The present invention relates to a method of constructing an overlapping column-type cast-in-place pile earth retaining wall using a guide device and, more specifically, to a method of constructing an overlapping column-type cast-in-place pile earth retaining wall using a guide device, in which an earthen retaining wall is formed by overlappingly constructing cast-in-place unsupported concrete piles in a certain thickness while the verticality thereof is maintained by using a guide device installed to maintain the verticality and overlapping length of the excavation, and stress sharing materials are installed on the cast-in-place piles at intervals determined by structural calculation. According to a desired embodiment of the present invention, the method comprises the steps of: (a) installing a guide device including a plurality of circular guide grooves disposed in a row such that portions of side surfaces of the guide grooves overlap each other; (b) skipping one or more guide grooves among the continuous guide grooves by using the guide device, and perforating holes at regular intervals and installing casings at the same time; (c) injecting and pouring concrete into the casings and withdrawing the casings to form primary concrete piles; (d) perforating holes and installing casings at the same time so that the side surfaces overlap the primary concrete piles adjacent in turn to the guide grooves in a part where the primary concrete piles are not formed; (e) inserting an H-pile into a part or the whole of the casings; (f) injecting and pouring concrete into the casings and withdrawing the casings to form secondary concrete piles; and (g) dismantling the guide device.
본 발명은 가이드 장치를 이용한 겹침 주열식 현장타설말뚝 흙막이 벽체 시공방법에 관한 것으로서, 더욱 상세하게는 굴착의 수직도와 겹침 길이를 유지할 수 있도록 설치되는 가이드 장치를 이용하여 수직도를 유지하면서 현장타설 무근콘크리트말뚝을 일정 두께가 겹쳐지도록 시공하여 흙막이 벽체를 형성하고, 구조계산에 의해 결정된 간격으로 현장타설 말뚝에 응력분담재를 설치하도록 하는 가이드 장치를 이용한 겹침 주열식 현장타설말뚝 흙막이 벽체 시공방법에 관한 것이다. 본 발명의 바람직한 일 실시예는 (a) 원형의 가이드홈이 일렬로 복수개가 측면의 일부가 상호 겹쳐지도록 구성되는 가이드 장치를 설치하는 단계; (b) 가이드 장치를 이용하여 연속된 가이드홈 중 한 개 또는 그 이상의 가이드홈을 건너뛰어 일정한 간격으로 천공과 동시에 케이싱을 설치하는 단계; (c) 케이싱의 내부에 콘크리트를 주입하여 타설하고 케이싱을 인발하여 1차 콘크리트 말뚝을 형성하는 단계; (d) 1차 콘크리트 말뚝이 형성되지 않은 부분의 가이드홈에 차례로 인접한 1차 콘크리트 말뚝과 측면이 겹쳐지도록 천공과 동시에 케이싱을 설치하는 단계; (e) 케이싱 일부 또는 전체에 H파일을 삽입하는 단계; (f) 케이싱에 콘크리트를 주입하여 타설하고 케이싱을 인발하여 2차 콘크리트 말뚝을 형성하는 단계; 및 (g) 가이드 장치를 해체하는 단계;를 포함하여 이루어진다.
Construction method of cast-in-placed-pile using guide apparatus
The present invention relates to a method of constructing an overlapping column-type cast-in-place pile earth retaining wall using a guide device and, more specifically, to a method of constructing an overlapping column-type cast-in-place pile earth retaining wall using a guide device, in which an earthen retaining wall is formed by overlappingly constructing cast-in-place unsupported concrete piles in a certain thickness while the verticality thereof is maintained by using a guide device installed to maintain the verticality and overlapping length of the excavation, and stress sharing materials are installed on the cast-in-place piles at intervals determined by structural calculation. According to a desired embodiment of the present invention, the method comprises the steps of: (a) installing a guide device including a plurality of circular guide grooves disposed in a row such that portions of side surfaces of the guide grooves overlap each other; (b) skipping one or more guide grooves among the continuous guide grooves by using the guide device, and perforating holes at regular intervals and installing casings at the same time; (c) injecting and pouring concrete into the casings and withdrawing the casings to form primary concrete piles; (d) perforating holes and installing casings at the same time so that the side surfaces overlap the primary concrete piles adjacent in turn to the guide grooves in a part where the primary concrete piles are not formed; (e) inserting an H-pile into a part or the whole of the casings; (f) injecting and pouring concrete into the casings and withdrawing the casings to form secondary concrete piles; and (g) dismantling the guide device.
본 발명은 가이드 장치를 이용한 겹침 주열식 현장타설말뚝 흙막이 벽체 시공방법에 관한 것으로서, 더욱 상세하게는 굴착의 수직도와 겹침 길이를 유지할 수 있도록 설치되는 가이드 장치를 이용하여 수직도를 유지하면서 현장타설 무근콘크리트말뚝을 일정 두께가 겹쳐지도록 시공하여 흙막이 벽체를 형성하고, 구조계산에 의해 결정된 간격으로 현장타설 말뚝에 응력분담재를 설치하도록 하는 가이드 장치를 이용한 겹침 주열식 현장타설말뚝 흙막이 벽체 시공방법에 관한 것이다. 본 발명의 바람직한 일 실시예는 (a) 원형의 가이드홈이 일렬로 복수개가 측면의 일부가 상호 겹쳐지도록 구성되는 가이드 장치를 설치하는 단계; (b) 가이드 장치를 이용하여 연속된 가이드홈 중 한 개 또는 그 이상의 가이드홈을 건너뛰어 일정한 간격으로 천공과 동시에 케이싱을 설치하는 단계; (c) 케이싱의 내부에 콘크리트를 주입하여 타설하고 케이싱을 인발하여 1차 콘크리트 말뚝을 형성하는 단계; (d) 1차 콘크리트 말뚝이 형성되지 않은 부분의 가이드홈에 차례로 인접한 1차 콘크리트 말뚝과 측면이 겹쳐지도록 천공과 동시에 케이싱을 설치하는 단계; (e) 케이싱 일부 또는 전체에 H파일을 삽입하는 단계; (f) 케이싱에 콘크리트를 주입하여 타설하고 케이싱을 인발하여 2차 콘크리트 말뚝을 형성하는 단계; 및 (g) 가이드 장치를 해체하는 단계;를 포함하여 이루어진다.
Construction method of cast-in-placed-pile using guide apparatus
가이드 장치를 이용한 겹침 주열식 현장타설말뚝 흙막이 벽체의 시공방법
SHIN YONG JAE (Autor:in) / YOON HAK SOO (Autor:in) / KIM MOON KYUNG (Autor:in) / KIM HAN JONG (Autor:in) / JANG JEOM YONG (Autor:in) / LIM HYEONG TAEK (Autor:in) / KIM NAM JU (Autor:in)
26.03.2021
Patent
Elektronische Ressource
Koreanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method of cast-in-placed-pile using guide apparatus
Europäisches Patentamt | 2022
Guide apparatus for cast-in-placed-pile and earth wall construction method thereof
Europäisches Patentamt | 2023
|Guide apparatus for cast-in-placed-pile and earth wall construction method thereof
Europäisches Patentamt | 2023
CIP Construction method of cast-in-placed-pile using steel rebar banding
Europäisches Patentamt | 2020
|