CONSTRUCTION METOD FOR MAIN TOWER STRUCTURE OF CABLE STAYED GIRDIR BRIDGE HAVING AMUSEMENT FACILITIES
The present invention relates to a method of constructing a cable-stayed girder bridge including an amusement facility. A cable-stayed girder bridge includes: a bridge tower part (100) of the cable-stayed girder bridge; a rotary shaft part (200) installed across the center of the bridge tower part (100); and an amusement facility (300) installed in the bridge tower part (100) so as to be rotated by the rotary shaft part (200). The method includes the following steps of: installing the bridge tower part (100); installing a temporary vent (11) and a girder (10) in a row, while excluding a partial area of one side of the bridge tower part (100) such that a working space (31) of equipment (30) for installing the amusement facility (300) can be secured; installing the amusement facility (300) through the equipment (30) in the working space (31); installing the temporary vent (11) and the girder (10) with respect to the working space (31); and installing a cable (112) with respect to the bridge tower part (100) and the girder (10), and dismantling the temporary vent (11). Therefore, as a structure has a special function and scenery, the structure can function as a tourism destination by becoming a landmark in the area where the structure is installed.
본 발명은 사장교의 주탑부(100)와, 상기 주탑부(100)의 중앙부를 가로질러 설치된 회전축부(200)와, 상기 회전축부(200)에 의해 회전구동이 가능하도록 상기 주탑부(100)에 설치된 유희시설(300)을 포함하는 사장교의 시공방법에 관한 것으로서, 상기 주탑부(100)를 설치하는 단계; 가설벤트(11) 및 거더(10)를 열지어 설치하되, 상기 유희시설(300)의 설치를 위한 장비(30)의 작업공간(31)이 확보되도록, 상기 주탑부(100) 일측의 일부 영역을 제외하고 설치하는 단계; 상기 작업공간(31)에서 상기 장비(30)에 의해 상기 유희시설(300)을 설치하는 유희시설 설치단계; 상기 작업공간(31)에 대하여 상기 가설벤트(11) 및 거더(10)를 설치하는 단계; 상기 주탑부(100) 및 거더(10)에 대하여 케이블(112)을 설치하고, 상기 가설벤트(11)를 해체하는 단계;를 포함하는 것을 특징으로 하는 유희시설을 구비한 사장교의 시공방법을 제시함으로써, 특별한 기능과 경관을 갖춤으로서, 그 구조물이 설치된 지역의 랜드마크가 되어 관광상품으로서의 역할을 할 수 있도록 한다.
CONSTRUCTION METOD FOR MAIN TOWER STRUCTURE OF CABLE STAYED GIRDIR BRIDGE HAVING AMUSEMENT FACILITIES
The present invention relates to a method of constructing a cable-stayed girder bridge including an amusement facility. A cable-stayed girder bridge includes: a bridge tower part (100) of the cable-stayed girder bridge; a rotary shaft part (200) installed across the center of the bridge tower part (100); and an amusement facility (300) installed in the bridge tower part (100) so as to be rotated by the rotary shaft part (200). The method includes the following steps of: installing the bridge tower part (100); installing a temporary vent (11) and a girder (10) in a row, while excluding a partial area of one side of the bridge tower part (100) such that a working space (31) of equipment (30) for installing the amusement facility (300) can be secured; installing the amusement facility (300) through the equipment (30) in the working space (31); installing the temporary vent (11) and the girder (10) with respect to the working space (31); and installing a cable (112) with respect to the bridge tower part (100) and the girder (10), and dismantling the temporary vent (11). Therefore, as a structure has a special function and scenery, the structure can function as a tourism destination by becoming a landmark in the area where the structure is installed.
본 발명은 사장교의 주탑부(100)와, 상기 주탑부(100)의 중앙부를 가로질러 설치된 회전축부(200)와, 상기 회전축부(200)에 의해 회전구동이 가능하도록 상기 주탑부(100)에 설치된 유희시설(300)을 포함하는 사장교의 시공방법에 관한 것으로서, 상기 주탑부(100)를 설치하는 단계; 가설벤트(11) 및 거더(10)를 열지어 설치하되, 상기 유희시설(300)의 설치를 위한 장비(30)의 작업공간(31)이 확보되도록, 상기 주탑부(100) 일측의 일부 영역을 제외하고 설치하는 단계; 상기 작업공간(31)에서 상기 장비(30)에 의해 상기 유희시설(300)을 설치하는 유희시설 설치단계; 상기 작업공간(31)에 대하여 상기 가설벤트(11) 및 거더(10)를 설치하는 단계; 상기 주탑부(100) 및 거더(10)에 대하여 케이블(112)을 설치하고, 상기 가설벤트(11)를 해체하는 단계;를 포함하는 것을 특징으로 하는 유희시설을 구비한 사장교의 시공방법을 제시함으로써, 특별한 기능과 경관을 갖춤으로서, 그 구조물이 설치된 지역의 랜드마크가 되어 관광상품으로서의 역할을 할 수 있도록 한다.
CONSTRUCTION METOD FOR MAIN TOWER STRUCTURE OF CABLE STAYED GIRDIR BRIDGE HAVING AMUSEMENT FACILITIES
유희시설을 구비한 사장교의 시공방법
PARK TAE KWUN (Autor:in)
07.12.2020
Patent
Elektronische Ressource
Koreanisch
Europäisches Patentamt | 2021
MAIN TOWER STRUCTURE FOR CABLE STAYED GIRDIR BRIDGE HAVING AMUSEMENT FACILITIES
Europäisches Patentamt | 2020
|MAIN TOWER STRUCTURE FOR CABLE STAYED GIRDIR BRIDGE HAVING AMUSEMENT FACILITIES
Europäisches Patentamt | 2021
ENTERING STRUCTURE FOR CABLE STAYED GIRDIR BRIDGE HAVING AMUSEMENT FACILITIES
Europäisches Patentamt | 2020
|ENTERING STRUCTURE FOR CABLE STAYED GIRDIR BRIDGE HAVING AMUSEMENT FACILITIES
Europäisches Patentamt | 2021