Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
STONE NET AND CONSTRUTION METHOD THEREOF
The present invention relates to a stone net which completes greening as soon as construction is conducted and a construction method for the same. The stone net of integrated composition includes: zinc plating wire mesh (110) having a grid structure; a native rock (120) installed on the upper surface of the zinc plating wire mesh (110) and having a borehole, wherein the native rock (120) is connected to the zinc plating wire mesh (110) by a coupling unit (140); and roll grass (130) installed of the lower surface of the zinc plating wire mesh (110) and connected to the zinc plating wire mesh (110) by a hogring (150), wherein a grass part faces the upper side and a root part faces the lower side. The construction method for a stone net completes the greening as soon as the construction is conducted by constructing the stone net for protecting a slope. According to the present invention, the stone net can complete the greening as soon as the construction is conducted by having the composition applied with the roll grass. So, the stone net can reduce construction time and be simply constructed in comparison with an existing stone net. So, a user does not need to wait progress of the greening for long time. Also, the stone net can prevent a loss of soil in heavy rain and can protect the slope.
본 발명은 시공 즉시 녹화가 완성되는 스톤네트 및 그 시공방법에 관한 것으로서, 격자 구조를 갖는 아연도금철망(110); 상기 아연도금철망(110)의 윗면에 배치되는 것으로서, 천공(121)이 형성되고, 체결수단(140)을 이용한 체결을 통해 상기 아연도금철망(110)에 결합되는 자연석(120); 상기 아연도금철망(110)의 아랫면에 배치하되, 잔디부분이 윗쪽 방향을 향하고 뿌리부분이 아래쪽 방향을 향하도록 배치하며, 호그링(150)을 이용한 체결을 통해 상기 아연도금철망(110)에 결합되는 롤잔디(130);를 포함하는 일체 구성의 스톤네트를 제공하며, 이러한 스톤네트를 이용하여 법면 보호용으로 시공함으로써 시공 즉시 녹화를 완성되게 하는 스톤네트 시공방법을 제공하는 것을 특징으로 한다. 본 발명에 따르면, 롤잔디를 접목한 구성을 통해 시공 즉시 녹화를 완성할 수 있는 스톤네트 및 그 시공방법을 제공할 수 있으며, 기존에 비해 보다 간단하게 시공 및 시공시간을 단축할 수 있고 오랜시간 녹화 진행을 기다리지 않아도 되며, 폭우시 토사의 유실을 방지하는 등 법면을 보호할 수 있다.
STONE NET AND CONSTRUTION METHOD THEREOF
The present invention relates to a stone net which completes greening as soon as construction is conducted and a construction method for the same. The stone net of integrated composition includes: zinc plating wire mesh (110) having a grid structure; a native rock (120) installed on the upper surface of the zinc plating wire mesh (110) and having a borehole, wherein the native rock (120) is connected to the zinc plating wire mesh (110) by a coupling unit (140); and roll grass (130) installed of the lower surface of the zinc plating wire mesh (110) and connected to the zinc plating wire mesh (110) by a hogring (150), wherein a grass part faces the upper side and a root part faces the lower side. The construction method for a stone net completes the greening as soon as the construction is conducted by constructing the stone net for protecting a slope. According to the present invention, the stone net can complete the greening as soon as the construction is conducted by having the composition applied with the roll grass. So, the stone net can reduce construction time and be simply constructed in comparison with an existing stone net. So, a user does not need to wait progress of the greening for long time. Also, the stone net can prevent a loss of soil in heavy rain and can protect the slope.
본 발명은 시공 즉시 녹화가 완성되는 스톤네트 및 그 시공방법에 관한 것으로서, 격자 구조를 갖는 아연도금철망(110); 상기 아연도금철망(110)의 윗면에 배치되는 것으로서, 천공(121)이 형성되고, 체결수단(140)을 이용한 체결을 통해 상기 아연도금철망(110)에 결합되는 자연석(120); 상기 아연도금철망(110)의 아랫면에 배치하되, 잔디부분이 윗쪽 방향을 향하고 뿌리부분이 아래쪽 방향을 향하도록 배치하며, 호그링(150)을 이용한 체결을 통해 상기 아연도금철망(110)에 결합되는 롤잔디(130);를 포함하는 일체 구성의 스톤네트를 제공하며, 이러한 스톤네트를 이용하여 법면 보호용으로 시공함으로써 시공 즉시 녹화를 완성되게 하는 스톤네트 시공방법을 제공하는 것을 특징으로 한다. 본 발명에 따르면, 롤잔디를 접목한 구성을 통해 시공 즉시 녹화를 완성할 수 있는 스톤네트 및 그 시공방법을 제공할 수 있으며, 기존에 비해 보다 간단하게 시공 및 시공시간을 단축할 수 있고 오랜시간 녹화 진행을 기다리지 않아도 되며, 폭우시 토사의 유실을 방지하는 등 법면을 보호할 수 있다.
STONE NET AND CONSTRUTION METHOD THEREOF
시공 즉시 녹화가 완성되는 스톤네트의 시공방법
LEE AE GYEONG (Autor:in)
04.01.2018
Patent
Elektronische Ressource
Koreanisch