Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Yellow Soil Wall for controlling thickness and Construction Method thereof
The present invention relates to an easily constructible red clay wall and a constructing method thereof. The easily constructible red clay wall comprises: first pillars vertically installed lengthwise; a first net body of a net structure mounted on one side of the pillars and supported by the first pillars; a second net body of a net structure installed and separated from the first net body to face the first net body; second pillars vertically installed lengthwise and mounted on one side of the second net body to support the second net body; a connection means connecting the first net body and the second net body to each other; and a red clay layer formed by filling red clay paste in a gap between the first net body and the second net body. Construction is quick and convenient. Strength of the red clay wall is excellent. A harmful insect can be prevented. Red clay mortar formed as an inner wall finishing part of the red clay wall has an excellent binding capacity without containing cement. A crack is not created even if time elapses after plastering.
본 발명은 시공이 간편한 황토 벽체와 이의 시공방법에 관한 것으로, 상하로 길게 설치되는 제 1지주들과; 상기 지주들의 일측에 결합되어 상기 제 1지주들에 의해 지지되는 망 구조의 제 1망체와; 상기 제 1망체와 이격되어 마주하도록 설치되는 망 구조의 제 2망체와; 상하로 길게 설치되어 상기 제 2망체의 일측에 결합되어 상기 제 2망체를 지지하는 제 2지주들과; 상기 제 1망체와 상기 제 2망체를 상호 연결시키는 연결수단과; 및 상기 제 1망체와 상기 제 2망체 사이에 황토 반죽을 충진시켜 형성한 황토층;을 구비하는 것을 기술적 특징으로 하며, 시공이 매우 빠르고 간편하며, 황토 벽체의 강도가 우수하고, 해충을 방지할 수 있는 장점이 있으며, 황토 벽체의 내벽마감부로 형성되는 황토 모르타르는 시멘트를 포함하지 않으면서도 결합력이 우수하여 미장 후 시간이 경과하여도 크랙이 발생하지 않는 장점이 있다.
Yellow Soil Wall for controlling thickness and Construction Method thereof
The present invention relates to an easily constructible red clay wall and a constructing method thereof. The easily constructible red clay wall comprises: first pillars vertically installed lengthwise; a first net body of a net structure mounted on one side of the pillars and supported by the first pillars; a second net body of a net structure installed and separated from the first net body to face the first net body; second pillars vertically installed lengthwise and mounted on one side of the second net body to support the second net body; a connection means connecting the first net body and the second net body to each other; and a red clay layer formed by filling red clay paste in a gap between the first net body and the second net body. Construction is quick and convenient. Strength of the red clay wall is excellent. A harmful insect can be prevented. Red clay mortar formed as an inner wall finishing part of the red clay wall has an excellent binding capacity without containing cement. A crack is not created even if time elapses after plastering.
본 발명은 시공이 간편한 황토 벽체와 이의 시공방법에 관한 것으로, 상하로 길게 설치되는 제 1지주들과; 상기 지주들의 일측에 결합되어 상기 제 1지주들에 의해 지지되는 망 구조의 제 1망체와; 상기 제 1망체와 이격되어 마주하도록 설치되는 망 구조의 제 2망체와; 상하로 길게 설치되어 상기 제 2망체의 일측에 결합되어 상기 제 2망체를 지지하는 제 2지주들과; 상기 제 1망체와 상기 제 2망체를 상호 연결시키는 연결수단과; 및 상기 제 1망체와 상기 제 2망체 사이에 황토 반죽을 충진시켜 형성한 황토층;을 구비하는 것을 기술적 특징으로 하며, 시공이 매우 빠르고 간편하며, 황토 벽체의 강도가 우수하고, 해충을 방지할 수 있는 장점이 있으며, 황토 벽체의 내벽마감부로 형성되는 황토 모르타르는 시멘트를 포함하지 않으면서도 결합력이 우수하여 미장 후 시간이 경과하여도 크랙이 발생하지 않는 장점이 있다.
Yellow Soil Wall for controlling thickness and Construction Method thereof
시공이 간편한 황토 벽체와 이의 시공방법
GU BYEONG HWO (Autor:in)
26.10.2016
Patent
Elektronische Ressource
Koreanisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Yellow Soil Wall for controlling thickness and Construction Method thereof
Europäisches Patentamt | 2018
Construction method of equal-thickness cement-soil wall
Europäisches Patentamt | 2024
|Equal-thickness cement-soil wall supporting structure and construction method
Europäisches Patentamt | 2024
|