The present invention relates to a drainage work method for maximizing drainage efficiency. In the case of a golf course, after about three to four years have elapsed since the new construction, the problem of poor drainage has started to occur and further repair work is essential. In the existing method, excavation and replacement works are performed only on the part where a main drain pipe is installed with a fish bone shape so that the problem of poor drainage is not fundamentally improved. To solve the above problem, the present invention collectively replaces all the soil in the area with poor drainage in terms of the drainage improvement method of the soil and has an optimum drainage force depending on the topography by differently making the size of gravel used depending on a slope surface and the topography in the terms of a gravel layer. Since a game can be played right after the rain, the present invention can greatly improve course competitiveness and customer satisfaction. Further, the present invention can reduce the cost by extending the repair cycle of the same area of poor drainage by 3 to 5 times, resulting in an industrial effect that improves golf course management.
본 발명은 배수효율을 극대화하는 배수공사 방법에 관한 것으로, 골프장의 경우 신규 조성 후 약 3~4년이 경과하면서 부터는 배수불량의 문제가 발생하기 시작 추가 보수공사가 필수적인데, 기존 방식은 어골형(생선가시 모양)으로 주배수관이 설치되는 부분만을 굴착하고 치환하는 공사를 실시하여 배수불량의 문제가 근본적으로 개선되지 않는 문제가 있어, 이를 해결하기 위하여 본 발명은 토양의 배수개선 공법의 측면에서는 배수가 불량한 지역 전체 토양을 일괄적으로 치환하고, 자갈층의 측면에서는 경사면과 지형에 따라 사용되는 자갈의 크기를 달리하여 구성하여 지형에 따른 최적의 배수력을 갖도록 하여, 비가 내린 직후에도 경기를 진행할 수 있으므로 코스 경쟁력과 고객 만족도를 대폭 향상 시킬 수 있으며 동일 면적의 배수불량지역에 대한 재보수 주기를 3~5배 연장함으로써 비용절감의 효과를 가져와 골프장 경영개선을 이루는 산업상 효과도 발생하게 된다.
The present invention relates to a drainage work method for maximizing drainage efficiency. In the case of a golf course, after about three to four years have elapsed since the new construction, the problem of poor drainage has started to occur and further repair work is essential. In the existing method, excavation and replacement works are performed only on the part where a main drain pipe is installed with a fish bone shape so that the problem of poor drainage is not fundamentally improved. To solve the above problem, the present invention collectively replaces all the soil in the area with poor drainage in terms of the drainage improvement method of the soil and has an optimum drainage force depending on the topography by differently making the size of gravel used depending on a slope surface and the topography in the terms of a gravel layer. Since a game can be played right after the rain, the present invention can greatly improve course competitiveness and customer satisfaction. Further, the present invention can reduce the cost by extending the repair cycle of the same area of poor drainage by 3 to 5 times, resulting in an industrial effect that improves golf course management.
본 발명은 배수효율을 극대화하는 배수공사 방법에 관한 것으로, 골프장의 경우 신규 조성 후 약 3~4년이 경과하면서 부터는 배수불량의 문제가 발생하기 시작 추가 보수공사가 필수적인데, 기존 방식은 어골형(생선가시 모양)으로 주배수관이 설치되는 부분만을 굴착하고 치환하는 공사를 실시하여 배수불량의 문제가 근본적으로 개선되지 않는 문제가 있어, 이를 해결하기 위하여 본 발명은 토양의 배수개선 공법의 측면에서는 배수가 불량한 지역 전체 토양을 일괄적으로 치환하고, 자갈층의 측면에서는 경사면과 지형에 따라 사용되는 자갈의 크기를 달리하여 구성하여 지형에 따른 최적의 배수력을 갖도록 하여, 비가 내린 직후에도 경기를 진행할 수 있으므로 코스 경쟁력과 고객 만족도를 대폭 향상 시킬 수 있으며 동일 면적의 배수불량지역에 대한 재보수 주기를 3~5배 연장함으로써 비용절감의 효과를 가져와 골프장 경영개선을 이루는 산업상 효과도 발생하게 된다.
Method of constructing golf course
골프장 배수공사 특수공법
GU YOUNG SO (Autor:in)
03.05.2019
Patent
Elektronische Ressource
Koreanisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Europäisches Patentamt | 2024
|The structure of constructing grass of golf course and the method thereof
Europäisches Patentamt | 2024
|TIBKAT | 1998
|TIBKAT | 1974
|