.ROLLING METHOD OF GIRDER USING THE ROLLING APPARATUS
The present invention relates to a bridge construction method to install a girder (100) in a part of spans of a bridge with a plurality of spans. The method includes: a vent installation step of installing a construction vent (300) in a span area (A) in which the girder (100) is installed; a rolling device installation step of installing a rolling device (200), used to tow the girder (100), on the upper surface of a floor panel (1) installed on a side or both sides adjacent to the span area (A); a girder placement step of placing the girder (100) in the rolling device (200); a towing device installation step of installing a towing device (400), used to tow the girder (100), in the opposite side to the floor panel (1); a towing member installation step of connecting a towing member (410) with the towing device (400) and the girder (100); a primary girder placement step of placing the girder (100) in a placement device (500), installed in a span support part (2), by using the towing device (400); a construction vent removal step of removing the construction vent (300); and a secondary girder placement step of placing the girder (100) in a bridge seat device by operating the placement device (500) downwards. According to the present invention, the method to partially construct a partial section of a consecutive bridge by using the towing device and the rolling device without the use of a crane is capable of constructing the bridge without high-priced construction equipment. Moreover, the present invention is capable of minimizing a construction period by shortening time for construction and being used for every construction site by applying the rolling device and the towing device regardless of the length and size of a bridge.
본 발명은 다경간의 교량 중 일부 경간의 거더(100)를 설치하는 교량 시공방법으로서, 상기 거더(100)가 설치되는 경간(A) 영역에 가설벤트(300)를 설치하는 벤트설치단계; 상기 경간(A) 영역에 인접한 일측 또는 양측에 설치된 바닥판(1)의 상면에 상기 거더(100)의 견인을 위한 롤링장치(200)를 설치하는 롤링장치설치단계; 상기 롤링장치(200)에 상기 거더(100)를 거치하는 거더거치단계; 상기 바닥판(1)의 맞은편에 상기 거더(100)를 견인하기 위한 견인장치(400)를 설치하는 견인장치설치단계; 상기 견인장치(400)와 상기 거더(100)에 견인부재(410)를 연결하는 견인부재설치단계; 상기 견인장치(400)를 구동하여 상기 거더(100)를 상기 경간경간경간경간 받침부(2)에 설치된 거치장치(500)에 거치하는 거더거치1단계; 상기 가설벤트(300)를 제거하는 가설벤트제거단계; 및 상기 거치장치(500)를 하방향으로 구동하여 상기 거더(100)를 교좌장치에 거치하는 거더거치2단계;를 포함하는 것을 특징으로 하는 교량의 거더견인 시공방법을 제시한다. 본 발명에 따르면 크레인을 사용할 수 없는 연속교량의 일부 구간을 롤링장치 및 견인장치를 이용하여 일부 교량을 시공하는 방법으로서, 고가의 가설장치 없이 시공 할 수 있다. 또한, 시공시간이 짧기 때문에 공사기간을 최소화 할 수 있고, 롤링장치와 견인장치는 교량의 길이와 크기에 관계없이 적용 가능하기 때문에 어느 현장에서나 사용이 가능하다.
.ROLLING METHOD OF GIRDER USING THE ROLLING APPARATUS
The present invention relates to a bridge construction method to install a girder (100) in a part of spans of a bridge with a plurality of spans. The method includes: a vent installation step of installing a construction vent (300) in a span area (A) in which the girder (100) is installed; a rolling device installation step of installing a rolling device (200), used to tow the girder (100), on the upper surface of a floor panel (1) installed on a side or both sides adjacent to the span area (A); a girder placement step of placing the girder (100) in the rolling device (200); a towing device installation step of installing a towing device (400), used to tow the girder (100), in the opposite side to the floor panel (1); a towing member installation step of connecting a towing member (410) with the towing device (400) and the girder (100); a primary girder placement step of placing the girder (100) in a placement device (500), installed in a span support part (2), by using the towing device (400); a construction vent removal step of removing the construction vent (300); and a secondary girder placement step of placing the girder (100) in a bridge seat device by operating the placement device (500) downwards. According to the present invention, the method to partially construct a partial section of a consecutive bridge by using the towing device and the rolling device without the use of a crane is capable of constructing the bridge without high-priced construction equipment. Moreover, the present invention is capable of minimizing a construction period by shortening time for construction and being used for every construction site by applying the rolling device and the towing device regardless of the length and size of a bridge.
본 발명은 다경간의 교량 중 일부 경간의 거더(100)를 설치하는 교량 시공방법으로서, 상기 거더(100)가 설치되는 경간(A) 영역에 가설벤트(300)를 설치하는 벤트설치단계; 상기 경간(A) 영역에 인접한 일측 또는 양측에 설치된 바닥판(1)의 상면에 상기 거더(100)의 견인을 위한 롤링장치(200)를 설치하는 롤링장치설치단계; 상기 롤링장치(200)에 상기 거더(100)를 거치하는 거더거치단계; 상기 바닥판(1)의 맞은편에 상기 거더(100)를 견인하기 위한 견인장치(400)를 설치하는 견인장치설치단계; 상기 견인장치(400)와 상기 거더(100)에 견인부재(410)를 연결하는 견인부재설치단계; 상기 견인장치(400)를 구동하여 상기 거더(100)를 상기 경간경간경간경간 받침부(2)에 설치된 거치장치(500)에 거치하는 거더거치1단계; 상기 가설벤트(300)를 제거하는 가설벤트제거단계; 및 상기 거치장치(500)를 하방향으로 구동하여 상기 거더(100)를 교좌장치에 거치하는 거더거치2단계;를 포함하는 것을 특징으로 하는 교량의 거더견인 시공방법을 제시한다. 본 발명에 따르면 크레인을 사용할 수 없는 연속교량의 일부 구간을 롤링장치 및 견인장치를 이용하여 일부 교량을 시공하는 방법으로서, 고가의 가설장치 없이 시공 할 수 있다. 또한, 시공시간이 짧기 때문에 공사기간을 최소화 할 수 있고, 롤링장치와 견인장치는 교량의 길이와 크기에 관계없이 적용 가능하기 때문에 어느 현장에서나 사용이 가능하다.
.ROLLING METHOD OF GIRDER USING THE ROLLING APPARATUS
롤링장치를 이용한 거더견인 시공방법.
CHO HYUN (Autor:in) / WOO DONG IN (Autor:in) / SONG TAE EON (Autor:in) / BAE MIN HYUK (Autor:in) / JEON SEUNG MIN (Autor:in) / CHO WOO IL (Autor:in) / CHUN SANG UK (Autor:in)
07.04.2017
Patent