Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CONSTRUCTION METHOD OF SUBSTRUCTURE AND FOUNDATION
The present invention relates to a construction method of foundation horizontal work and connection with a substructure for a timber house, which can enhance workability and reduce personnel expenses by shortening a construction period. The construction method includes: a foundation wood and double button fixing step of placing a foundation wood, which is overlapped with a double button thereon, between a foundation wood horizontal line marked inside a cast and a double button horizontal line, and driving a screw bolt into the cast from the outside to the inside to fix the foundation wood and the double button in a state of protruding inward from an inner side of the cast; a hole forming step of vertically drilling a plurality of holes for an L-shaped anchor in a state that the foundation wood and the double button adhere to each other; an L-shaped anchor fixing step of inserting the L-shaped anchor into the hole for allowing the L-shaped anchor to penetrate upwards, fixing the L-shaped anchor by fastening a washer and a nut on a portion of the L-shaped anchor upper than the double button, and welding and connecting a portion of the L-shaped anchor under the foundation wood onto a steel bar; a concrete placing step of placing concrete until an upper end of concrete reaches a concrete horizontal line corresponding to a horizontal lower end line of the foundation wood; and a wall connection step of drilling, for standing and fixing a button plate at a lower part of a wall on the double button after the concrete sets, L-shaped anchor holes on portions corresponding to a plurality of L-shaped anchors on the button plate at the lower part of the wall to insert the L-shaped anchors and joint the same with the washer and the nut so as to connect from the substructure to the wall through the L-shaped anchor.
본 발명은 목조주택 토대 수평작업 및 기초와의 연결 시공방법은 토대목 위에 더블버튼이 포개지도록 한 것을 거푸집의 내측면에 표시된 토대목 수평라인과 더블버튼 수평라인 사이에 위치하도록 하면서 거푸집의 바깥쪽으로부터 안쪽으로 스크류볼트를 박아서 상기 토대목과 상기 더블버튼이 거푸집의 내측면으로부터 안쪽으로 돌출된 상태로 고정되게 하는 토대목 및 더블버튼 고정 단계와, 상기 토대목과 상기 더블버튼이 붙어있는 상태에서 상하 방향으로 다수의 L앙카자리 구멍을 뚫는 구멍 형성 단계와, L앙카를 상기 L앙카자리 구멍에 끼워 아래에서 위로 관통시킨 다음 상기 L앙카 중 상기 더블버튼보다 위에 위치하는 부분에는 와샤와 너트를 체결하여 상기 L앙카를 고정하고 상기 L앙카 중 상기 토대목보다 아래에 위치하는 부분은 철근에 용접하여 연결하는 L앙카 고정 단계와, 콘크리트의 상단이 상기 토대목의 수평 하단선에 해당하는 콘크리트수평라인에 도달할 때까지 콘크리트를 타설하는 콘크리트 타설 단계와, 상기 콘크리트가 굳어지면 벽체 하부의 버튼 플레이트를 상기 더블버튼 위에 세워 고정하기 위해 상기 벽체하부의 버튼 플레이트 중 다수의 상기 L앙카와 대응되는 부위에 L앙카 구멍을 뚫어 상기 L앙카를 끼워넣고 와샤와 너트로 조여서 기초와 벽체까지가 상기 L앙카로 연결되도록 하는 벽체 연결 단계를 포함한다.
CONSTRUCTION METHOD OF SUBSTRUCTURE AND FOUNDATION
The present invention relates to a construction method of foundation horizontal work and connection with a substructure for a timber house, which can enhance workability and reduce personnel expenses by shortening a construction period. The construction method includes: a foundation wood and double button fixing step of placing a foundation wood, which is overlapped with a double button thereon, between a foundation wood horizontal line marked inside a cast and a double button horizontal line, and driving a screw bolt into the cast from the outside to the inside to fix the foundation wood and the double button in a state of protruding inward from an inner side of the cast; a hole forming step of vertically drilling a plurality of holes for an L-shaped anchor in a state that the foundation wood and the double button adhere to each other; an L-shaped anchor fixing step of inserting the L-shaped anchor into the hole for allowing the L-shaped anchor to penetrate upwards, fixing the L-shaped anchor by fastening a washer and a nut on a portion of the L-shaped anchor upper than the double button, and welding and connecting a portion of the L-shaped anchor under the foundation wood onto a steel bar; a concrete placing step of placing concrete until an upper end of concrete reaches a concrete horizontal line corresponding to a horizontal lower end line of the foundation wood; and a wall connection step of drilling, for standing and fixing a button plate at a lower part of a wall on the double button after the concrete sets, L-shaped anchor holes on portions corresponding to a plurality of L-shaped anchors on the button plate at the lower part of the wall to insert the L-shaped anchors and joint the same with the washer and the nut so as to connect from the substructure to the wall through the L-shaped anchor.
본 발명은 목조주택 토대 수평작업 및 기초와의 연결 시공방법은 토대목 위에 더블버튼이 포개지도록 한 것을 거푸집의 내측면에 표시된 토대목 수평라인과 더블버튼 수평라인 사이에 위치하도록 하면서 거푸집의 바깥쪽으로부터 안쪽으로 스크류볼트를 박아서 상기 토대목과 상기 더블버튼이 거푸집의 내측면으로부터 안쪽으로 돌출된 상태로 고정되게 하는 토대목 및 더블버튼 고정 단계와, 상기 토대목과 상기 더블버튼이 붙어있는 상태에서 상하 방향으로 다수의 L앙카자리 구멍을 뚫는 구멍 형성 단계와, L앙카를 상기 L앙카자리 구멍에 끼워 아래에서 위로 관통시킨 다음 상기 L앙카 중 상기 더블버튼보다 위에 위치하는 부분에는 와샤와 너트를 체결하여 상기 L앙카를 고정하고 상기 L앙카 중 상기 토대목보다 아래에 위치하는 부분은 철근에 용접하여 연결하는 L앙카 고정 단계와, 콘크리트의 상단이 상기 토대목의 수평 하단선에 해당하는 콘크리트수평라인에 도달할 때까지 콘크리트를 타설하는 콘크리트 타설 단계와, 상기 콘크리트가 굳어지면 벽체 하부의 버튼 플레이트를 상기 더블버튼 위에 세워 고정하기 위해 상기 벽체하부의 버튼 플레이트 중 다수의 상기 L앙카와 대응되는 부위에 L앙카 구멍을 뚫어 상기 L앙카를 끼워넣고 와샤와 너트로 조여서 기초와 벽체까지가 상기 L앙카로 연결되도록 하는 벽체 연결 단계를 포함한다.
CONSTRUCTION METHOD OF SUBSTRUCTURE AND FOUNDATION
목조주택 토대 수평작업 및 기초와의 연결 시공방법
CHOI YOUNG TEAG (Autor:in)
05.10.2022
Patent
Elektronische Ressource
Koreanisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Europäisches Patentamt | 2020
|Substructure and Foundation Systems
Springer Verlag | 2024
|CONSTRUCTION METHOD FOR SUBSTRUCTURE FORMED BY LIFTING STRUCTURE ON FOUNDATION WORK
Europäisches Patentamt | 2022
|Bridge substructure and foundation design
TIBKAT | 1995
|