UNSUPPORTED FORMWORK CONSTRUCTION METHOD USING SOCKET MEMBER
An unsupported formwork construction method using a socket member is disclosed to exclude a supporting post when constructing a bridge pier using an unsupported formwork. The unsupported formwork construction method using the socket member according to the present invention comprises a first construction step of mounting and connecting a plurality of girders to a bridge substructure, a second construction step of preparing an unsupported formwork excluding a supporting post in at least one of locations where the girders and the bridge substructure meet, a third construction step of pouring and curing deck concrete on the bridge superstructure, and a fourth construction step of dismantling a supporting post and a formwork including the unsupported formwork.
소켓부재를 이용한 무지보 거푸집 시공방법이 개시된다. 본 발명에 따른 소켓부재를 이용한 무지보 거푸집 시공방법은, 교량 하부구조물에 다수 개의 거더를 거치하고 연결하는 제1 시공단계, 거더와 교량 하부구조물이 만나는 곳 중 적어도 하나의 부분에 동바리가 배제된 무지보 거푸집을 마련하는 제2 시공단계, 교량 상부구조물에 바닥판 콘크리트를 타설하고 양생하는 제3 시공단계, 무지보 거푸집을 포함하는 거푸집과 동바리를 해체하는 제4 시공단계를 포함한다.
UNSUPPORTED FORMWORK CONSTRUCTION METHOD USING SOCKET MEMBER
An unsupported formwork construction method using a socket member is disclosed to exclude a supporting post when constructing a bridge pier using an unsupported formwork. The unsupported formwork construction method using the socket member according to the present invention comprises a first construction step of mounting and connecting a plurality of girders to a bridge substructure, a second construction step of preparing an unsupported formwork excluding a supporting post in at least one of locations where the girders and the bridge substructure meet, a third construction step of pouring and curing deck concrete on the bridge superstructure, and a fourth construction step of dismantling a supporting post and a formwork including the unsupported formwork.
소켓부재를 이용한 무지보 거푸집 시공방법이 개시된다. 본 발명에 따른 소켓부재를 이용한 무지보 거푸집 시공방법은, 교량 하부구조물에 다수 개의 거더를 거치하고 연결하는 제1 시공단계, 거더와 교량 하부구조물이 만나는 곳 중 적어도 하나의 부분에 동바리가 배제된 무지보 거푸집을 마련하는 제2 시공단계, 교량 상부구조물에 바닥판 콘크리트를 타설하고 양생하는 제3 시공단계, 무지보 거푸집을 포함하는 거푸집과 동바리를 해체하는 제4 시공단계를 포함한다.
UNSUPPORTED FORMWORK CONSTRUCTION METHOD USING SOCKET MEMBER
소켓부재를 이용한 무지보 거푸집 시공방법
KIM MIN JOONG (Autor:in)
23.03.2023
Patent
Elektronische Ressource
Koreanisch
IPC:
E01D
BRIDGES
,
Brücken
UNSUPPORTED FORMWORK CONSTRUCTION METHOD USING SOCKET MEMBER
Europäisches Patentamt | 2023
Stair socket reinforcing formwork construction process
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2021
|Detachable and reusable unsupported floor side formwork and using method thereof
Europäisches Patentamt | 2023
|