Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
ARRANGEMENT METHOD OF SUPPORTS OF OVERHEAD POWER TRANSMISSION LINES ON PERMANENTLY FROZEN SOILS
FIELD: power industry.SUBSTANCE: arrangement method of supports of overhead power transmission lines on permanently frozen soils, in which a casing pipe is driven and a pile is submerged into it. During pile submersion process, installation of stiff elements is performed onto the shaft of the pile by welding, for that purpose, location zone of stiff elements is marked on the pile. At pile driving, when the lower mark achieves the top level of the casing pipe, geometrical measurement of gaps is performed between the casing pipe and the pile, and as per measurement results, stiff elements are manufactured, which are welded in pairs on opposite sides in one vertical plane, and as the pipe is being submerged, the operation is repeated.EFFECT: increasing carrying capacity of a pile on horizontal loads; improving reliability due to action of forces of frost boil of the soil on the pile; reduction of labour input and material consumption.2 cl, 1 dwg
Изобретение относится к области энергетики, а точнее к свайным фундаментам опор линий электропередач, устраиваемых в различных типах грунтов. Способ обустройства опор воздушных линий передач на вечномерзлых грунтах, в котором забивают обсадную трубу и погружают в нее сваю. В процессе погружения сваи выполняют монтаж жестких элементов на ствол сваи с помощью сварки, для чего на свае делают отметку зоны расположения жестких элементов. При забивке сваи, когда нижняя отметка достигает уровня верха обсадной трубы, осуществляют геометрический замер зазоров между обсадной трубой и сваей и по результатам замеров изготавливают жесткие элементы, которые приваривают парами с противоположных сторон в одной вертикальной плоскости, по ходу погружения трубы операцию повторяют. Технический результат состоит в повышении несущей способности сваи на горизонтальные нагрузки, повышении надежности от воздействия сил морозного пучения грунта на сваю, снижении трудоемкости и материалоемкости. 1 з.п. ф-лы, 1 ил.
ARRANGEMENT METHOD OF SUPPORTS OF OVERHEAD POWER TRANSMISSION LINES ON PERMANENTLY FROZEN SOILS
FIELD: power industry.SUBSTANCE: arrangement method of supports of overhead power transmission lines on permanently frozen soils, in which a casing pipe is driven and a pile is submerged into it. During pile submersion process, installation of stiff elements is performed onto the shaft of the pile by welding, for that purpose, location zone of stiff elements is marked on the pile. At pile driving, when the lower mark achieves the top level of the casing pipe, geometrical measurement of gaps is performed between the casing pipe and the pile, and as per measurement results, stiff elements are manufactured, which are welded in pairs on opposite sides in one vertical plane, and as the pipe is being submerged, the operation is repeated.EFFECT: increasing carrying capacity of a pile on horizontal loads; improving reliability due to action of forces of frost boil of the soil on the pile; reduction of labour input and material consumption.2 cl, 1 dwg
Изобретение относится к области энергетики, а точнее к свайным фундаментам опор линий электропередач, устраиваемых в различных типах грунтов. Способ обустройства опор воздушных линий передач на вечномерзлых грунтах, в котором забивают обсадную трубу и погружают в нее сваю. В процессе погружения сваи выполняют монтаж жестких элементов на ствол сваи с помощью сварки, для чего на свае делают отметку зоны расположения жестких элементов. При забивке сваи, когда нижняя отметка достигает уровня верха обсадной трубы, осуществляют геометрический замер зазоров между обсадной трубой и сваей и по результатам замеров изготавливают жесткие элементы, которые приваривают парами с противоположных сторон в одной вертикальной плоскости, по ходу погружения трубы операцию повторяют. Технический результат состоит в повышении несущей способности сваи на горизонтальные нагрузки, повышении надежности от воздействия сил морозного пучения грунта на сваю, снижении трудоемкости и материалоемкости. 1 з.п. ф-лы, 1 ил.
ARRANGEMENT METHOD OF SUPPORTS OF OVERHEAD POWER TRANSMISSION LINES ON PERMANENTLY FROZEN SOILS
СПОСОБ ОБУСТРОЙСТВА ОПОР ВОЗДУШНЫХ ЛИНИЙ ПЕРЕДАЧ НА ВЕЧНОМЕРЗЛЫХ ГРУНТАХ
REVEL-MUROZ PAVEL ALEKSANDROVICH (Autor:in) / SMIRNOV NIKOLAJ VLADIMIROVICH (Autor:in) / KUMALLAGOV VITALIJ ALEKSANDROVICH (Autor:in) / SEMIN EVGENIJ EVGEN EVICH (Autor:in) / IVAKIN ALEKSANDR VLADIMIROVICH (Autor:in) / BOGATENKOV JURIJ VASIL EVICH (Autor:in) / ZOTOV MIKHAIL JUR EVICH (Autor:in)
10.07.2015
Patent
Elektronische Ressource
Russisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
PILE FOUNDATION FOR ARRANGEMENT OF SUPPORTS OF OVERHEAD POWER TRANSMISSION LINE
Europäisches Patentamt | 2015
|PILE FOUNDATION FOR SITUATING SUPPORTS OF OVERHEAD POWER TRANSMISSION LINES
Europäisches Patentamt | 2015
|METHOD FOR INSTALLING OVERHEAD TRANSMISSION LINE SUPPORTS ON PERMAFROST SOILS
Europäisches Patentamt | 2021
|Method for installing overhead transmission line supports on permafrost soils
Europäisches Patentamt | 2018
|METHOD FOR INSTALLING OVERHEAD TRANSMISSION LINE SUPPORTS IN PERMAFROST SOILS
Europäisches Patentamt | 2015
|