Top topping construction method of underground tunnel structure
The present invention relates to a top topping construction method for an underground tunnel structure that can shorten the construction period and have a reinforced waterproof layer structure by reducing the weight of the top topping of the underground tunnel structure. The underground tunnel structure top topping construction method according to a preferred embodiment of the present invention is a construction method for performing top topping on a tunnel structure assembled by precast concrete or field installation at a predetermined depth from the ground surface, including a step of building a waterproof layer by waterproof coating treatment or waterproof sheet on the upper surface of the tunnel structure; a step of building a waterproof protective layer for sequentially forming a lower protective pressing mortar layer by placing a primary mortar layer so as to have a thickness of 20 to 50 mm on the upper surface of the waterproof layer, forming a lightweight foam concrete layer by placing lightweight foam concrete on the lower protective pressing mortar layer, and forming an upper protective pressing mortar layer by placing secondary mortar so as to have a thickness of 20 to 50 mm on the upper surface of the lightweight foam concrete layer; a step of building on the upper surface of the waterproof protective layer a drain layer including an upper water permeable layer including water permeable concrete or water permeable asphalt and a lower water blocking plate attached to the bottom surface of the water permeable layer; a step of building a lightweight soil layer mixed and treaded with soil and lightweight aggregate on the drain layer; and a step of building a road pavement layer paved with asphalt or cement on the top layer on the upper surface of the lightweight soil layer.
본 발명은 지하 터널 구조물의 상부 토핑을 경량으로 강화된 방수층구조를 가질 수 있고 공기의 단축이 가능한 개착식 지하 터널 구조물의 상부 토핑을 시공하는 방법을 제공한다. 본 발명의 적절한 실시 형태에 따른 지하 터널 구조물의 상부 토핑을 시공하는 방법은, 지면으로부터 일정 깊이에 현장 타설 또는 프리캐스트 콘크리트로 조립된 터널 구조물의 상부를 토핑하는 시공 방법에 있어서, 상기 터널 구조물의 상면에 방수도막 처리하거나 또는 방수시트로 방수층을 시공하는 단계와; 상기 방수층의 상면에 20~50mm의 두께를 갖도록 1차 몰탈을 타설하여 하부 보호누름몰탈층을 형성하고, 하부 보호누름몰탈층의 상부로 경량기포콘크리트를 타설하여 경량기포콘크리트층을 형성하고, 경량기포콘크리트층의 상면에 20~50mm의 두께를 갖도록 2차 몰탈을 타설하여 상부 보호누름몰탈층을 순차적으로 형성시키는 방수보호층을 시공하는 단계와; 투수콘크리트 또는 투수아스팔트로 이루어진 상부 투수층과, 상부 투수층의 바닥면에 부착되어 있는 하부 차수판으로 이루어진 배수층을 상기 방수보호층의 상면에 시공하는 단계와; 상기 배수층의 상부로 토사와 경량 골재로 혼합되어 다짐되어 있는 경량토사층을 시공하는 단계; 및 상기 경량토사층의 상면에 표층으로 아스팔트 또는 시멘트로 포장되는 도로포장층을 시공하는 단계로 이루어진 것을 특징으로 한다.
Top topping construction method of underground tunnel structure
The present invention relates to a top topping construction method for an underground tunnel structure that can shorten the construction period and have a reinforced waterproof layer structure by reducing the weight of the top topping of the underground tunnel structure. The underground tunnel structure top topping construction method according to a preferred embodiment of the present invention is a construction method for performing top topping on a tunnel structure assembled by precast concrete or field installation at a predetermined depth from the ground surface, including a step of building a waterproof layer by waterproof coating treatment or waterproof sheet on the upper surface of the tunnel structure; a step of building a waterproof protective layer for sequentially forming a lower protective pressing mortar layer by placing a primary mortar layer so as to have a thickness of 20 to 50 mm on the upper surface of the waterproof layer, forming a lightweight foam concrete layer by placing lightweight foam concrete on the lower protective pressing mortar layer, and forming an upper protective pressing mortar layer by placing secondary mortar so as to have a thickness of 20 to 50 mm on the upper surface of the lightweight foam concrete layer; a step of building on the upper surface of the waterproof protective layer a drain layer including an upper water permeable layer including water permeable concrete or water permeable asphalt and a lower water blocking plate attached to the bottom surface of the water permeable layer; a step of building a lightweight soil layer mixed and treaded with soil and lightweight aggregate on the drain layer; and a step of building a road pavement layer paved with asphalt or cement on the top layer on the upper surface of the lightweight soil layer.
본 발명은 지하 터널 구조물의 상부 토핑을 경량으로 강화된 방수층구조를 가질 수 있고 공기의 단축이 가능한 개착식 지하 터널 구조물의 상부 토핑을 시공하는 방법을 제공한다. 본 발명의 적절한 실시 형태에 따른 지하 터널 구조물의 상부 토핑을 시공하는 방법은, 지면으로부터 일정 깊이에 현장 타설 또는 프리캐스트 콘크리트로 조립된 터널 구조물의 상부를 토핑하는 시공 방법에 있어서, 상기 터널 구조물의 상면에 방수도막 처리하거나 또는 방수시트로 방수층을 시공하는 단계와; 상기 방수층의 상면에 20~50mm의 두께를 갖도록 1차 몰탈을 타설하여 하부 보호누름몰탈층을 형성하고, 하부 보호누름몰탈층의 상부로 경량기포콘크리트를 타설하여 경량기포콘크리트층을 형성하고, 경량기포콘크리트층의 상면에 20~50mm의 두께를 갖도록 2차 몰탈을 타설하여 상부 보호누름몰탈층을 순차적으로 형성시키는 방수보호층을 시공하는 단계와; 투수콘크리트 또는 투수아스팔트로 이루어진 상부 투수층과, 상부 투수층의 바닥면에 부착되어 있는 하부 차수판으로 이루어진 배수층을 상기 방수보호층의 상면에 시공하는 단계와; 상기 배수층의 상부로 토사와 경량 골재로 혼합되어 다짐되어 있는 경량토사층을 시공하는 단계; 및 상기 경량토사층의 상면에 표층으로 아스팔트 또는 시멘트로 포장되는 도로포장층을 시공하는 단계로 이루어진 것을 특징으로 한다.
Top topping construction method of underground tunnel structure
개착식 지하 터널 구조물의 소음 진동 저감을 위한 상부 토핑을 시공하는 방법
KIM DONG WOAN (Autor:in) / KIM YOUNG PIL (Autor:in) / JUN JIN TAEK (Autor:in) / JEONG YOUNG DO (Autor:in)
27.02.2019
Patent
Elektronische Ressource
Koreanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Top topping construction method of underground tunnel structure
Europäisches Patentamt | 2019
Construction method of underground structure crossing existing tunnel
Europäisches Patentamt | 2023