The present invention relates to a temporary bridge construction method which applies a girder member which is an upper structure of a temporary bridge and a guide frame to provide a workspace to install the girder member to improve structural performance of the temporary bridge and secure easiness, safety, quickness, and economic efficiency of construction. The temporary bridge construction method comprises: a material preparing process (S10) of preparing a temporary girder (10), a prestressing member (20), a support member (30), a connection member (40), and a support shaft (50); a block forming process (S20) of using the prepared materials to form a girder member (100) of a block shape and a guide frame (200); a guide installation process (S30) of installing the guide frame (200); a vent installation process (S40) of using a steel pipe pile (70) to form a temporary vent (300); and a girder installation process (S50) of installing the girder member (100) in the temporary vent (300).
본 발명은 가설교량의 상부구조물인 거더부재와 거더부재를 설치하기 위한 작업공간을 제공하는 가이드프레임을 적용하여, 가설교량의 구조적 성능을 향상시키면서 시공의 용이성, 안전성, 신속성 및 경제성을 확보할 수 있는 가설교량 시공방법에 관한 것이다. 본 발명의 특징은, 가설거더(10), 프리스트레싱부재(20), 지지부재(30), 연결부재(40), 지지축(50)을 준비하는 자재준비공정(S10)과, 준비된 자재들을 이용하여 블록형태의 거더부재(100) 및 가이드프레임(200)을 형성하는 블록형성공정(S20)과, 가이드프레임(200)을 설치하는 가이드설치공정(S30)과, 강관파일(70)을 이용하여 가설벤트(300)를 형성하는 벤트설치공정(S40)과, 가설벤트(300)에 거더부재(100)를 설치하는 거더설치공정(S50)을 포함한다.
The present invention relates to a temporary bridge construction method which applies a girder member which is an upper structure of a temporary bridge and a guide frame to provide a workspace to install the girder member to improve structural performance of the temporary bridge and secure easiness, safety, quickness, and economic efficiency of construction. The temporary bridge construction method comprises: a material preparing process (S10) of preparing a temporary girder (10), a prestressing member (20), a support member (30), a connection member (40), and a support shaft (50); a block forming process (S20) of using the prepared materials to form a girder member (100) of a block shape and a guide frame (200); a guide installation process (S30) of installing the guide frame (200); a vent installation process (S40) of using a steel pipe pile (70) to form a temporary vent (300); and a girder installation process (S50) of installing the girder member (100) in the temporary vent (300).
본 발명은 가설교량의 상부구조물인 거더부재와 거더부재를 설치하기 위한 작업공간을 제공하는 가이드프레임을 적용하여, 가설교량의 구조적 성능을 향상시키면서 시공의 용이성, 안전성, 신속성 및 경제성을 확보할 수 있는 가설교량 시공방법에 관한 것이다. 본 발명의 특징은, 가설거더(10), 프리스트레싱부재(20), 지지부재(30), 연결부재(40), 지지축(50)을 준비하는 자재준비공정(S10)과, 준비된 자재들을 이용하여 블록형태의 거더부재(100) 및 가이드프레임(200)을 형성하는 블록형성공정(S20)과, 가이드프레임(200)을 설치하는 가이드설치공정(S30)과, 강관파일(70)을 이용하여 가설벤트(300)를 형성하는 벤트설치공정(S40)과, 가설벤트(300)에 거더부재(100)를 설치하는 거더설치공정(S50)을 포함한다.
TEMPORARY BRIDGE CONSTRUCTION METHODE
가설교량 시공방법
CHO NAM SIK (Autor:in)
24.01.2017
Patent
Elektronische Ressource
Koreanisch
IPC:
E01D
BRIDGES
,
Brücken
TEMPORARY BRIDGE AND CONSTRUCTION METHOD OF TEMPORARY BRIDGE
Europäisches Patentamt | 2023
|TEMPORARY BRIDGE AND CONSTRUCTION METHOD FOR TEMPORARY BRIDGE
Europäisches Patentamt | 2020
|