The present invention relates to a masonry wall construction method. An objective of the present invention is to move a portion of a wall structure produced in a standardized form at a factory to a site to be installed to shorten a construction period and reduce construction costs. To achieve objective, the masonry wall construction method comprises: a lower support unit installation step (ST 1) of moving a lower support unit (10) produced at a factory to a site to level the lower support unit (10) on a floor surface and then continuously install the lower support unit (10); a middle unit concrete pouring step (ST 2) of installing a form after arranging a reinforcing bar on an upper portion of the lower support unit (10), and pouring concrete mortar to form a middle connection unit (20); a pillar pouring step (ST 3) of pouring pillar unit (30) concrete on an upper portion of the middle connection unit (20) at regular intervals; a brick block installation step (ST 4) of using a crane to insert and install a brick block (40) between the pillar units (30); and a mortar filling step (ST 5) of filling mortar (50) in a portion of both ends of the brick block (40) inserted into the pillar units (30).
본 발명은 조적벽체 시공공법에 관한 것으로서, 공장에서 규격화된 형태로 생산된 일부 벽체 구조물을 현장으로 이동하여 설치가 이루어지도록 함으로 공사기간을 단축 시킴과 함께 이에 따른 시공비용을 절감시키기 위한 것이다. 이를 실현하기 위한 본 발명은, 공장에서 생산된 하부 받침부(10)를 현장으로 이동하여 바닥면에 수평을 맞춘 후 연속으로 설치하는 하부 받침부 설치단계와;(ST 1) 상기 하부 받침부(10)의 상부에 철근을 배근한 후 거푸집을 설치하고, 콘크리트 몰탈을 타설하여 중단 연결부(20)를 형성하는 중단부 콘크리트 타설단계와;(ST 2) 상기 중단 연결부(20)의 상부에 일정 간격으로 기둥부(30) 콘크리트를 타설하는 기둥 타설단계와;(ST 3) 상기 기둥부(30) 사이에 벽돌블럭(40)을 크레인을 이용하여 끼워서 설치하는 벽돌블럭 설치단계와;(ST 4) 상기 벽돌블럭(40) 양단부의 기둥부(30)와 끼워지는 부위에 몰탈(50)을 채워주는 몰탈 채움단계;(ST 5)를 포함하는 것을 특징으로 한다.
The present invention relates to a masonry wall construction method. An objective of the present invention is to move a portion of a wall structure produced in a standardized form at a factory to a site to be installed to shorten a construction period and reduce construction costs. To achieve objective, the masonry wall construction method comprises: a lower support unit installation step (ST 1) of moving a lower support unit (10) produced at a factory to a site to level the lower support unit (10) on a floor surface and then continuously install the lower support unit (10); a middle unit concrete pouring step (ST 2) of installing a form after arranging a reinforcing bar on an upper portion of the lower support unit (10), and pouring concrete mortar to form a middle connection unit (20); a pillar pouring step (ST 3) of pouring pillar unit (30) concrete on an upper portion of the middle connection unit (20) at regular intervals; a brick block installation step (ST 4) of using a crane to insert and install a brick block (40) between the pillar units (30); and a mortar filling step (ST 5) of filling mortar (50) in a portion of both ends of the brick block (40) inserted into the pillar units (30).
본 발명은 조적벽체 시공공법에 관한 것으로서, 공장에서 규격화된 형태로 생산된 일부 벽체 구조물을 현장으로 이동하여 설치가 이루어지도록 함으로 공사기간을 단축 시킴과 함께 이에 따른 시공비용을 절감시키기 위한 것이다. 이를 실현하기 위한 본 발명은, 공장에서 생산된 하부 받침부(10)를 현장으로 이동하여 바닥면에 수평을 맞춘 후 연속으로 설치하는 하부 받침부 설치단계와;(ST 1) 상기 하부 받침부(10)의 상부에 철근을 배근한 후 거푸집을 설치하고, 콘크리트 몰탈을 타설하여 중단 연결부(20)를 형성하는 중단부 콘크리트 타설단계와;(ST 2) 상기 중단 연결부(20)의 상부에 일정 간격으로 기둥부(30) 콘크리트를 타설하는 기둥 타설단계와;(ST 3) 상기 기둥부(30) 사이에 벽돌블럭(40)을 크레인을 이용하여 끼워서 설치하는 벽돌블럭 설치단계와;(ST 4) 상기 벽돌블럭(40) 양단부의 기둥부(30)와 끼워지는 부위에 몰탈(50)을 채워주는 몰탈 채움단계;(ST 5)를 포함하는 것을 특징으로 한다.
WALL BLOCK CONSTRUCTION METHOD
조적벽체 시공 공법
KIM BEOM TAI (Autor:in)
29.08.2017