Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Slab panel drop construction method and device used therein
The present invention relates to a slab panel drop construction method, capable of minimizing noise, dust and civil complaints during construction and improving working safety and construction efficiency, and an apparatus used therefor. The present invention includes: an SL body (1100) comprising a wall panel fixing piece (1110), and a beam fixing piece (1130); a beam fixing SL (1300) comprising a coupling block (1310); a soffit length (SL, 1000) comprising a beam fixing piece (1500) with an elongated groove (1510); a beam (2000) into which a slab panel is inserted; a prop head (3000) connecting the beam (2000); a prop head guide (4000) adjusting the beam; a descending machine (5000) dropping the beam and the slab panel slowly; a fall prevention device (6000) preventing the beam from falling forcibly; a supporter connection member (7000) preventing a supporter from falling to one side; and a supporter (9000) dropping the slab panel when released.
본 발명은 빔, 존치형서포트, 슬라브패널 순으로 설치하여 콘크리트를 타설하고 천장콘크리트를 양생시킨 후 존치형서포를 축으로 빔과 슬라브패널을 일체로 드롭하여 해체함으로써 거푸집 시공시 슬라브패널의 설치 및 해체가 용이할 뿐만 아니라, 더욱 향상된 작업안전성 및 시공 효율성과 공사중 발생하는 소음, 분진, 민원을 최소화한 슬라브패널 드롭시공공법 및 그에 사용되는 장치에 관한 것으로, 벽면에 체결되는 벽체패널 상부에 설치되고, 빔(BEAM, 2000)과 슬라브패널(S)이 설치되는 것으로, 벽체패널 상부에 설치할 수 있도록 형성된 벽체패널 고정편(1110)과, 고정편에서 상부 "n" 형상으로 연장·절곡되어 일측에 빔과 슬라브패널을 체결할 수 있도록 하며 내측에 빔고정SL(1300)이 슬라이딩되어 체결될 수 있도록 단턱(1150)이 형성된 빔고정편(1130)으로 이루어진 SL본체(1100)와; 본체 내부에 삽입설치되되, 빔고정편(1500)을 고정핀(P)으로 체결할 수 있도록 하는 체결블록(1310)으로 이루어진 빔고정SL(1300)과; 빔고정SL(1300)에 일측에 고정핀(P)으로 체결되며, 타측은 빔에 고정핀(P)으로 체결되어 빔을 고정함과 아울러 빔을 낙하시킬 때 일정거리만 낙하하도록 장홈(1510)이 형성된 빔고정편(1500)으로 구성된 SL(SOFFIT LENGTH, 1000)과; SL에 설치되며, 슬라브패널(SLAB PANEL)이 삽입설치되는 빔(BEAM, 2000)과; 빔(BEAM, 2000)을 연결하는 프롭헤드(PROP HEAD, 3000)와; 프롭헤드 하부 및 서포터(9000)의 하부에 구비되어 프롭헤드를 지지하고 빔을 조정하는 분리형 프롭헤드 가이드(4000)와; 프롭헤드가이드 하부의 서포터(9000)에 구비되어 빔과 슬라브패널을 서서히 하강시키는 완강장치(5000)와; 서포터의 외측에 체결되어 프롭헤드 또는 프롭헤드가이드의 하부에 위치하여 빔과 프롭헤드 또는 프롭헤드가이드를 지지하여 빔이 하부로 강제 낙하하는 것을 방지하는 낙하방지장치(6000)와; 서포터의 외측에 체결되어 프롭헤드 또는 프롭헤드가이드의 하부에 위치하여 빔과 프롭헤드 또는 프롭헤드가이드가 일정거리 만큼 낙하하도록 하고, 연결빔으로 서로연결하여 서포터가 일측으로 넘어지는 것을 방지하는 서포터연결부재(7000)과; 프롭헤드 하부에서 프롭헤드를 지지하며, 해제시에는 슬라브패널을 자중에 의해 하강시키는 서포터(9000)를 포함하는 것을 특징으로 한다.
Slab panel drop construction method and device used therein
The present invention relates to a slab panel drop construction method, capable of minimizing noise, dust and civil complaints during construction and improving working safety and construction efficiency, and an apparatus used therefor. The present invention includes: an SL body (1100) comprising a wall panel fixing piece (1110), and a beam fixing piece (1130); a beam fixing SL (1300) comprising a coupling block (1310); a soffit length (SL, 1000) comprising a beam fixing piece (1500) with an elongated groove (1510); a beam (2000) into which a slab panel is inserted; a prop head (3000) connecting the beam (2000); a prop head guide (4000) adjusting the beam; a descending machine (5000) dropping the beam and the slab panel slowly; a fall prevention device (6000) preventing the beam from falling forcibly; a supporter connection member (7000) preventing a supporter from falling to one side; and a supporter (9000) dropping the slab panel when released.
본 발명은 빔, 존치형서포트, 슬라브패널 순으로 설치하여 콘크리트를 타설하고 천장콘크리트를 양생시킨 후 존치형서포를 축으로 빔과 슬라브패널을 일체로 드롭하여 해체함으로써 거푸집 시공시 슬라브패널의 설치 및 해체가 용이할 뿐만 아니라, 더욱 향상된 작업안전성 및 시공 효율성과 공사중 발생하는 소음, 분진, 민원을 최소화한 슬라브패널 드롭시공공법 및 그에 사용되는 장치에 관한 것으로, 벽면에 체결되는 벽체패널 상부에 설치되고, 빔(BEAM, 2000)과 슬라브패널(S)이 설치되는 것으로, 벽체패널 상부에 설치할 수 있도록 형성된 벽체패널 고정편(1110)과, 고정편에서 상부 "n" 형상으로 연장·절곡되어 일측에 빔과 슬라브패널을 체결할 수 있도록 하며 내측에 빔고정SL(1300)이 슬라이딩되어 체결될 수 있도록 단턱(1150)이 형성된 빔고정편(1130)으로 이루어진 SL본체(1100)와; 본체 내부에 삽입설치되되, 빔고정편(1500)을 고정핀(P)으로 체결할 수 있도록 하는 체결블록(1310)으로 이루어진 빔고정SL(1300)과; 빔고정SL(1300)에 일측에 고정핀(P)으로 체결되며, 타측은 빔에 고정핀(P)으로 체결되어 빔을 고정함과 아울러 빔을 낙하시킬 때 일정거리만 낙하하도록 장홈(1510)이 형성된 빔고정편(1500)으로 구성된 SL(SOFFIT LENGTH, 1000)과; SL에 설치되며, 슬라브패널(SLAB PANEL)이 삽입설치되는 빔(BEAM, 2000)과; 빔(BEAM, 2000)을 연결하는 프롭헤드(PROP HEAD, 3000)와; 프롭헤드 하부 및 서포터(9000)의 하부에 구비되어 프롭헤드를 지지하고 빔을 조정하는 분리형 프롭헤드 가이드(4000)와; 프롭헤드가이드 하부의 서포터(9000)에 구비되어 빔과 슬라브패널을 서서히 하강시키는 완강장치(5000)와; 서포터의 외측에 체결되어 프롭헤드 또는 프롭헤드가이드의 하부에 위치하여 빔과 프롭헤드 또는 프롭헤드가이드를 지지하여 빔이 하부로 강제 낙하하는 것을 방지하는 낙하방지장치(6000)와; 서포터의 외측에 체결되어 프롭헤드 또는 프롭헤드가이드의 하부에 위치하여 빔과 프롭헤드 또는 프롭헤드가이드가 일정거리 만큼 낙하하도록 하고, 연결빔으로 서로연결하여 서포터가 일측으로 넘어지는 것을 방지하는 서포터연결부재(7000)과; 프롭헤드 하부에서 프롭헤드를 지지하며, 해제시에는 슬라브패널을 자중에 의해 하강시키는 서포터(9000)를 포함하는 것을 특징으로 한다.
Slab panel drop construction method and device used therein
슬라브패널 드롭시공공법 및 그에 사용되는 장치
BAEK HUI JEONG (Autor:in) / KIM KYE WHAN (Autor:in) / LIM NAM GI (Autor:in)
10.10.2019
Patent
Elektronische Ressource
Koreanisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Slab panel drop construction method and device used therein
Europäisches Patentamt | 2019
Method for constructing flat slab structure with drop panel
Europäisches Patentamt | 2021
Method for constructing flat slab structure with drop panel
Europäisches Patentamt | 2020
|LAYERED PANEL FLOOR SLAB BRIDGE AND CONSTRUCTION METHOD OF LAYERED PANEL SLAB BRIDGE
Europäisches Patentamt | 2020
|