Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
An embodiment of the present invention comprises: an inner material transferring process of transferring an inner material of a structure positioned in a demolition floor to the outside of the demolition floor; an outer material cutting and transferring process of cutting an outer material of the structure positioned in the demolition floor where the inner material is transferred into a plurality of cutting members to transfer the cut cutting member to the outside of the demolition floor; and a column reinforcement process of enabling remaining columns inside the demolition floor after the inner material and the outer material are transferred to be supported by each other by a reinforcement material. Therefore, the inner material transfer process, the outer material cutting and transferring process, and the column reinforcement process are one disassembling work cycle in order to be repeated for each floor to disassemble the structure.
본 발명의 실시 형태는 철거층에 있는 구조물의 내부재가 철거층의 외부로 반출되는 내부재 반출 과정; 상기 내부재가 반출된 철거층에 있는 구조물의 외부재가 복수개의 절단부재로 절단되어, 절단된 절단부재가 철거층의 외부로 반출되는 외부재 절단 및 반출 과정; 및 내부재와 외부재가 반출되고 남게 되는 철거층내의 기둥들이 보강재에 의해 서로 지지되는 기둥 보강 과정; 을 포함하며, 상기 내부재 반출 과정, 외부재 절단 및 반출 과정, 및 기둥 보강 과정이 하나의 해체 작업 싸이클로서 각 층마다 반복되어 구조물이 해체될 수 있다.
An embodiment of the present invention comprises: an inner material transferring process of transferring an inner material of a structure positioned in a demolition floor to the outside of the demolition floor; an outer material cutting and transferring process of cutting an outer material of the structure positioned in the demolition floor where the inner material is transferred into a plurality of cutting members to transfer the cut cutting member to the outside of the demolition floor; and a column reinforcement process of enabling remaining columns inside the demolition floor after the inner material and the outer material are transferred to be supported by each other by a reinforcement material. Therefore, the inner material transfer process, the outer material cutting and transferring process, and the column reinforcement process are one disassembling work cycle in order to be repeated for each floor to disassemble the structure.
본 발명의 실시 형태는 철거층에 있는 구조물의 내부재가 철거층의 외부로 반출되는 내부재 반출 과정; 상기 내부재가 반출된 철거층에 있는 구조물의 외부재가 복수개의 절단부재로 절단되어, 절단된 절단부재가 철거층의 외부로 반출되는 외부재 절단 및 반출 과정; 및 내부재와 외부재가 반출되고 남게 되는 철거층내의 기둥들이 보강재에 의해 서로 지지되는 기둥 보강 과정; 을 포함하며, 상기 내부재 반출 과정, 외부재 절단 및 반출 과정, 및 기둥 보강 과정이 하나의 해체 작업 싸이클로서 각 층마다 반복되어 구조물이 해체될 수 있다.
Method for breakup structure
구조물 해체 방법
KIM JEONG WOO (Autor:in)
03.01.2018
Patent
Elektronische Ressource
Koreanisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
NTIS | 1988
|British Library Conference Proceedings | 1993
|Soviet Breakup Reveals Infrastructure Woes
Online Contents | 1995
Elsevier | 1989
|