Construction method of sheet pile
The present invention relates to a construction method of a sheet pile comprising: a step (S1) of installing a preceding sheet pile (10) in the ground; a step (S2) of lowering an outer casing (20) while forming an excavation hole (6) to install the outer casing (20) in the ground; a step (S3) of installing an inner casing (30) with a cut portion (32) in the excavation hole (6) to allow the cut portion (32) to face an end coupling unit of the preceding sheet pile (10); a step (S4) of lowering the end coupling unit (12) of a following sheet pile (10a) into the ground along the inner casing (30) while the end coupling unit (12) of the following sheet pile (10a) passes through the cut portion (32) of the inner casing (30) to be coupled to the end coupling unit (12) of the preceding sheet pile (10); and a step (S5) of drawing the inner casing (30) and backfilling the excavation hole (6). According to the present invention, a sheet pile can be easily and precisely installed without vibration or noise.
본 발명은 시트파일 시공방법에 관한 것으로서, 선행 시트파일(10)을 지중에 설치하는 단계(S1); 굴착공(6)을 형성하면서 외부케이싱(20)을 하강시켜서 지중에 설치하는 단계(S2); 절개부(32)가 형성된 내부케이싱(30)을 그 절개부(32)가 선행 시트파일(10)의 단부결합부(12)에 면하도록 굴착공(6) 내에 설치하는 단계(S3); 후행 시트파일(10a)의 단부결합부(12)가 내부케이싱(30)의 절개부(32)를 통과하여 선행 시트파일(10)의 단부결합부(12)에 결합된 상태에서 내부케이싱(30)을 따라 지중으로 하강시키는 단계(S4); 내부케이싱(30)을 인발하고 굴착공(6)에 되메움하는 단계(S5)를 포함한다. 본 발명에 따르면, 진동이나 소음없이 용이하고 정밀하게 시트파일을 설치할 수 있다.
Construction method of sheet pile
The present invention relates to a construction method of a sheet pile comprising: a step (S1) of installing a preceding sheet pile (10) in the ground; a step (S2) of lowering an outer casing (20) while forming an excavation hole (6) to install the outer casing (20) in the ground; a step (S3) of installing an inner casing (30) with a cut portion (32) in the excavation hole (6) to allow the cut portion (32) to face an end coupling unit of the preceding sheet pile (10); a step (S4) of lowering the end coupling unit (12) of a following sheet pile (10a) into the ground along the inner casing (30) while the end coupling unit (12) of the following sheet pile (10a) passes through the cut portion (32) of the inner casing (30) to be coupled to the end coupling unit (12) of the preceding sheet pile (10); and a step (S5) of drawing the inner casing (30) and backfilling the excavation hole (6). According to the present invention, a sheet pile can be easily and precisely installed without vibration or noise.
본 발명은 시트파일 시공방법에 관한 것으로서, 선행 시트파일(10)을 지중에 설치하는 단계(S1); 굴착공(6)을 형성하면서 외부케이싱(20)을 하강시켜서 지중에 설치하는 단계(S2); 절개부(32)가 형성된 내부케이싱(30)을 그 절개부(32)가 선행 시트파일(10)의 단부결합부(12)에 면하도록 굴착공(6) 내에 설치하는 단계(S3); 후행 시트파일(10a)의 단부결합부(12)가 내부케이싱(30)의 절개부(32)를 통과하여 선행 시트파일(10)의 단부결합부(12)에 결합된 상태에서 내부케이싱(30)을 따라 지중으로 하강시키는 단계(S4); 내부케이싱(30)을 인발하고 굴착공(6)에 되메움하는 단계(S5)를 포함한다. 본 발명에 따르면, 진동이나 소음없이 용이하고 정밀하게 시트파일을 설치할 수 있다.
Construction method of sheet pile
시트파일 시공방법
LIM MOON SU (Autor:in) / CHUNG YOUN SOON (Autor:in)
23.05.2019
Patent
Elektronische Ressource
Koreanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
SHEET PILE CONSTRUCTION METHOD, SHEET PILE CONSTRUCTION DEVICE, AND HOLDING TOOL
Europäisches Patentamt | 2019
|STEEL SHEET PILE, AND CONSTRUCTION METHOD OF STEEL SHEET PILE
Europäisches Patentamt | 2022
|