Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Erosion Facility in Which a Rigid Tetragonal Structure and a Flexible Tetragonal Structure are Installed in a Complex Manner
An erosion control facility according to the present invention in which a rigid erosion control structure and a flexible erosion control structure are installed in a composite manner comprises: a plurality of rigid erosion control structures installed in the vertical direction on the ground of a valley to reduce the kinetic energy of debris flow and are installed at a predetermined distance from each other; and a flexible erosion control structure arranged downstream from the plurality of rigid erosion control structures to prevent the progress of debris flow and thereby allow the debris flow to be deposited. In addition, the erosion control facility of the present invention further includes at least one between a flow control structure provided on both sides of the plurality of rigid erosion control structures to prevent erosion of the valley side due to debris flow, and a plurality of erosion prevention units arranged on the ground in an area where the plurality of rigid erosion control structures are installed to prevent erosion of the valley surface due to debris flow. Thus, the present invention can gradually reduce the speed of the front end of the debris flow moving downstream of the valley.
본 발명에 따른 강성 사방구조체 및 연성 사방구조체가 복합식으로 설치되는 사방시설은, 계곡의 지면 상에 상하 방향으로 설치되어 토석류의 운동에너지를 저감시키며, 서로 소정 거리 이격되어 설치되는 복수 개의 강성 사방구조체, 상기 복수 개의 강성 사방구조체보다 하류에 배치되어 토석류의 진행을 방지함에 따라 토석류가 퇴적될 수 있도록 하는 연성 사방구조체를 포함하며, 이와 더불어 상기 복수 개의 강성 사방구조체의 양측에 구비되어 토석류에 의한 계곡 측면 침식을 방지하는 흐름제어구조체 및 상기 복수 개의 강성 사방구조체가 설치된 영역의 지면 상에 배열되어 토석류에 의한 계곡 지면 침식을 방지하는 복수 개의 침식방지유닛 중 적어도 어느 하나 이상을 포함한다.
Erosion Facility in Which a Rigid Tetragonal Structure and a Flexible Tetragonal Structure are Installed in a Complex Manner
An erosion control facility according to the present invention in which a rigid erosion control structure and a flexible erosion control structure are installed in a composite manner comprises: a plurality of rigid erosion control structures installed in the vertical direction on the ground of a valley to reduce the kinetic energy of debris flow and are installed at a predetermined distance from each other; and a flexible erosion control structure arranged downstream from the plurality of rigid erosion control structures to prevent the progress of debris flow and thereby allow the debris flow to be deposited. In addition, the erosion control facility of the present invention further includes at least one between a flow control structure provided on both sides of the plurality of rigid erosion control structures to prevent erosion of the valley side due to debris flow, and a plurality of erosion prevention units arranged on the ground in an area where the plurality of rigid erosion control structures are installed to prevent erosion of the valley surface due to debris flow. Thus, the present invention can gradually reduce the speed of the front end of the debris flow moving downstream of the valley.
본 발명에 따른 강성 사방구조체 및 연성 사방구조체가 복합식으로 설치되는 사방시설은, 계곡의 지면 상에 상하 방향으로 설치되어 토석류의 운동에너지를 저감시키며, 서로 소정 거리 이격되어 설치되는 복수 개의 강성 사방구조체, 상기 복수 개의 강성 사방구조체보다 하류에 배치되어 토석류의 진행을 방지함에 따라 토석류가 퇴적될 수 있도록 하는 연성 사방구조체를 포함하며, 이와 더불어 상기 복수 개의 강성 사방구조체의 양측에 구비되어 토석류에 의한 계곡 측면 침식을 방지하는 흐름제어구조체 및 상기 복수 개의 강성 사방구조체가 설치된 영역의 지면 상에 배열되어 토석류에 의한 계곡 지면 침식을 방지하는 복수 개의 침식방지유닛 중 적어도 어느 하나 이상을 포함한다.
Erosion Facility in Which a Rigid Tetragonal Structure and a Flexible Tetragonal Structure are Installed in a Complex Manner
강성 사방구조체 및 연성 사방구조체가 복합식으로 설치되는 사방시설
KWON YOUNG JUN (Autor:in) / JUN KYOUNG JAE (Autor:in) / KWON JUN HYUNG (Autor:in) / CHANYOUNG YUNE (Autor:in) / HAN KWANG DOO (Autor:in) / KIM HO SEOP (Autor:in)
15.01.2024
Patent
Elektronische Ressource
Koreanisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2022
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|