt construction method and, more specifically, to an exposed rock bolt construction method which enables a supervisor to identify the number of rock bolts with the unaided eyes without time constraint by making the rock bolts identifiable with rock bolt caps. To this end, the exposed rock bolt construction method to construct a tunnel following the formation of a foundation tunnel comprises: (a) a first shotcrete placing step of placing first shotcrete on a surface of a rock of the foundation tunnel; (b) a drilling step of making rock holes, into which rock bolts are inserted, in the rock as many as a designed number with a drilling apparatus; (c) a rock bolt inserting step of inserting a rock bolt into each of the rock holes by making a front tip of the rock bolt enter the rock hole drilled in the rock and guiding the same to an end point of the rock hole, with a back end portion of the rock bolt left exposed; (d) a rock bolt fixing step of installing a bearing plate at the entrance of the rock hole with the rock bolt inserted and fixing the rock bolt by fastening a nut to the rock bolt; (e) a second shotcrete placing step of forming an application layer by placing second shotcrete, and making an end tip of the back end portion of the rock bolt exposed out of the application layer; and (f) a rock bolt cap fastening step of fastening a rock bolt cap to the tip end of the back end portion of the rock bolt.
본 발명은 노출식 락볼트 시공방법에 관한 것으로, 더욱 상세하게는 락볼트캡을 사용하여 락볼트를 용이하게 식별할 수 있도록 하여 감리시 시간적 제약 없이 육안으로 수량을 파악하고 확인할 수 있는 노출식 락볼트 시공방법에 관한 것이다. 상기한 기술적 과제를 해결하기 위해 본 발명은 기초터널 형성에 따른 터널을 구축하기 위한 노출식 락볼트 시공방법에 있어서, (a) 기초터널의 암반 표면에 제 1 숏크리트(shotcrete)를 타설하는 제 1 숏크리트 형성단계; (b) 천공장치를 이용하여 암반에 설계된 수만큼 락볼트가 삽입될 암반공을 천공하는 천공단계; (c) 천공된 암반공에 락볼트의 선단측을 진입시켜 암반공의 끝지점까지 안내하여 락볼트를 삽입하되 락볼트의 후단측이 돌출되게 하는 락볼트삽입단계; (d) 락볼트가 삽입된 상태에서 암반공의 초입에 지압플레이트를 설치하고 너트를 체결하여 고정하는 락볼트고정단계; (e) 제 2 숏크리트(shotcrete) 타설로 도포층을 형성하고 상기 도포층 상부로 락볼트 후단측의 종단부가 노출되게 하는 제 2 숏크리트 형성단계; 및 (f) 락볼트의 후단측 종단부에 락볼트캡을 체결하는 락볼트캡체결단계;를 포함하여 구비되는 것을 특징으로 하는 노출식 락볼트 시공방법을 제공한다.
OPEN ROCK BOLT CONSTRUCTION METHOD
노출식 락볼트 시공방법