Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building finishing material construction structure
The present invention relates to a finish material construction structure which slide-movably installs a first moving member with a first finish material on a first fixed member fixed on an outer wall, protects the first finish material finishing the outer wall of the building when an external force by a vibration or the like has occurred in the building or the contraction and expansion of the first finish material occurs by changes in the temperature, discharges rainwater through a drainage space formed between the first finish materials or a drainage hole formed on the first finish materials and through the drainage hole of the first fixed member, blocks the rainwater inversely flowing to by a first rainwater blocking member, and ventilates between the first finish material and the outer wall through first through sixth moving passages formed by installing the first fixed member, the first rainwater blocking member, and a rainwater guiding member. Therefore, drainage function can be displayed.
본 발명은 외벽에 고정되는 제1고정부재에 제1마감재가 설치되는 제1이동부재를 슬라이딩 이동할 수 있도록 설치하여, 건축물에서 진동 등에 의한 외력 발생 시 또는, 온도 변화에 의해 제1마감재의 수축 및 팽창작용 발생 시, 건축물의 외벽을 마감해주는 제1마감재를 보호하고, 제1마감재의 사이에 형성된 배수공간 또는 제1마감재에 형성된 배수구멍과, 제1고정부재의 배수구멍을 통해 빗물을 배출하고, 제1빗물 차단부재로 역류하는 빗물을 막아주며, 제1고정부재 및 제1빗물 차단부재 및 빗물 안내부재의 설치에 의해 형성되는 제1,2,3,4,5,6이동통로를 통해서 제1마감재와 외벽의 사이에서 환기를 할 수 있는 마감재 시공구조에 관한 것이다.
Building finishing material construction structure
The present invention relates to a finish material construction structure which slide-movably installs a first moving member with a first finish material on a first fixed member fixed on an outer wall, protects the first finish material finishing the outer wall of the building when an external force by a vibration or the like has occurred in the building or the contraction and expansion of the first finish material occurs by changes in the temperature, discharges rainwater through a drainage space formed between the first finish materials or a drainage hole formed on the first finish materials and through the drainage hole of the first fixed member, blocks the rainwater inversely flowing to by a first rainwater blocking member, and ventilates between the first finish material and the outer wall through first through sixth moving passages formed by installing the first fixed member, the first rainwater blocking member, and a rainwater guiding member. Therefore, drainage function can be displayed.
본 발명은 외벽에 고정되는 제1고정부재에 제1마감재가 설치되는 제1이동부재를 슬라이딩 이동할 수 있도록 설치하여, 건축물에서 진동 등에 의한 외력 발생 시 또는, 온도 변화에 의해 제1마감재의 수축 및 팽창작용 발생 시, 건축물의 외벽을 마감해주는 제1마감재를 보호하고, 제1마감재의 사이에 형성된 배수공간 또는 제1마감재에 형성된 배수구멍과, 제1고정부재의 배수구멍을 통해 빗물을 배출하고, 제1빗물 차단부재로 역류하는 빗물을 막아주며, 제1고정부재 및 제1빗물 차단부재 및 빗물 안내부재의 설치에 의해 형성되는 제1,2,3,4,5,6이동통로를 통해서 제1마감재와 외벽의 사이에서 환기를 할 수 있는 마감재 시공구조에 관한 것이다.
Building finishing material construction structure
마감재 시공구조
KIM SOON BERM (Autor:in)
28.07.2023
Patent
Elektronische Ressource
Koreanisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Europäisches Patentamt | 2022
|