WATER PRELOADING METHOD USING STEEL SYSTEM WALL
The present invention relates to an embankment construction method for water preloading, using a steel system temporary wall. The embankment construction method for water preloading is to rapidly construct and demolish an embankment for stability the ground and storing water by preloading the water to correspond to a site condition and enable construction of the embankment with an excellent independence property and excellent site availability. According to the present invention, the embankment construction method for water preloading, using the steel system temporary wall includes: a first step of constructing a temporary wall in which the circumference unit is blocked from the outside, on the ground; a second step of forming a water loading unit capable of containing a fixed amount of the water by installing a cutoff mat inside the temporary wall constructed in the first step; a third step of preloading the water contained in the water loading unit on the ground by containing the water in the water loading unit constructed in the second step; and a fourth step of draining the water contained in the water loading unit after the preloading is completed in the third step. The first step is to install the temporary wall to stand by itself by being embedded in the ground by a embedded length of the lower part or by being anchored to the ground by a ground mounting unit of the lower part.
본 발명은 강재 시스템 가설벽을 이용한 물재하용 제방 축조 공법에 관한 것으로, 물에 의한 선행하중재하를 통해 지반을 안정화하고 물을 담기 위한 제방을 현장 여건에 맞도록 신속하게 시공 및 철거하며, 현장 활용성 및 자립성이 우수한 제방의 축조가 가능하도록 함을 목적으로 한다. 본 발명에 의한 강재 시스템 가설벽을 이용한 물재하용 제방 축조 공법은, 지반 위에 둘레부가 외부와 차단된 형태의 가설벽을 설치하는 제1단계와; 상기 제1단계를 통해 설치된 가설벽의 내부에 차수매트를 설치하여 일정량의 물을 담을 수 있는 물재하부를 형성하는 제2단계와; 상기 제2단계를 통해 시공된 물재하부 안에 물을 담아 상기 물재하부에 담긴 물의 하중에 의해 지반을 선행재하하는 제3단계와; 상기 제3단계를 통한 선행 재하가 완료된 후 상기 물재하부에 담긴 물을 배수하는 제4단계를 포함하며, 상기 제1단계는 저부의 지반 안착부를 통해 지반에 안착되거나 저부의 근입장을 통해 지중에 근입되어 자립하도록 가설벽을 설치하는 것이다.
WATER PRELOADING METHOD USING STEEL SYSTEM WALL
The present invention relates to an embankment construction method for water preloading, using a steel system temporary wall. The embankment construction method for water preloading is to rapidly construct and demolish an embankment for stability the ground and storing water by preloading the water to correspond to a site condition and enable construction of the embankment with an excellent independence property and excellent site availability. According to the present invention, the embankment construction method for water preloading, using the steel system temporary wall includes: a first step of constructing a temporary wall in which the circumference unit is blocked from the outside, on the ground; a second step of forming a water loading unit capable of containing a fixed amount of the water by installing a cutoff mat inside the temporary wall constructed in the first step; a third step of preloading the water contained in the water loading unit on the ground by containing the water in the water loading unit constructed in the second step; and a fourth step of draining the water contained in the water loading unit after the preloading is completed in the third step. The first step is to install the temporary wall to stand by itself by being embedded in the ground by a embedded length of the lower part or by being anchored to the ground by a ground mounting unit of the lower part.
본 발명은 강재 시스템 가설벽을 이용한 물재하용 제방 축조 공법에 관한 것으로, 물에 의한 선행하중재하를 통해 지반을 안정화하고 물을 담기 위한 제방을 현장 여건에 맞도록 신속하게 시공 및 철거하며, 현장 활용성 및 자립성이 우수한 제방의 축조가 가능하도록 함을 목적으로 한다. 본 발명에 의한 강재 시스템 가설벽을 이용한 물재하용 제방 축조 공법은, 지반 위에 둘레부가 외부와 차단된 형태의 가설벽을 설치하는 제1단계와; 상기 제1단계를 통해 설치된 가설벽의 내부에 차수매트를 설치하여 일정량의 물을 담을 수 있는 물재하부를 형성하는 제2단계와; 상기 제2단계를 통해 시공된 물재하부 안에 물을 담아 상기 물재하부에 담긴 물의 하중에 의해 지반을 선행재하하는 제3단계와; 상기 제3단계를 통한 선행 재하가 완료된 후 상기 물재하부에 담긴 물을 배수하는 제4단계를 포함하며, 상기 제1단계는 저부의 지반 안착부를 통해 지반에 안착되거나 저부의 근입장을 통해 지중에 근입되어 자립하도록 가설벽을 설치하는 것이다.
WATER PRELOADING METHOD USING STEEL SYSTEM WALL
강재 시스템 가설벽을 이용한 물재하용 제방 축조 공법
LEE SEONG HUN (Autor:in)
26.07.2016
Patent
Elektronische Ressource
Koreanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Vacuum preloading foundation treatment clay sealing wall construction method
Europäisches Patentamt | 2022
|Test device for preloading method and test method for preloading method using same