PSC Innovative PSC simple bridge construction method
The present invention relates to an innovative PSC simple bridge construction method, which includes: a girder manufacturing step of manufacturing PSC girders and firstly tensioning each of the girders by PS steel materials; a girder mounting step of installing temporary supports on an abutment and a pier and mounting the girders on the temporary supports; a floor plate placing step of placing concrete of a floor plate into the entire upper side of the girders; a tensioning step of secondarily tensioning each of the girders by the PS steel materials; and a step of installing the bridge supports on the abutment and the pier by precisely adjusting the same and mounting the girders on the bridge supports by removing the temporary supports, wherein the girder manufacturing step includes a process of installing anchoring device trumpet molds for forming anchoring devices for maintenance. The innovative PSC simple bridge construction method manufactures the firstly tensioned girders, mounts the girders on the abutment and the pier in a site, installs the concrete of the floor plate on the entire upper side of the mounted girders, and then secondarily tensions the girders, thereby increasing prestress introducing efficiency in the entire section of the girders. Moreover, the innovative PSC simple bridge construction method forms the anchoring devices for maintenance by easily pulling the anchoring devices by using the anchoring device trumpet mold pulling devices after the anchoring devices for maintenance are formed on both side surface of a lower flange of the girders, thereby forming the anchoring devices for maintenance having excellent economic feasibility and constructability and easily implementing tension and retension for maintenance by the necessity in case of long-term common use of a continuous bridge.
본 발명은, PSC 거더들을 제작하고 상기 거더들 각각을 PS강재로 1차 긴장하는 거더 제작 단계; 교대 및 교각에 임시받침들을 설치하고 상기 임시받침들 위에 상기 거더들을 거치하는 거더 거치 단계; 상기 거더들의 상측 전체에 바닥판 콘크리트를 타설하는 바닥판 타설 단계; 상기 거더들 각각을 PS강재로 2차 긴장하는 긴장 단계; 상기 교대 및 교각에 교량받침들을 정밀하게 조정하여 설치하고, 상기 임시받침들을 제거하여 상기 거더들을 상기 교량받침들에 거치하는 단계; 순으로 시공하고, 상기 거더 제작 단계는, 유지관리용 정착구를 형성하기 위한 정착구 트럼펫 몰드를 설치하는 과정을 포함하는 것을 특징으로 하는 혁신적인 PSC 단순교 시공방법에 관한 것으로서, 1차 긴장된 거더들을 제작한 후 현장에서 교대 및 교각에 거더들을 거치한 후 거치된 거더들의 상측 전구간에 바닥판 콘크리트를 설치하고, 2차 긴장을 실시함으로써, 거더의 전 구간에 프리스트레스 도입효율을 증대시킬 수 있고, 거더의 하면플랜지 양측면에 유지관리용 정착구가 형성되도록 시공한 후 정착구 트럼펫 몰드 인발장치를 이용하여 용이하게 인발하여 유지관리용 정착구를 형성함으로써, 경제성과 시공성이 뛰어난 유지관리용 정착구를 형성할 수 있음과 동시에 연속교의 장기 공용 시 필요에 의해 유지관리를 위한 긴장 및 재긴장의 실시가 용이하게 이루어질 수 있는 효과를 제공할 수 있다.
PSC Innovative PSC simple bridge construction method
The present invention relates to an innovative PSC simple bridge construction method, which includes: a girder manufacturing step of manufacturing PSC girders and firstly tensioning each of the girders by PS steel materials; a girder mounting step of installing temporary supports on an abutment and a pier and mounting the girders on the temporary supports; a floor plate placing step of placing concrete of a floor plate into the entire upper side of the girders; a tensioning step of secondarily tensioning each of the girders by the PS steel materials; and a step of installing the bridge supports on the abutment and the pier by precisely adjusting the same and mounting the girders on the bridge supports by removing the temporary supports, wherein the girder manufacturing step includes a process of installing anchoring device trumpet molds for forming anchoring devices for maintenance. The innovative PSC simple bridge construction method manufactures the firstly tensioned girders, mounts the girders on the abutment and the pier in a site, installs the concrete of the floor plate on the entire upper side of the mounted girders, and then secondarily tensions the girders, thereby increasing prestress introducing efficiency in the entire section of the girders. Moreover, the innovative PSC simple bridge construction method forms the anchoring devices for maintenance by easily pulling the anchoring devices by using the anchoring device trumpet mold pulling devices after the anchoring devices for maintenance are formed on both side surface of a lower flange of the girders, thereby forming the anchoring devices for maintenance having excellent economic feasibility and constructability and easily implementing tension and retension for maintenance by the necessity in case of long-term common use of a continuous bridge.
본 발명은, PSC 거더들을 제작하고 상기 거더들 각각을 PS강재로 1차 긴장하는 거더 제작 단계; 교대 및 교각에 임시받침들을 설치하고 상기 임시받침들 위에 상기 거더들을 거치하는 거더 거치 단계; 상기 거더들의 상측 전체에 바닥판 콘크리트를 타설하는 바닥판 타설 단계; 상기 거더들 각각을 PS강재로 2차 긴장하는 긴장 단계; 상기 교대 및 교각에 교량받침들을 정밀하게 조정하여 설치하고, 상기 임시받침들을 제거하여 상기 거더들을 상기 교량받침들에 거치하는 단계; 순으로 시공하고, 상기 거더 제작 단계는, 유지관리용 정착구를 형성하기 위한 정착구 트럼펫 몰드를 설치하는 과정을 포함하는 것을 특징으로 하는 혁신적인 PSC 단순교 시공방법에 관한 것으로서, 1차 긴장된 거더들을 제작한 후 현장에서 교대 및 교각에 거더들을 거치한 후 거치된 거더들의 상측 전구간에 바닥판 콘크리트를 설치하고, 2차 긴장을 실시함으로써, 거더의 전 구간에 프리스트레스 도입효율을 증대시킬 수 있고, 거더의 하면플랜지 양측면에 유지관리용 정착구가 형성되도록 시공한 후 정착구 트럼펫 몰드 인발장치를 이용하여 용이하게 인발하여 유지관리용 정착구를 형성함으로써, 경제성과 시공성이 뛰어난 유지관리용 정착구를 형성할 수 있음과 동시에 연속교의 장기 공용 시 필요에 의해 유지관리를 위한 긴장 및 재긴장의 실시가 용이하게 이루어질 수 있는 효과를 제공할 수 있다.
PSC Innovative PSC simple bridge construction method
혁신적인 PSC 단순교 시공방법
OH MIN SOO (Autor:in)
25.11.2020
Patent
Elektronische Ressource
Koreanisch
IPC:
E01D
BRIDGES
,
Brücken
PSC Innovative PSC continuous bridge construction method
Europäisches Patentamt | 2019
|Sustainable bridge construction through innovative advances
Online Contents | 2008
|Sustainable bridge construction through innovative advances
British Library Conference Proceedings | 2008
|Innovative Construction Methods for Bridge Structures
British Library Conference Proceedings | 1997
|