CONSTRUCTION METHOD FOR TURBULAR SUPPORTING POLE
The present invention relates to an installation method of a tubular support, which can replace an existing steel tower with the tubular support without a temporary facility using a mobile crane apparatus. The installation method of the tubular support of the present invention comprises: a foundation construction step of constructing a base unit, which is a foundation of a support, at an inside space of the steel tower; an equipment installation step of installing the mobile crane apparatus in a position close to the steel tower; and a support assembly step of stacking and installing a plurality of pipe material units at an upside of the base unit. In the support assembly step, by using the mobile crane apparatus, the pipe materials are sequentially assembled at least twice from the lower side to the upper side, so that the existing steel tower can be replaced with the tubular support without any temporary facility.
본 발명은 이동식 크레인장치를 이용하여 가시설물 없이 관형지지물로 기설철탑을 대체할 수 있는 관형지지물의 설치방법에 관한 것으로, 상기 철탑의 내측공간에 지지물의 기초인 베이스부를 공사하는 기초 공사단계; 상기 철탑과 근접한 위치에 상기 이동식 크레인장치를 설치하는 장비 설치단계; 및 상기 베이스부의 상측에서 복수개의 관재부를 적층 설치하는 지지물 조립단계; 를 포함하며, 상기 지지물 조립단계는, 상기 이동식 크레인장치를 이용하여 하측에서 상측으로 적어도 2회 이상 순차적으로 관재들이 조립되어 가시설물 없이 기설철탑을 관형지지물로 대체할 수 있다.
CONSTRUCTION METHOD FOR TURBULAR SUPPORTING POLE
The present invention relates to an installation method of a tubular support, which can replace an existing steel tower with the tubular support without a temporary facility using a mobile crane apparatus. The installation method of the tubular support of the present invention comprises: a foundation construction step of constructing a base unit, which is a foundation of a support, at an inside space of the steel tower; an equipment installation step of installing the mobile crane apparatus in a position close to the steel tower; and a support assembly step of stacking and installing a plurality of pipe material units at an upside of the base unit. In the support assembly step, by using the mobile crane apparatus, the pipe materials are sequentially assembled at least twice from the lower side to the upper side, so that the existing steel tower can be replaced with the tubular support without any temporary facility.
본 발명은 이동식 크레인장치를 이용하여 가시설물 없이 관형지지물로 기설철탑을 대체할 수 있는 관형지지물의 설치방법에 관한 것으로, 상기 철탑의 내측공간에 지지물의 기초인 베이스부를 공사하는 기초 공사단계; 상기 철탑과 근접한 위치에 상기 이동식 크레인장치를 설치하는 장비 설치단계; 및 상기 베이스부의 상측에서 복수개의 관재부를 적층 설치하는 지지물 조립단계; 를 포함하며, 상기 지지물 조립단계는, 상기 이동식 크레인장치를 이용하여 하측에서 상측으로 적어도 2회 이상 순차적으로 관재들이 조립되어 가시설물 없이 기설철탑을 관형지지물로 대체할 수 있다.
CONSTRUCTION METHOD FOR TURBULAR SUPPORTING POLE
관형지지물의 설치방법
LEE WON KYO (Autor:in)
14.12.2022
Patent
Elektronische Ressource
Koreanisch
Post weld treatment to improve the fatigue performance of turbular bridge structures
British Library Conference Proceedings | 2005
|