A CONSTRUCTION METHOD FOR ACCESS-FLOOR WITH FLOOR MODULES AND PADS THEREFOR
The present invention relates to a construction method of an access floor by a floor module comprising: a step (S1) of lifting materials such as H-beam, posts, pads, and floor panels above a waffle slab of a building; a step (S2) of fixing the posts on the upper surfaces of the H-beams, and arranging the floor panels on the upper ends of the posts to assemble floor modules; a step (S3) of using a lifting jig to arrange and fix the floor modules at a floor installation position above the waffle slab of the building by a crane; a step (S4) of adjusting the positions of the floor panels of the floor modules to arrange the floor panels close to each other within a preset tolerance; and a step (S5) of setting the floor modules. The step (S2) includes: a step (S21) of arranging the H-beams at preset intervals; a step (S22) of installing the posts above the H-beams at preset intervals; a step (S23) of arranging the pads on the upper ends of the posts; and a step (S24) of arranging corners of the floor panels above four corners′ portions of the pads to install the floor panels on the pads. In comparison to a conventional construction method of separately installing H-beam, posts, and floor panels at a construction site, access to floor construction work can be conveniently and quickly performed to shorten construction periods, reduce construction costs, reduce construction work personnel, and minimize work on a slab to greatly reduce the accident risk of workers.
본 발명은 플로어 모듈에 의한 액세스 플로어 시공방법에 관한 것으로, H빔들과 포스트들, 패드, 플로어 판넬과 같은 자재들을 건물의 와플 슬라브 위에 양중하는 단계(S1), 상기 H빔의 상면에 포스트들을 고정하고, 포스트들의 상단에 플로어 패널들을 배치하여 플로어 모듈을 조립하는 단계(S2), 상기 플로어 모듈을 양중 지그를 사용하여 크레인으로 건물의 와플 슬라브 위의 플로어 설치 위치에 배치, 고정하는 단계(S3), 상기 플로어 모듈들의 플로어 판넬들이 미리 설정된 공차내에서 서로 근접 배치되게 플로어 판넬들의 위치를 조정하는 단계(S4), 플로어 모듈을 셋팅하는 단계(S5)를 포함하며, 상기 단계(S2)는 H빔들을 미리 설정된 간격으로 배치하는 단계(S21)와, 상기 H빔들 위에 미리 설정된 간격으로 포스트들을 설치하는 단계(S22), 각각의 포스트 상단에 패드들을 배치하는 단계(S23), 및 상기 패드의 4 모서리부분 위에 플로어 판넬의 모서리를 배치하여 플로어 판넬을 패드에 설치하는 단계(S24)들을 포함하여 구성됨으로써, 종래 시공 현장에서 H빔과 포스트 및 플로어 판넬들을 별도로 설치하는 시공 방법과 비교하여 액세스 플로어 시공 작업을 간편하고 신속하게 수행할 수 있어서 공기 단축과 시공비용을 절감할 수 있고, 시공작업 인력을 절감할 수 있으며, 슬라브 위에서의 작업을 최소화하여 작업자의 안전사고 위험을 크게 감소시킬 수 있는 효과가 있다.
A CONSTRUCTION METHOD FOR ACCESS-FLOOR WITH FLOOR MODULES AND PADS THEREFOR
The present invention relates to a construction method of an access floor by a floor module comprising: a step (S1) of lifting materials such as H-beam, posts, pads, and floor panels above a waffle slab of a building; a step (S2) of fixing the posts on the upper surfaces of the H-beams, and arranging the floor panels on the upper ends of the posts to assemble floor modules; a step (S3) of using a lifting jig to arrange and fix the floor modules at a floor installation position above the waffle slab of the building by a crane; a step (S4) of adjusting the positions of the floor panels of the floor modules to arrange the floor panels close to each other within a preset tolerance; and a step (S5) of setting the floor modules. The step (S2) includes: a step (S21) of arranging the H-beams at preset intervals; a step (S22) of installing the posts above the H-beams at preset intervals; a step (S23) of arranging the pads on the upper ends of the posts; and a step (S24) of arranging corners of the floor panels above four corners′ portions of the pads to install the floor panels on the pads. In comparison to a conventional construction method of separately installing H-beam, posts, and floor panels at a construction site, access to floor construction work can be conveniently and quickly performed to shorten construction periods, reduce construction costs, reduce construction work personnel, and minimize work on a slab to greatly reduce the accident risk of workers.
본 발명은 플로어 모듈에 의한 액세스 플로어 시공방법에 관한 것으로, H빔들과 포스트들, 패드, 플로어 판넬과 같은 자재들을 건물의 와플 슬라브 위에 양중하는 단계(S1), 상기 H빔의 상면에 포스트들을 고정하고, 포스트들의 상단에 플로어 패널들을 배치하여 플로어 모듈을 조립하는 단계(S2), 상기 플로어 모듈을 양중 지그를 사용하여 크레인으로 건물의 와플 슬라브 위의 플로어 설치 위치에 배치, 고정하는 단계(S3), 상기 플로어 모듈들의 플로어 판넬들이 미리 설정된 공차내에서 서로 근접 배치되게 플로어 판넬들의 위치를 조정하는 단계(S4), 플로어 모듈을 셋팅하는 단계(S5)를 포함하며, 상기 단계(S2)는 H빔들을 미리 설정된 간격으로 배치하는 단계(S21)와, 상기 H빔들 위에 미리 설정된 간격으로 포스트들을 설치하는 단계(S22), 각각의 포스트 상단에 패드들을 배치하는 단계(S23), 및 상기 패드의 4 모서리부분 위에 플로어 판넬의 모서리를 배치하여 플로어 판넬을 패드에 설치하는 단계(S24)들을 포함하여 구성됨으로써, 종래 시공 현장에서 H빔과 포스트 및 플로어 판넬들을 별도로 설치하는 시공 방법과 비교하여 액세스 플로어 시공 작업을 간편하고 신속하게 수행할 수 있어서 공기 단축과 시공비용을 절감할 수 있고, 시공작업 인력을 절감할 수 있으며, 슬라브 위에서의 작업을 최소화하여 작업자의 안전사고 위험을 크게 감소시킬 수 있는 효과가 있다.
A CONSTRUCTION METHOD FOR ACCESS-FLOOR WITH FLOOR MODULES AND PADS THEREFOR
플로어 모듈에 의한 액세스 플로어 시공방법 및 그러한 시공을 위한 슬라이드가능한 패드
KIM JAE YOUNG (Autor:in)
23.12.2020
Patent
Elektronische Ressource
Koreanisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
A CONSTRUCTION METHOD FOR ACCESS-FLOOR WITH FLOOR MODULES AND PADS THEREFOR
Europäisches Patentamt | 2021
UNMANNED ACCESS FLOOR CONSTRUCTION SYSTEM AND ACCESS FLOOR CONSTRUCTION METHOD USING SAME
Europäisches Patentamt | 2023
|